1. Well Control Basic Trainning
Transcript of 1. Well Control Basic Trainning
Schlumberger IPMSchlumberger IPM
IPM Well ControlIPM Well Control
Well Control Well Control Basic TrainingBasic Training
Table of ContentsTable of Contents
n Training Objectives.n Theory of Well Control.n Kick Causes. n Kick Prevention.n Kick Detection. n Shut-in Procedures.n Well Control Methods. n Well Control Equipment.
Training ObjectivesTraining ObjectivesThis presentation has been designed in order to cover the requirements of the Schlumberger segments related to basic knowledge in well control.
Well Control terms and concepts, equipment, procedures and correct managing of well control situations are here presented.
At the end of this presentation you should be able to:
n Describe the theory of well control. n Describe the concept of “U” tube and
its application in well control situations.n Explain the concepts of: kicks and
blow outs. n Describe the kick condition and
causes.n Describe primary well control and
practices to prevent a kick.
n Identify kick detection equipment. n Describe practices to prevent kicks. n Describe the procedures for shut-in
and divert a well. n Describe various methods of well
control and its applications. n Identify BOP equipment, other well
control equipment and diverters.