1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration,...
-
date post
21-Dec-2015 -
Category
Documents
-
view
217 -
download
1
Transcript of 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration,...
![Page 1: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/1.jpg)
1
Student Hands On Training I (2009)
Construction,Integration,
and Test
Construction,Integration,
and Test
![Page 2: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/2.jpg)
2
Hands-on: Construction and Integration
![Page 3: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/3.jpg)
3
Hands-on: Construction and Integration
![Page 4: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/4.jpg)
4
Hands-on: Construction and Integration
- Your team will have 2.5 hours today to do the following:
- Layout and construct BalloonSat structure- Insulate structure- Integrate and test systems- Install switches- Secure and organize wiring- Install flight string attachment tube
![Page 5: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/5.jpg)
5
- BalloonSats are commonly made of foam core
- Foam core is a simple, low cost composite panel
- You will use hot glue and Xacto knives to create your box
- There is a OK way of building with foam core
- Cut individual pieces and glue them together
- This way works but is not the best and requires more “belts and suspenders”
Hands-on: Construction and Integration
![Page 6: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/6.jpg)
BalloonSat Construction:
- There is a BETTER way of building with foam core- Requires algebra and geometry
- See paper in back of your course book
-
![Page 7: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/7.jpg)
BalloonSat Construction:
- When cutting foam core, remember you are cutting through three layers
- Best to cut each layer individually
- Go slow, use metal edge ruler
- Be mindful
![Page 8: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/8.jpg)
- Step 1: Layout box design on foam core sheet
In the interest of time, each team will be given a pre-traced foam board (black with labels)
BalloonSat Construction:
![Page 9: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/9.jpg)
![Page 10: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/10.jpg)
BalloonSat Construction:
- Step 2: Cut it out
![Page 11: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/11.jpg)
BalloonSat Construction:
- Step 2: Cut it out
![Page 12: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/12.jpg)
- Draw center lines between inner and outer lines
- All edge cuts are at 45 degree angles to the centerline
- Cut inside edges first and only through top paper and foam not bottom paper (hinge)
- Cut outside edges last but all the way through
- Go Slow and don’t cut the tables
- Please dispose of Xacto blades properly
Hands-on: Construction and Integration
![Page 13: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/13.jpg)
Hands-on: Construction and Integration
![Page 14: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/14.jpg)
- Cut holes for switch and camera lens
- Cut hole through center for balloon attachment tube
Hands-on: Construction and Integration
![Page 15: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/15.jpg)
BalloonSat Construction:
- Step 3: Practice integration and make modifications
Hold box together and figure out how much insulation you want to use. Will affect how your components sit in box
![Page 16: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/16.jpg)
BalloonSat Construction:
- Step 4: Glue it together and strengthen corners
- Your template was designed using the “Better Method”
- After gluing, cover you seams with aluminum tape
- Please don’t go overboard, weight is still an issue
![Page 17: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/17.jpg)
BalloonSat Construction:
- Step 4: Glue it together and strengthen corners
![Page 18: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/18.jpg)
18
BalloonSat Construction:
Things to remember: You only have one
- Switches
![Page 19: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/19.jpg)
19
- Install switches to box and glue switches in place from back side before making electrical connections
- Keep switches on both sides and label ON/OFF positions
- Make sure to re-connect the switch
Hands-on: Construction and Integration
![Page 20: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/20.jpg)
- Balloon attachment tube hole should run through center of box on non-opening side
- Make hole diameter as close to tube diameter as possible
- Secure with paper clip
- Make sure paper clip does not interfere with inner diameter
Hands-on: Construction and Integration
![Page 21: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/21.jpg)
21
- Integrate camera system and verify camera settings
- Integrate Flight String attachment tube and test clearance with sample string
- American Flag
Hands-on: Construction and Integration
![Page 22: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/22.jpg)
22
- Install Heater
- Test switch (let’s talk first)
- Tape in off position
- Team label and reward label on outside of box
- Bring to Chris for inspection and weigh in
- Have team picture taken
Hands-on: Construction and Integration
![Page 23: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/23.jpg)
BalloonSat Construction:
Resources in the Room:
- Construction examples in the room- Two Soldering stations- Two weigh-in station- ½” and ¼” foam insulation- Velcro- Tape- Helpers- Peace and love
![Page 24: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649d585503460f94a37f15/html5/thumbnails/24.jpg)
24
Student Hands On Training I (2009)
Questions?Questions?