Utility Net Metering
Challenges Needing Solutions
Jeff CurryLakeland ElectricJanuary 28, 2015
![Page 2: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/2.jpg)
22
Utility Net MeteringLakeland’s History
• 1999 20 rooftop PV systems (utility test sites)• 2003 First private residential net metered system• 2007 Total of 5 customer-owned PV systems • 2008 PSC Rule 25-6.065 Interconnection and Net Metering of Customer- Owned Renewable Generation• 2009 FL Statute 366.91(6) …”each municipal electric utility and each rural electric cooperative… shall develop a standardized interconnection agreement and net metering program for customer-owned renewable generation…”• 2015 Total: 116 net metered locations in Lakeland
![Page 3: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/3.jpg)
33
Utility Net Metering
![Page 4: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/4.jpg)
44
Utility Net Metering
![Page 5: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/5.jpg)
55
Utility Net Metering
Technical complications
• Multiple interconnections • Solar assisted HVAC• Battery storage (EPS vs. daily usage)• Non-renewable generators• Required permits• Plug-in solar (120v)• Smart meters
![Page 6: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/6.jpg)
66
Utility Net MeteringOther interconnection models:
• Retail wheeling• IPP’s (Independent power producers)• Feed-In Tariff• Community Solar
• Conjunctive billing • TOU (Time of Use) • Stand-By billing rates
Hybrid with other utility programs:
![Page 7: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/7.jpg)
77
Utility Net MeteringLegal & Contractual Issues
• Real estate turnover • Disclosures • Buyer agreement• Rental properties • Crossing property lines• Income tax reporting• Equipment leasing
![Page 8: 1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062423/56649f0b5503460f94c1e72a/html5/thumbnails/8.jpg)
88
Utility Net Metering
Conclusions:
• NEM is not one-dimensional• Too many unwritten rules• Unlimited mutations• Policy-making is open to interpretation• Not an objective discipline• PSC rule and FL Statute do not provide clarity/guidance