1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203:...

42
1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By: Jayson Choy Christie Williams Andy Ang Thomas Ou Naragain Phumchusri Raghav Himatsingka

Transcript of 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203:...

Page 1: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

1

XYZ Company

Supply Chain Optimization ProjectNetwork Optimization

Date: 04/25/2006

ISyE 6203: Transportation and Supply Chain Management

Prepared By:

Jayson Choy

Christie Williams

Andy Ang

Thomas Ou

Naragain Phumchusri

Raghav Himatsingka

Page 2: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

2

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 3: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

3

• Locations in Florida and California

• Each location has Multiple Operations

• Suppliers across USA

• Supplier shipments may be parcel, less-than-truckload or full truckload, some must be frozen or chilled

Introduction

Project goal: Reduce inbound transportation costs across the business while meeting customer service requirements.

Page 4: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

4

Timeline

Phase

Project kick-off & Deliverables Rationalization

Data Cleansing & Validation

Preliminary Modeling

Validation of Model

Generation of results & sensitivity Analyses

Jan Feb Mar Apr

Page 5: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

5

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 6: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

6

Key Deliverables

Create a graphic illustration of Current North American Supply Chain network

Document Current Volumes and Freight spend by mode to each location and in total

Identify and recommend North American Consolidation Points for most efficient route and capacity utilization

Create a graphic illustration of the Recommended New Supply Chain Network with all consolidation facility representations and conceptual lanes to each location

Page 7: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

7

California and Florida Supplier Locations

Page 8: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

8

Problem DefinitionBreakdown of Volume by Transportation

Costs

54%

46%

Florida California

Breakdown of Volume by Transportation Costs

54%

46%

Florida California

Breakdown of Volume by Weight

96%

4%

Florida California

Breakdown of Volume by Weight

96%

4%

Florida California

Breakdown of Volume by Shipment Frequency

76%

24%

Florida California

Breakdown of Volume by Shipment Frequency

76%

24%

Florida California

Florida

Page 9: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

9

Problem Definition

Breakdown of Florida's Volume by Cost

FTL LTL Parcel - Ground

Parcel - Air Produce Frozen

36%

26%

13%8%

11%

6%

LTL: Greatest Opportunity for Savings

Page 10: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

10

Problem Definition

• Focus on Consolidation of LTL shipments to Florida

• Eliminated Frozen and Chilled shipments from the Optimization model

• Included most FTL shipments by breaking them down

Page 11: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

11

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 12: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

12

Data Analysis

Florida Breakdown of Individual Business Units by Total Amount Paid

Merchandise58%

Food34%

Costuming0%

General Supplies8%

Others0%

Food (FOB)0%

Page 13: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

13

Data Analysis

Florida Breakdown of Individual Business Units by Shipment Count

Merchandise88%

General Supplies0%

Costuming0% Others

0%

Food2%

Food (FOB)10%

Page 14: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

14

Data Analysis

Florida Breakdown of Individual Business Units by Weight

Food49%

Others0%

General Supplies5%

Costuming0% Merchandise

21%

Food (FOB)25%

Page 15: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

15

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 16: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

16

Supplier Locations (LTL Florida)(Data Aggregation by 3-Digit Zip Code)

Page 17: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

17

To Consolidate LTL Shipments into FTL

ShipperShipper

XYZ CompanyXYZ Company

ShipperShipper

ShipperShipper

ShipperShipper

CPCP

FTL

LTL

LTL

LTL

LTL LTL

LTLLTL

LTL

Present Situation

Present Situation

Proposed Solution

Proposed Solution

LTL

LTL

Page 18: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

18

Proposed 2-Step Model

Step 1: Set Covering Model (SCM)

Step 2: Network Design Model (NDM)

To Generate Potential Consolidation Point Candidates

To Determine which Consolidation Points to Open/ Close

Page 19: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

19

Step 1: Set Covering Model (SCM)

• Maximize sum(i in Suppliers) y[i]

• s.t {sum(i in Suppliers) x[i] <= 30; forall(i in Suppliers)

• y[i] <= (sum(j in Suppliers) Matrix[i,j]*x[j])

• Integer Programming Model

• Model will decide 30 Potential Consolidation Points within 300 mile Radius

from Suppliers.To Maximize the Number of Suppliers which can be Covered by the CPs To Generate at

most 30 Potential CP locations To Ensure that

CPs are within 300 mile radius from Suppliers

Page 20: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

20

SCM Results: 30 Consolidation Points

Next Step:

CP Candidates will be fed into the Network Design Model (NDM)

Page 21: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

21

Step 2: Network Design Model (NDM)Model Objectives :

• To Decide which Consolidation Points to open or close

• To Determine whether Suppliers should Ship Direct to the company

• To Assign Suppliers to Consolidation Points

To Open or Close?

To Open or Close?

To Open or Close?

To Open or Close?

To Open or Close

To Open or Close?

To Open or Close?

To Open or Close?

To Open or Close?

Page 22: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

22

Objective : To Minimize Total Transportation Costs

(Direct shipments + Shipments via opened CP)

XYZ CompanyXYZ Company

ShipperShipper

Direct LTLShipment

Constraint I: If Supplier is not a Candidate CP• We either serve this 3 Digit zip via LTL shipments to the destination or via a consolidation point

CPCP

LTLShipment

Page 23: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

23

Step 2: Network Design Model (NDM)

Constraint II: If Supplier is a Candidate CP • Case 1: If NOT OPEN

We send LTL direct or via a designated CP

CPCP

XYZ Company

XYZ Company

LTL

Case 1CPCP

FTL

Page 24: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

24

Step 2: Network Design Model (NDM)

CPCP

XYZ Company

XYZ Company

Case 2

FTL

Constraint II: If Supplier is a Candidate CP • Case 2: If OPEN

We consolidate at CP and send FTL direct

Page 25: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

25

Step 2: Network Design Model (NDM)

Constraint III: Load Factor of 0.8• Total Inflow into CP < = [ 0.8 * Total Truckloads ]

CPCP 0.8 *

Constraint IV: Frequency• Minimum Truckloads going through

an Open CP per year > = 52

LTL

LTL

LTL

ie at least 1 truckload per week

Page 26: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

26

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 27: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

27

5 CP Locations

Page 28: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

28

Assignment of Suppliers

Page 29: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

29

CP Location I: Charlotte, NC

Page 30: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

30

CP Location II: Atlanta, GA

Page 31: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

31

CP Location III: Los Angeles, CA

Page 32: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

32

CP Location IV: Gulfport, MS

Page 33: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

33

CP Location V: Jackson, KY

Page 34: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

34

LTL Direct Shipments

Page 35: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

35

Cost Savings

1920

1770

1650

1700

1750

1800

1850

1900

1950

Cost Before Optimization ('000) Cost After Optimization ('000)

Less than 8% ReductionLess than 8% Reduction

8% Reduction8% Reduction

Page 36: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

36

Summary

CP LocationTruckloads

Per YearVolume

('000 lbs)

Number ofAssignedSuppliers

CharlotteNC 190 3800  102

AtlantaGA 52 1040 48

JacksonKY 52 1040 53

GulfportMS 52 1040 65 

Los Angeles CA 52 1040 28

Direct LTL - - 136

Page 37: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

37

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 38: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

38

Sensitivity Analysis

Effect of Shipment Frequency on CP

0

1

2

3

4

5

6

1 2 3 4 5 6 7

Shipments Per week

No

. of

Co

ns

olid

ati

on

P

oin

ts

Page 39: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

39

Sensitivity Analysis

Shipments

Per Week Charlotte Atlanta LA Gulfport Jackson

1 ☻ ☻ ☻ ☻ ☻

2 ☻ ☻ ☻ ☻ ☻

3 ☻ ☻ ☻    

4 ☻ ☻      

5 ☻        

6 ☻        

7 ☻        

Page 40: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

40

A. Introduction

B. Key Deliverables

C. Data Analysis

D. Mathematical Model

E. Recommendation

F. Sensitivity Analysis

G. Conclusion

Agenda

Page 41: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

41

Conclusion

• Key Learning– Counter intuitive peculiarities of LTL cost structure

(small volumes, backhauling …etc)

• Moving Forward– “Milk run” study on remaining LTL direct volumes– Optimization of other shipment modes

(e.g. parcel, frozen, chilled …etc)– Optimization of Florida bound shipments

Page 42: 1 XYZ Company Supply Chain Optimization Project Network Optimization Date: 04/25/2006 ISyE 6203: Transportation and Supply Chain Management Prepared By:

42

Q & A