March 25, 2016 In the Matter of Water Quality Certification for the State Route 128/253 Culvert Rehabilitation Project (Phase III, Part 2) 38.991, 123.3538 to 38.875, 123.1058 1 WDID No. 1B15162WNME, ECM PIN CW820346 Caltrans EA No. 0137813, EFIS No. 0100000134 APPLICANT: California Department of Transportation RECEIVING WATERS: Russian River & North Fork Navarro River HYDROLOGIC AREA: Mendocino Coast, Navarro River, Sub‐area 113.50 Mendocino Coast, Middle Russian River, Sub‐area 114.24 COUNTY: Mendocino FILE NAME: CDOT MEN‐128‐PM 30.14‐48.44 State Route 128/253 Culvert Rehabilitation Project (Phase III, Part 2) FINDINGS BY THE EXECUTIVE OFFICER: 1. On December 22, 2015, the North Coast Regional Water Quality Control Board (Regional Water Board) received an application from the California Department of Transportation (Caltrans), requesting Federal Clean Water Act, section 401, Water Quality Certification (certification) for activities related to the proposed Highway 128/253 Culvert Rehabilitation Project Phase III (Part 2), (Project). 1 WGS84 datum

Transcript of 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert...

Page 1: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

March25,2016

IntheMatterofWaterQualityCertification

forthe

StateRoute128/253CulvertRehabilitationProject(PhaseIII,Part2)

38.991,‐123.3538to38.875,‐123.10581WDIDNo.1B15162WNME,ECMPINCW‐820346CaltransEANo.01‐37813,EFISNo.01‐0000‐0134

APPLICANT: CaliforniaDepartmentofTransportation

RECEIVINGWATERS: RussianRiver&NorthForkNavarroRiver

HYDROLOGICAREA: MendocinoCoast,NavarroRiver,Sub‐area113.50MendocinoCoast,MiddleRussianRiver,Sub‐area114.24

COUNTY: Mendocino

FILENAME: CDOTMEN‐128‐PM30.14‐48.44StateRoute128/253CulvertRehabilitationProject(PhaseIII,Part2)

FINDINGSBYTHEEXECUTIVEOFFICER:1. OnDecember22,2015,theNorthCoastRegionalWaterQualityControlBoard

(RegionalWaterBoard)receivedanapplicationfromtheCaliforniaDepartmentofTransportation(Caltrans),requestingFederalCleanWaterAct,section401,WaterQualityCertification(certification)foractivitiesrelatedtotheproposedHighway128/253CulvertRehabilitationProjectPhaseIII(Part2),(Project).

1 WGS84 datum

Page 2: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐2‐ March25,2016WDIDNo.1B15162WNME

2. PublicNotice:TheRegionalWaterBoardprovidedpublicnoticeoftheapplicationpursuanttotitle23,CaliforniaCodeofRegulations,section3858onFebruary9,2016,andpostedinformationdescribingtheProjectontheRegionalWaterBoard’swebsite.Nocommentswerereceived.

3. ReceivingWaters:TheproposedProjectwillcausedisturbancestotributariesofthe

RussianRiverandNavarroRiver.(MiddleRussianRiver,Sub‐Area114.24andNavarroRiver,Sub‐Area113.50).

4. ProjectDescription:ThepurposeoftheProjectistorehabilitate22deteriorated

culvertsthatCaltranshasdeterminedtohavereachedlifeexpectancy,thuspreventinghighwaydamagefrompotentialculvertfailure.TheProjectareaisonRoute128(MEN128)betweenPostMiles(PM)30.14and48.44inMendocinoCounty.

WorkwillbeconductedondrainagesystemsatthefollowingSR128Post‐Miles:

30.14 30.57 31.03 31.09 31.26 35.42 35.4835.94 38.77 40.52 40.75 41.12 41.35 42.8143.16 44.85 46.66 47.52 47.71 47.97 48.348.44

DS–1PM30.14Theexistingupstream18”x21.1’corrugatedmetalpipe(CMP)downdrainandconcreteheadwall,concretedrainageinlet,and18”x40.2’CMPculvertwillberemovedandreplacedbytrenchcutandcoverwithanew24”concreteheadwall,24”x21.1’alternativepipedowndrain,concreteopen‐gratedinletwithhotmixasphalt(HMA)apronanddike,and24”x49.7’alternativepipeculvert(APC)witha24”concreteheadwallattheoutlet.Importedrockymaterialwillbeusedtorecontourtheslopeabovetheoutlet.DS–2PM30.57Theexisting18”x48.5’CMPculvertwillberemovedbytrenchcutandcover,alongwiththeexistinginletheadwall,andreplacedwitha24”x55.1’APCandstraight24”concreteheadwallsatboththeinletandoutlet.Importedrockymaterialwillbeusedtorecontourtheslopeaboveboththeinletandoutlet,andminorconcretebackfillwillbeplacedatop30’ofthemiddleoftheculvertlength.DS–3PM31.03Theexisting18”x55.2’CMPculvertand18”x29.5’CMPdowndrainwillbereplacedwitha24”x55.3’APCbytrenchcutandcover,alongwithanew24x30.2’APdowndrainandanchorassembly.Approximately44cubicyardsofrockslopeprotection(RSP)willbeinstalledattheoutlet.

Page 3: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐3‐ March25,2016WDIDNo.1B15162WNME

DS–4PM31.09Theexisting15”x54.0’CMPculvertandconcreteinletheadwallwillbereplacedwitha24”x54.0’APCbytrenchcutandcover.Anewstraight24”concreteheadwallwillbeinstalledattheinlet,andimportedrockymaterialwillbeusedtorecontourtheslopeabovetheculvertinlet.DS–5PM31.26Twoendpieces(7.5’‐and3.5’‐longsections)oftheexisting18”x86’CMPculvertwillberemovedandtheremaining72.5’sectionabandonedinplace.Anew24”x65.1’APCand24”concretestraightinletheadwallwillbeinstalledabovetheabandonedculvertbytrenchcutandcover,alongwitha24”x20.3’alternativepipeoutletdowndrain.Importedrockymaterialwillbeusedtobackfilltheoldinletarea,aswellastorecontourtheslopeabovethenewAPCculvertinlet.Approximately6.2cubicyardsofRSPwillbeinstalledatthedowndrainoutlet.DS–6PM35.42Theexisting18”x40’CMPandinletstructurewillberemovedbytrenchcutandcoverandreplacedwitha24”x45.4’APCandanopen‐gratedconcretedraininginlet.Anexistinggabionbasketwallwillbeprotectedinplaceattheinlet,andanHMAapronanddikewillbeinstalledattheinletandminorconcretebackfillwillbeplacedabovetheculvertattheinletside.DS–7PM35.48Theexisting18”x37.3’CMPculvertandconcreteinletstructurewillbereplacedwitha24”x44’APCbytrenchcutandcover,andanewconcretedouble‐open‐grateddrainageinletwillbeinstalledalongwithaHMAapronanddike.Importedrockymaterialwillbeusedtorecontourtheslopeabovetheoutlet.DS–8PM35.94Theexisting18”x40.7’CMPandinletstructurewillberemovedandthereplacedwitha24”x51.1’APCbytrenchcutandcover,alongwithanewsteelopenmetalpipe(OMP)drainageinletandmetalflared‐endsectionattheoutlet.Importedrockymaterialwillbeusedtorecontourtheslopeabovetheoutlet.DS–9PM38.77Theexisting18”x35.4’CMPwillbereplacedwithanew24’x38.6’APCusingtrenchcutandcover,alongwithaconcreteopen‐grateddrainageinletandHMAapronanddike.Existingconcretescourprotectionwillbereplacedbyconcrete‐and‐RSPattheinletchannel.Minorconcretebackfillwillbeplacedatopthecenterportionofthenewculvert,andimportedrockymaterialwillbeusedtorecontourtheslopeabovetheoutlet.

Page 4: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐4‐ March25,2016WDIDNo.1B15162WNME

DS–10PM40.52Usingtrenchcutandcover,theexisting18”x41.0’CMPculvertwillbereplacedwitha24”x46.0’APC,andtheexitinginletheadwallwithanew24”concretestraightheadwall.Importedrockymaterialwillbeusedtorecontourtheslopesatboththeinletandoutlet.DS–11PM40.75Theexisting18”x39.0’CMPculvertandinletheadwallwillberemovedandreplacedwitha24”x39.8’APCandnew24”concretestraightinletheadwall.About13feetofconcretebackfillwillbeinstalledfromtheinletsideoftheculvert,andimportedrockymaterialwillbeusedtorecontourtheslopesaboveboththeinletandoutletends.Anexisting4”fiberopticcable,encasedin6inchesofconcrete,runsbelowtheculvertalignment.DS–12PM41.12Theexisting18”x40.6’CMPculvertwillbereplacedwitha24”x45.5’APCbytrenchcutandcover,andtheexistingconcreteheadwallwillberemovedandanew24”concretestraightinletheadwallinstalled.Approximately12cubicyardsofRSPwillbeplacedintheroadsidedrainageditchleadingtotheculvertinlet,andimportedrockymaterialwillbeusedtocontourtheslopeabovetheinlet.Anexisting4”fiberopticcable,encasedin6inchesofconcrete,runsbelowtheculvertalignment.DS–13PM41.35Theexisting18”x41.6’CMPculvertwillbereplacedwitha24”x47.8’APCbytrenchcutandcover,andtheexistinginletconcreteheadwallremoved.Anew24”concretestraightheadwallwillbeinstalled,andimportedrockymaterialwillbeusedtorecontourtheslopeabovetheinlet.Approximately6cubicyardsofRSPwillbeplacedattheoutlet.DS–14PM42.81Anew24”x76.5’APCwillbeinstalledwherethepreviouspipewaslostduringconstructionofadriveway.Importedrockymaterialwillbeusedtorecontourtheslopeattheoutletside.DS–15PM43.16Theexisting18”x58.4’CMPandheadwallwillbereplacedwitha24”x59.6’APCusingtrenchcutandcoverconstruction,andanewstraight24”concreteheadwallinstalledattheinlet.About27’ofconcretebackfillwillbeplacedatoptheculvertfromtheinletside,andimportedrockymaterialwillbeusedtorecontourtheslopeabovetheboththeinletoutlet.Additionally,anexisting4”fiberopticcableencasedin6inchesofconcretebelowtheculvertalignmentwillbeprotectedinplace.

Page 5: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐5‐ March25,2016WDIDNo.1B15162WNME

DS–16PM44.85Theexisting18”x32.9’CMPculvertwillberemovedusingtrenchcutandcoverandreplacedwitha24”x34.2’APC.Adrainageinletwillbeinstalled,aswellasa2”x39.0’plasticsupplypipehousedwithina6”x38.0’CMP.Approximately13’ofminorconcretebackfillwillbeinstalledabovetheculvertfromtheinletside,and4.5cubicyardsofRSPinstalledattheoutlet.Additionally,a4”fiberopticcablehousedwithin6”ofconcretewillbeprotectedinplace.DS–17PM46.66Theexisting18”x45.8’CMPculvertand12”x18.9’downdrainwillbereplacedwitha24”x46.0’APCand24”x24.4’APdowndrainbytrenchcutandcover.AnHMAdikeandpavedgutterflarewillbeplacedtodirectsurfaceandroadsidedrainageflowsintoanew12”x24.7’downdrainassembly.Approximately15’ofminorconcretebackfillwillbeplacedatoptheculvertfrominletside,andimportedrockymaterialusedtorecontourtheslopeontheoutletside.6.2cubicyardsofRSPwillbeinstalledattheconfluenceoftheculvertanddowndrainoutlets.Anexisting4”fiberopticcableencasedin6”ofconcretewillbeprotectedinplace.DS–18PM47.52Theexisting18”x51.9’CMPculvertwillberemovedviatrenchcutandcover,alongwiththeexitinginletconcreteheadwall,andreplacedwitha24”x58.1’APCandnewstraight24”concreteinletheadwall.Importedrockymaterialwillbeusedtorecontourtheslopeattheoutlet,and6.2cubicyardsofRSPwillbeinstalledattheculvertoutlet.Anexisting4”fiberopticcable,encasedin6”ofconcrete,runsbeneaththeculvertalignment.DS–19PM47.71Theexisting18”x57.6’CMPculvertwillberemovedbytrenchcutandcoverandreplacedwithanew24”x62.2’APCandstraight24”concreteheadwall.Approximately17’ofminorconcretebackfillwillbeplacedatoptheculvertfromtheinletside,andimportedrockymaterialwillbeusedtorecontourtheslopeattheoutlet.Approximately6.2cubicyardsofRSPwillbeinstalledattheculvertoutlet.Anexisting4”fiberopticcableencasedin6”ofconcretewillbeprotectedinplace.DS–20PM47.97Theexisting18”x40.4’CMPculvertwillbereplacedbytrenchcutandcoverwitha24”x42.8’APC.Asloped24”concreteheadwallwillbeinstalledattheoutletendoftheculvert,andapproximately12’ofminorconcretebackfillwillbeplacedatoptheculvertfromtheinletside.DS–21PM48.30Theexisting18”x40.2’CMPwillbereplacedusingtrenchcutandcoverwitha24”x44.8’APC.Importedrockymaterialwillbeusedtorecontourtheslopeabovethe

Page 6: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐6‐ March25,2016WDIDNo.1B15162WNME

outlet,andapproximately12’ofminorconcretebackfillwillbeplacedatoptheculvertfromtheinletside.DS–22PM48.44Theexisting18”x50.7’CMPwillbereplacedusingtrenchcutandcoverwithanew24”x52.6’APC.Asteelpipedrainageinletwillalsobeinstalled,andimportedrockymaterialwillbeusedtorecontourtheslopeabovetheoutlet.Anexisting4”fiberopticcable,encasedin6”ofconcrete,runsbeneaththeculvertalignment.

5. ConstructionTiming:TheProjectisexpectedtobecompletedwithinapproximately66workingdays.TheProjectisproposedtobeginonJuly1,2016,andbecompletedonSeptember1,2016.

6. ProjectImpacts:TheproposedProjectwillresultinapproximately412.8linearfeet

(0.012acres)ofpermanentimpactstojurisdictionalwatersduetodisturbanceduringconstruction.TheproposedProjectwillresultinapproximately1,359.9linearfeet(0.04acres)oftemporaryimpactstojurisdictionalwatersduetothenewdrainagesystembeinginstalled.TheProjectwillalsoresultinapproximately0.001acresofpermanentimpactsand0.003acresoftemporaryimpactstowetlandsduetodisturbanceduringconstruction.

7. MitigationforProjectImpacts:Caltransshallmitigateforpermanentimpactsby

providing0.36acresofrestoredwetlandsand0.17acresofrestoredwatersofthestateatMacKerricherStatePark,immediatelynorthofFortBragg.MitigationshallbecompletedconsistentwiththeApril2013,InglenookFen‐TenMileDuneNaturalPreserveMitigationandMonitoringPlan,preparedbyCaltrans.

8. Post‐ConstructionStormWater:Post‐constructionstormwatertreatmentisnot

requiredbecauseProjectimplementationwillresultinlessthan5,000squarefeetofaddedorreworkedimperviousarea.

9. DisturbedSoilArea:Projectimplementationwillresultinlessthanoneacreofdisturbedsoilarea.Caltransshallutilizeappropriateerosioncontrol,sedimentcontrol,andsitemanagementBestManagementPracticestopreventdischargeofpollutantsduringconstruction.

10. UtilityRelocations:Utilityrelocationsaffectingjurisdictionalwatersarenotproposed

forthisProject.

11. OtherAgencyActions:CaltranshasrequestedU.S.ArmyCorpsofEngineersauthorizationtoperformtheprojectunderRegionalGeneralPermitno.2009‐00447N,pursuanttoCWA,section404.Caltranshasalsosubmittedasection1600NotificationofLakeorStreambedAlterationtotheCaliforniaDepartmentofFishandWildlife.CaltransreceivedaBiologicalOpinion(AFWO‐10B0003‐10F0090)fromtheNational

Page 7: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐7‐ March25,2016WDIDNo.1B15162WNME

MarineFisheriesService(NMFS)onJanuary4,2005,thatdeterminedtheProjectisnotlikelytoadverselyaffectlistedsalmonidspecies.CaltransreinitiatedconsultationwithNMFSin2006afterachangeinthelistingstatusofCentralCaliforniaCoastcohosalmonaswellasdesignationofcriticalhabitatforNorthernCaliforniasteelheadandCentralCaliforniaCoaststeelhead.InaJanuary10,2007letter,NMFSmaintainedthattheoriginalBiologicalOpinionandincidentaltakestatementremainedvalid.

12. CEQACompliance:OnJune6,2005,CaltranssignedaNoticeofDeterminationapprovingaMitigatedNegativeDeclarationfortheProject(StateClearinghouseNo.2015021063)inordertocomplywiththeCaliforniaEnvironmentalQualityAct.

13. TotalMaximumDailyLoad:TheNavarroRiverisidentifiedasimpairedforsediment

andtemperatureundertheCleanWaterActSection303(d)list.Erosionisidentifiedasacontributingsourcetosedimentimpairment.Caltranswillutilizeappropriateerosioncontrol,sedimentcontrol,andsitemanagementBMPstocontrolpollutantsduringconstruction,anddrainageimprovementswillresultinanetreductioninsedimentcontributions.Accordingly,thiscertificationdoesnotcertifyanyactivitiesthatwouldcontributetoEelRiversedimentortemperatureimpairment.

14. AntidegradationPolicy:ThefederalantidegradationpolicyrequiresthatStatewater

qualitystandardsincludeanantidegradationpolicyconsistentwiththefederalpolicy.TheStateWaterBoardestablishedCalifornia’santidegradationpolicyinStateWaterBoardResolutionNo.68‐16.ResolutionNo.68‐16incorporatesthefederalantidegradationpolicywherethefederalpolicyappliesunderfederallaw.ResolutionNo.68‐16requiresthatexistingqualityofwatersbemaintainedunlessdegradationisjustifiedbasedonspecificfindings.TheRegionalWaterBoard’sBasinPlanimplements,andincorporatesbyreference,boththeStateandfederalantidegradationpolicies.ThiscertificationisconsistentwithapplicablefederalandStateantidegradationpolicies,asitdoesnotauthorizethedischargeofincreasedconcentrationsofpollutantsorincreasedvolumesoftreatedwastewater,anddoesnototherwiseauthorizedegradationofthewatersaffectedbythisProject.

15. ThisdischargeisalsoregulatedunderStateWaterResourcesControlBoardOrderNo.

2003‐0017‐DWQ,"GeneralWasteDischargeRequirementsforDredgeandFillDischargesThatHaveReceivedStateWaterQualityCertification,"whichrequirescompliancewithallconditionsofthiscertification.OrderNo.2003‐0017‐DWQcanbefoundhere:http://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2003/wqo/wqo2003‐0017.pdf.

Page 8: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐8‐ March25,2016WDIDNo.1B15162WNME

Accordingly,basedonitsindependentreviewoftherecord,theRegionalWaterBoardcertifiesthattheStateRoute128/253CulvertRehabilitationProject(PhaseIII,Part2)(WDIDNo.1B15162WNME),asdescribedintheapplicationwillcomplywithsections301,302,303,306and307oftheCleanWaterAct,andwithapplicableprovisionsofstatelaw,providedthatCaltranscomplieswiththefollowingtermsandconditions:AllconditionsofthiscertificationapplytoCaltrans(andtheiremployees)andallcontractors(andtheiremployees),sub‐contractors(andtheiremployees),andanyotherentityoragencythatperformsactivitiesorworkontheProjectasrelatedtothisWaterQualityCertification.Project‐SpecificConditions

1. Caltransshallrestore0.36acresofwetlandsand0.17acresofwatersofthestateattheInglenookFen–TenMileDunesPreserveaspartoftheCaliforniaStateParksMacKerricherStateParkDuneRehabilitationProject,asseenintheMitigationandMonitoringPlan,datedApril13.

Project‐SpecificConditionsRequiringReports

2. TheRegionalWaterBoardshallbenotifiedinwriting(e‐mailisacceptable)atleastfiveworkingdayspriortocommencementofgrounddisturbingactivitiesforeachconstructionseason.

3. CaltransshallimplementtheproposedStateRoute128/253CulvertRehabilitationProject(PhaseIII,Part2)RevegetationPlan,datedDecember2015(Plan).Caltransshallsubmityears1,2,3,4,and5monitoringreports,nolaterthanJanuary31followingtherespectivemonitoringyear.Themonitoringreportsshallincludephotos,plantcounts,andsuccesscriteriaforsurvivalcounts.

StandardConditions(continued)

4. HerbicidesandotherpesticidesshallnotbeusedwithintheProjectlimits.IfCaltranshasacompellingcaseastowhypesticidesshouldbeused,thenarequestforpesticideuseandaBMPplanmaybesubmittedtotheRegionalWaterBoardstaffforreviewandacceptance.

ReceivingWater: RussianRiver&NorthForkNavarroRiver

Filledand/orExcavatedAreas: Permanent–jurisdictionalwaters

Temporary–jurisdictionalwaters

412.8linearfeet(0.012acres)

1,359.9linearfeet(0.04acres)

Latitude/Longitude: 38.991,‐123.3538to38.875,‐123.1058

CertificationExpiration: March25,2021

Page 9: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐9‐ March25,2016WDIDNo.1B15162WNME

StandardConditions(continued)

5. AllProjectactivitiesandBMPsshallbeimplementedaccordingtothesubmittedapplicationpackageandthefindingsandconditionsofthiscertification.SubsequentchangestotheProjectthatcouldsignificantlyimpactwaterqualityshallfirstbesubmittedtoRegionalWaterBoardstaffforpriorreview,consideration,andwrittenconcurrence.IftheRegionalWaterBoardisnotnotifiedofanalterationtotheProjectthatresultsinanimpacttowaterquality,itwillbeconsideredaviolationofthiscertification,andCaltransmaybesubjecttoRegionalWaterBoardenforcementactions.

6. AllconditionsrequiredbythiscertificationshallbeincludedintheContractDocumentspreparedbyCaltransforthecontractor.Inaddition,CaltransshallrequirecompliancewithallconditionsincludedinthiscertificationinthebidcontractforthisProject.

7. CaltransisprohibitedfromdischargingwastetowatersoftheState,unlessexplicitly

authorizedbythiscertification.Forexample,nodebris,soil,silt,sand,bark,slash,sawdust,rubbish,cementorconcreteorconcretewashings,weldingslag,oilorpetroleumproducts,orotherorganicorearthenmaterialfromanyconstructionorassociatedactivityofwhatevernature,shallbeallowedtoenterintoStatewaters.

8. Exceptfortemporarystockpilingofwastegeneratedduringdemolitionoperations

(“temporary”inthisinstancemeansgeneratedandremovedduringthesameworkingday),wastematerialsshallnotbeplacedinamannerwherethematerialsmaybetransportedintowatersoftheState.Wastematerialsshallnotbeplacedwithin100linearfeetofStatewaters.Exceptionstothe100‐footlimitmaybegrantedonacase‐by‐casebasisprovidedCaltransfirstsubmitsaproposalinwritingthatisfoundacceptablebyRegionalWaterBoardstaff.

9. Caltransisliableandresponsiblefortheproperdisposal,reuse,and/orrecyclingofallProject‐generatedwasteincompliancewithapplicableStateandFederallawsandregulations,andasdescribedinCaltrans2010StandardSpecifications13‐4.03D,WasteManagement.Additionally,whenhandling,transporting,disposing,reusing,and/orrecyclingProject‐generatedwaste,Caltransandtheircontractorsshall:

i) ProvidetheRegionalWaterBoardwithacopyoftheSolidWasteDisposalandRecyclingReportpreparedforCaltransbythecontractorperCaltrans2010StandardSpecification14‐10.02A(1),Submittals.ThesereportsshallbeprovidednotlaterthanJanuary31foreachyearworkisperformedduringthepreviouscalendaryear.AcopyofthefinalSolidWasteDisposalandRecyclingReportshallbesubmittedtotheRegionalWaterBoardwithin30daysafterbeingreceivedbyCaltransfromthecontractor.

ii) Forwasteotherthansolidwaste,obtainevidencethatwastehasbeenappropriatelydisposed,reused,and/orrecycled.Evidenceshallinclude

Page 10: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐10‐ March25,2016WDIDNo.1B15162WNME

StandardConditions(continued)

typeandquantityofwasteandmayinclude,butnotbelimitedto,propertyowneragreements,permits,licenses,andenvironmentalclearances.EvidenceshallbeprovidedtotheRegionalWaterBoarduponrequest;and

iii) Forwasteotherthansolidwaste,ensuretheResidentEngineerhasgivenwrittenpermissionfordisposal,reuse,and/orrecycling,priortotheactualdisposal,reuse,and/orrecycling.

10. Asphalt‐concretegrindingsshallnotbeplacedinanylocationwheretheymay,atany

time,bedirectlyexposedtosurfacewatersorseasonallyhighgroundwater,exceptasphalt‐concretegrindingsmaybere‐usedandincorporatedintohotmixasphaltproductsorencapsulatedwithintheroadwaystructuralsection.

11. CaltransandtheircontractorsshallcomplywiththeactivityrestrictionsdetailedinCaltrans2010StandardSpecifications13‐4.03C(1).Inaddition,fueling,maintenance,storageandstagingofvehiclesandequipmentshallbeprohibitedwithinwatersoftheState(e.g.,gravelbars,seeps,ephemeralstreams)andriparianareas.

12. Fueling,maintenance,and/orstagingofindividualequipmenttypeswithinwatersof

theStateorriparianareasmaybeauthorizedifCaltransfirstpreparesaplanforreviewandapprovalbyRegionalWaterBoardstaffthat:

i) Identifiesthespecificpieceofmachinerythatmayrequirefueling,maintenance,and/orstagingwithinwatersoftheStateorriparianareas;

ii) Providesjustificationfortheneedtorefuel,maintain,orstagewithinStatewatersorriparianareas.Thejustificationshalldescribewhyconductingtheactivityoutsideofjurisdictionalwatersisinfeasible;and

iii) IncludesanarrativeofspecificBMPsthatshallbeemployedtopreventdischargestoStatewatersandriparianareas;

13. CaltransshallnotuseleakingvehiclesorequipmentwithinStatewatersorriparian

areas.14. Only100‐percentbiodegradableerosionandsedimentcontrolproductsthatwillnot

entraporharmwildlifeshallbeused.Photodegradablesyntheticproductsarenotconsideredbiodegradable.IfCaltransfindsthaterosioncontrolnettingorproductshaveentrappedorharmedwildlife,personnelshallremovethenettingorproductandreplaceitwithwildlife‐friendlybiodegradableproducts.Thisconditiondoesnotprohibittheuseofplasticsheetingusedinwaterdiversionordewateringactivities.CaltransshallrequestapprovalfromtheRegionalWaterBoardifanexceptiontothisrequirementisneededforaspecificlocation.

Page 11: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐11‐ March25,2016WDIDNo.1B15162WNME

StandardConditions(continued)

15. Workinflowingorstandingsurfacewaters,unlessotherwiseproposedintheproject

descriptionandapprovedbytheRegionalWaterBoard,isprohibited.

16. Non‐stormwaterdischargesareprohibitedunlessthedischargeisfirstapprovedbytheRegionalWaterBoardandincompliancewiththeBasinPlan.Ifdewateringofgroundwaterisnecessary,thenCaltransshalluseamethodofwaterdisposalotherthandisposaltogroundorsurfacewaters,suchaslanddisposal.GroundwaterdisposedoftolandshallnotenterStatewaters.Alternatively,CaltransmayapplyforcoverageundertheLowThreatDischargePermitoranindividualNationalPollutantDischargeEliminationSystem(NPDES)Permit.IfCaltransappliesforcoverageundereitherofthesepermits,thendischargeisprohibiteduntilCaltranshasreceivednotificationofcoverageundertherespectivepermit.

17. GravelbagsusedwithinStatewatersshall:

i) ComplywithCaltrans2010StandardSpecificationssections13‐5.02Gand88‐1.02F;

ii) Beimmediatelyremovedandreplacedifthebagshavedevelopedoraredevelopingholesortears;and

iii) Befilledonlywithcleanwashedgravel.

ExceptionstothesecriteriaaresubjecttothereviewandacceptanceofRegionalWaterBoardstaff.

18. Thiscertificationdoesnotauthorizedraftingofsurfacewaters.

19. CaltransshallprovideaccesstotheProjectconstructionsiteuponrequestbyRegional

WaterBoardstaff.

20. InitialwaterpollutioncontroltrainingdescribedinCaltrans2010StandardSpecifications13‐1.01D(2),Training,shallapplytoallCaltransemployees,contractors,andsub‐contractors.InitialwaterpollutioncontroltrainingtopicsshallincludeRegionalWaterBoard401certificationandconstructiongeneralpermitrequirements,identificationofstatewatersandriparianareas,andviolationavoidanceanddischargereportingprocedures.

21. CaltransshallmaintainlogsofallCaltransstaff,contractors,andsub‐contractorstrainedpursuanttotheCaltrans2010StandardSpecifications13‐1.01D(2).Thelogsshallincludethenamesoftrainees,trainingdates,andsummaryofthescopeoftraining.CaltransshallprovideevidenceofthisdocumentationupontherequestoftheRegionalWaterBoard.

Page 12: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐12‐ March25,2016WDIDNo.1B15162WNME

StandardConditions(continued)

22. Ifanunauthorizeddischargetosurfacewaters(includingwetlands,riversorstreams)occurs,oranyotherthreattowaterqualityarisesasaresultofProjectimplementation,theassociatedProjectactivitiesshallceaseimmediatelyuntilthethreattowaterqualityisotherwiseabated.IfthereisadischargetoStatewaters,theRegionalWaterBoardshallbenotifiednomorethan24hoursafterthedischargeoccurs.

23. UncuredconcreteshallnotbeexposedtoStatewatersorsurfacewatersthatmaydischargetoStatewaters.Concretesealantsmaybeappliedtotheconcretesurfacewheredifficultyinexcludingflowforalongperiodmayoccur.Ifconcretesealantisused,watershallbeexcludedfromthesiteuntilthesealantiscured.Ifgroundwatercomesintocontactwithfreshconcrete,itshallbepreventedfromflowingtowardssurfacewater.

24. Groundandsurfacewaterthathascomeintocontactwithfreshconcrete,andallother

wastewater,shallnotbedischargedtoStatewatersortoalocationwhereitmaydischargetoStatewaters;thewastewatershallbecollectedandre‐usedordisposedofinamannerapprovedbytheRegionalWaterBoard.

25. Allimportedfillmaterialshallbecleanandfreeofpollutants.Allfillmaterialshallbe

importedfromasourcethathastheappropriateenvironmentalclearancesandpermits.Thereuseoflow‐levelcontaminatedsolidsasfillon‐siteshallbeperformedinaccordancewithallStateandFederalpoliciesandestablishedguidelinesandmustbesubmittedtotheRegionalWaterBoardforreviewandconsiderationofacceptance.

26. CaltransshallprovideacopyofthiscertificationandStateWaterResourcesControlBoard(SWRCB)OrderNo.2003‐0017‐DWQ(weblinkreferencedbelow)tothecontractorandallsubcontractorsconductingthework,andrequirethatcopiesremainintheirpossessionattheworksite.Caltransshallberesponsibleforworkconductedbyitscontractorandsubcontractors.

27. Thevalidityofthiscertificationisconditionedupontotalpaymentofanyfeerequired

undertitle23,CaliforniaCodeofRegulations,section3833.Thetotalapplicationfeeis$10,794.TheRegionalWaterBoardreceived$10,794fromCaltransonDecember2,2015.

28. Thiscertificationwillbesubjecttoannualbillingduringtheconstructionphase(“AnnualActiveDischargeFee”)andduringthemonitoringphaseoftheProject(“AnnualPostDischargeMonitoringFee”),perthecurrentfeeschedule,whichcanbefoundonourwebsite:http://www.swrcb.ca.gov/northcoast/water_issues/programs/water_quality_certification.shtml.ThesefeeswillbeautomaticallyinvoicedtoCaltrans.

29. CaltransshallnotifytheRegionalWaterBoarduponProjectconstructioncompletionto

Page 13: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐13‐ March25,2016WDIDNo.1B15162WNME

StandardConditions(continued)

requestterminationoftheAnnualActiveDischargeFeeandtoreceivea“NoticeofCompletionofDischargesLetter.”IftheProjectissubjecttotheAnnualPostDischargeMonitoringFee,thenCaltransshallalsonotifytheRegionalWaterBoardattheendofthemonitoringperiodtorequestterminationofthefeeandreceivea“NoticeofProjectCompleteLetter.”Caltransmayberequiredtosubmitcompletionreportsattheendofeachofthesephases.RegionalWaterBoardstaffmayrequestsitevisitsattheendofeachProjectphasetoconfirmProjectstatusandcompliancewiththiscertification.

30. ThiscertificationactionisnotintendedandshallnotbeconstruedtoapplytoanydischargefromanyactivityinvolvingahydroelectricfacilityrequiringaFederalEnergyRegulatoryCommission(FERC)licenseoranamendmenttoaFERClicenseunlessthepertinentcertificationapplicationwasfiledpursuanttotitle23,CaliforniaCodeofRegulations,section3855,subdivision(b)andtheapplicationspecificallyidentifiedthataFERClicenseoramendmenttoaFERClicenseforahydroelectricfacilitywasbeingsought.

31. Intheeventofanyviolationorthreatenedviolationoftheconditionsofthiscertification,theviolationorthreatenedviolationshallbesubjecttoanyremedies,penalties,processorsanctionsasprovidedforunderapplicablestateorfederallaw.Forthepurposesofsection401(d)oftheCleanWaterAct,theapplicabilityofanystatelawauthorizingremedies,penalties,processorsanctionsfortheviolationorthreatenedviolationconstitutesalimitationnecessarytoassurecompliancewiththewaterqualitystandardsandotherpertinentrequirementsincorporatedintothiscertification.Inresponsetoasuspectedviolationofanyconditionofthiscertification,theStateWaterBoardmayrequiretheholderofanyfederalpermitorlicensesubjecttothiscertificationtofurnish,underpenaltyofperjury,anytechnicalormonitoringreportstheStateWaterBoarddeemsappropriate,providedthattheburden,includingcosts,ofthereportsshallbearareasonablerelationshiptotheneedforthereportsandthebenefitstobeobtainedfromthereports.Inresponsetoanyviolationoftheconditionsofthiscertification,theRegionalWaterBoardmayaddtoormodifytheconditionsofthiscertificationasappropriatetoensurecompliance.

32. Thiscertificationactionissubjecttomodificationorrevocationuponadministrativeorjudicialreview;includingreviewandamendmentpursuanttoWaterCodesection13330andtitle23,CaliforniaCodeofRegulations,section3867.

33. IntheeventofanychangeincontrolofownershipoflandpresentlyownedorcontrolledbyCaltrans,Caltransshallnotifythesuccessor‐in‐interestoftheexistenceofthiscertificationbyletterandshallforwardacopyofthelettertothefollowingemailaddress:[email protected]‐in‐interestshalle‐mailtheRegionalWaterBoardExecutiveOfficerat:NorthCoast@waterboards.ca.govtorequestauthorizationtodischargedredgedorfill

Page 14: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐14‐ March25,2016WDIDNo.1B15162WNME

StandardConditions(continued)

materialunderthiscertification.Therequestmustcontainthefollowing:

i) Effectivedateofownershipchange;

ii) Requestingentity’sfulllegalname;

iii) Thestateofincorporation,ifacorporation;

iv) Theaddressandphonenumberofcontactperson;and

v) Adescriptionofanychangestotheprojectorconfirmationthatthesuccessor‐in‐interestintendstoimplementtheprojectasdescribedinthiscertification.

34. Exceptasmaybemodifiedbyanyprecedingconditions,allcertificationactionsare

contingenton:

i) ThedischargebeinglimitedtoandallproposedmitigationbeingcompletedinstrictcompliancewithCaltrans’sProjectdescriptionandCEQAdocumentation,asapprovedherein;and

vi) CompliancewithallapplicablewaterqualityrequirementsandwaterqualitycontrolplansincludingtherequirementsoftheWaterQualityControlPlanfortheNorthCoastRegion(BasinPlan),andamendmentsthereto.

35. AnychangeinthedesignorimplementationoftheProjectthatwouldhaveasignificantormaterialeffectonthefindings,conclusions,orconditionsofthiscertificationmustbesubmittedtotheExecutiveOfficeroftheRegionalWaterBoardforpriorreview,consideration,andwrittenconcurrence.IftheRegionalWaterBoardisnotnotifiedofasignificantalterationtotheproject,itwillbeconsideredaviolationofthiscertification,andCaltransmaybesubjecttoRegionalWaterBoardenforcementactions.

36. TheauthorizationofthiscertificationforanydredgeandfillactivitiesexpiresonMarch

25,2021.Conditionsandmonitoringrequirementsoutlinedinthiscertificationarenotsubjecttotheexpirationdateoutlinedabove,andremaininfulleffectandareenforceable.

Condition2and3arerequirementsforinformationandreports.AnyrequirementforareportmadeasaconditiontothiscertificationisaformalrequirementpursuanttoCaliforniaWaterCodesection13267,andfailureorrefusaltoprovide,orfalsificationofsuchrequiredreportissubjecttocivilliabilityasdescribedinCaliforniaWaterCode,Section13268.TheRegionalWaterBoardmayaddtoormodifytheconditionsofthiscertification,asappropriate,toimplementanyneworrevisedwaterqualitystandardsandimplementation

Page 15: 1 WGS84 datum - California State Water Resources Control Board · State Route 128/253 Culvert Rehabilitation Project ... , and minor concrete backfill ... A new 24” x 76.5’ APC

CDOTMENSR128/253Culvert ‐15‐ March25,2016WDIDNo.1B15162WNME

plansadoptedorapprovedpursuanttothePorter‐CologneWaterQualityControlActorsection303oftheCleanWaterAct.PleasecontactourstaffEnvironmentalScientist,BrandonStevensat(707)576‐2377,orviae‐mail,[email protected],ifyouhaveanyquestions._________________________________ MatthiasSt.John ExecutiveOfficer160325_BDS_dp_CDOT_MEN128&256_Culvert_401

Originalto: Mr.SebastianCohen,Caltrans,District1,1656UnionStreet,Eureka,CA

[email protected]: HollyCosta,[email protected] JoAnnLoehr,[email protected]

[email protected] EnvironmentalProtectionAgency,Region9R9‐WTR8‐[email protected] HilarySundeen,[email protected]