    Punj Lloyd Limited

    Safety Tool Box Tal k/ Training Reco rd

    Date of Talk Time

    Engineer / Supervisor Activity

    TOPICS: CUTTING AND WELDING (FIRE PREVENTION)

    1. Fire kills over thousands of people every year and injuries many more; it destroys jobs

    and property and costs millions of rupees in the payment of insurance claims.

    2. The practical steps, which you can take to prevent fire, are a cost effective investment,

    which may bring great benefits. The large majority of fire can be prevented by taking

    simple precaution and by adopting safe working practice.

    3. Every fire no matter how large the end result starts from a small beginning, but certain

    fundamentals are common to every incident.

    4. Remember 3 factors are necessary for a fire (a) Heat (b) Oxygen (c) Fuel, if one factor

    is isolated or removed fire will be extinguished.

    5. So to avoid unplanned fire in Gas Cutting activities,

    Keep all gas cylinders vertical and chained.

    Wet cloth should be placed upon the DA cylinder.

    Every cylinder must be equipped with a flash back arrestor.

    Check all hose, hose connection, regulator and cutting torch before starting ofwork, use only hose clamp.

    Color code of Gas Cylinders and Hoses to be known to all (Refer

    attached sheet for color code)

    In no case the hoses to be interchanged.

    The key should always be near cylinder

    Check that dry grass is not nearby

    6. For welding activity

    Check all electrical connection,

    Use proper industrial plug

    Generator is earthed properly (Copper cable with brass pin which is requiredto be inserted in soil, the soil is required to be made wet using water)

    Welding cable is insulated properly

    Ensure that holders are having insulation on electrode holder, Proper earthing to the job (not loose, it should not be of broken file but

    preferably of same material as that of job),

    Working area must be free from combustible material, proper cable

    management, no power cable or gas hose should be coiled with welding

    cables, hot electrode piece must not be thrown here and there.

    In pay welder no leaked diesel / oil is collected

    Notes:

    Maximum time of talk is 15 minutes Persons attending write / sign their names on the rear side of sheet / attached

    sheet.

  • 7/27/2019 1 TBT Gas Cylinder-1

    2/6

    Punj Lloyd Limited

    Safety Tool Box Tal k/ Training Reco rd

    Date of Talk Time

    Personalize toolbox talk, Check feedback, show picture, activity, equipment

    etc. to improve understanding.

    It should preferably cover one subject

    Hosecolor is notcorrectItshouldbeOrange, Noclampused

  • 7/27/2019 1 TBT Gas Cylinder-1

    3/6

    Punj Lloyd Limited

    Safety Tool Box Tal k/ Training Reco rd

    Date of Talk Time

    No cylinder caps,Storage areanotdefined

  • 7/27/2019 1 TBT Gas Cylinder-1

    4/6

    InstallationofFlashBackArrestor

    Punj Lloyd Limited

    Safety Tool Box Tal k/ Training Reco rd

    Date of Talk Time

    Hoses are Cracked

  • 7/27/2019 1 TBT Gas Cylinder-1

    5/6

    Hoses are Cracked

    Punj Lloyd Limited

    Safety Tool Box Tal k/ Training Reco rd

    Date of Talk Time

  • 7/27/2019 1 TBT Gas Cylinder-1

    6/6

    Punj Lloyd Limited

    Safety Tool Box Tal k/ Training Reco rd

    Date of Talk Time