Virgo Commissioning Status
WG1 meeting Potsdam, 21st July 2006
![Page 2: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/2.jpg)
2
Full ITF re-lock
Locks not longer than a few minutes
Mid of March: 7 Watts entering the ITF
Recycling Cavity Power (1 day)
Recycling gain lower than expected
Recycling gain = 25
(instead of 45)
![Page 3: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/3.jpg)
3
Other problems observed
Clipping of the beam discovered at the level of the output telscope
Suspended detection bench
![Page 4: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/4.jpg)
4
Other problems observed
Reflected beam shape very bad
Matching of the beam with the cavities only 88%
Clipping of the beam discovered at the level of the output telscope
ITF locked
![Page 5: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/5.jpg)
5
Tring to fix problems
Centering of the beam on the mirrors
Improvement of the matching
Clipping disappeared
Matching improved (88%96%)
![Page 6: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/6.jpg)
6
Recycling gain from 25 to 40
1 month
Interferometer powers
280 W on the BS
10 times more power than C7 (25 W)
![Page 7: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/7.jpg)
7
Re-lock of the ITF End of May
Lock still not stable
Oscillations around 30-50 Hz
Present “everywhere”
Not clearly connected with any longitudinal loop oscillation
Quite often they caused the unlock of the ITF
![Page 8: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/8.jpg)
8
Locks long enough to see thermal effects
Sideband powersee Julien’s talk
![Page 9: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/9.jpg)
9
dramatic change of the locking parameters in the firts minutes of lock acquisition
quite challenging to keep the ITF locked
Locks long enough to see thermal effects
![Page 10: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/10.jpg)
10
Coupling with alignment fluctuations
0.4 rad
![Page 11: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/11.jpg)
11
locking parameters very sensitive to alignment fluctuations (Locking/Alignment shifts)
small window in which the locking parameters make the ITF more stable
Coupling with alignment fluctuations
![Page 12: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/12.jpg)
12
Useful tools On-line monitor: ugf of the longitudinal loops
P\Q of the error signals
Automatic gain adjustment (Differential ARM loop)
![Page 13: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/13.jpg)
13
Useful tools
Scanning Fabry-Perot on the dark fringe beam
Sidebands always unbalanced, instabilities clearly correlated with one sideband vanishing
![Page 14: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/14.jpg)
14
Easier to identify possible sources of instabilities
Help in tuning locking parameters
Improvements
![Page 15: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/15.jpg)
15
Results
1- Lock acquisition reliable
W
![Page 16: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/16.jpg)
16
Once the lock was stable enough..
further improvement of the locking stability
ITF conditions more repeatable * new alignment procedure tested and implemented
relaxed constraints on the locking parameters
… it was possible to close the automatic alignment:
![Page 17: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/17.jpg)
17
Results
2- Typical locking periods of hours
Automatic alignment ON: 10 loops closed
![Page 18: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/18.jpg)
18
Results
3- Start of low noise operations as in C7
Dark fringe controlled with B1 (OMC on resonance)
Re-allocation to the marionette + low noise coil drivers
More aggressive filters in the longitudinal loops
![Page 19: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/19.jpg)
19
Sensitivity
BS length control noise
PR length control noise (direct coupling)
Arm mirror actuator noise
BS actuator noise
B1 shot noise
B1 electronic noise
Oscillator phase noise
Laser frequency noise ?
19
Presented by Romain at the last
collaboration meeting
Yes!
Noise Budget
Sensitivity
B5_ACp (freq. servo error signal)
![Page 20: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/20.jpg)
20
PRCL sensing noise reduction
Further noise reduction by
switching on B2
Current sensitivity
B2_3f readout noise (4 mW)
B2_3f readout noise with 100 mW
Increasing of the light impinging the photodiode (just done)
Expectations, no direct measurement yet
![Page 21: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/21.jpg)
21
Noise Reduction: near future
Length control noise: Improvement of MICH-PRCL longitudinal loop decoupling
Optimization of the automatic alignment loops (see Maddalena’s talk)
Frequency noise reduction
![Page 22: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/22.jpg)
22
Noise Reduction: already planned actions
Vibration isolation of external detection bench DONE
Actuators noise: plans for new coil drivers
Acoustic noise: plans ready for installation of acoustic enclosure in the laser
Diffused light mitigation: optimization of the benches optical set-up started, need few iterations
![Page 23: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/23.jpg)
23
Conclusions
It seems that we can survive to the thermal effects, but studies are in progress
Short term plans: complete automatic alignment, increase locking robustness (difficult to recover a stable lock after changes in the system, see last week)
Noise hunting just started
![Page 24: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/24.jpg)
24
Matching and beam centering
Spherical telescope
Parabolic telescope
Iterative procedure:
Beam-mirror centering
Astigmatism removal
Beam centering (clipping removal) and matching imply to act on injection bench telescopes
![Page 25: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/25.jpg)
25
Centering techniques
methods:
Image analysis using camera local control (only for beam splitter)
Angle to length coupling
![Page 26: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/26.jpg)
26
What has been intentionally changed?
![Page 27: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/27.jpg)
27
Scan of the B2_3f demdoulation phase(automatic alignment closed, thermal drift over)
![Page 28: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/28.jpg)
28
Laser frequency noise ?
Dark fringe signal coherent with B5_ACp between 240 Hz and 6 kHz
B5_ACp = error signal of the laser frequency stabilization loop (SSFS)
Also coherent with the angular error signals of IMC automatic alignment
B5_ACp superimposed on Dark Fringe Signal using the 444 and 1111 Hz lines
See logbook entry 12603 by M. Evans
Sensitivity
B5_ACp
Conclusion : B1_ACp and B5_ACp see the same noise (presumably laser frequency noise)
![Page 29: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/29.jpg)
29
Global view for 2006
Main task Duration (weeks) In parallel/remarks
Completion of recycled interferometer commissioning
8 High frequency noise hunting robustness increase locking loops
Noise hunting: already planned operations (actuators noise reduction, acoustic enclosure, feet detection lab)
6 High frequency noise huntung
Noise hunting: control noises “first reduction” (angular and longitudinal)
6 High and intermediated frequency noise hunting
Noise hunting: scattered light reduction
4 High and intermediated frequency noise hunting
Total: 6 months (end of 2006)
Start data taking during long week-end as soon as the interferometer is stable and sensitivity better than C7 (september?)
Priority to the high-intermediate frequency range
Goal: factor 10 in the inspiral range
![Page 30: 1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.](https://reader036.fdocuments.in/reader036/viewer/2022070414/5697c0151a28abf838cce1cb/html5/thumbnails/30.jpg)
30
Plans for 2007
Science data taking
Shutdown with upgrades to be defined:
Eddy current removal
Thermal compensation implementation
Acoustic mitigation 2nd generation?
Optical table re-shuffling and diffused light mitigation 2nd generation ?
Mode-cleaner mirror replacement ?
Re-commissioning
Noise hunting 2nd phase