1 SIGSAC VIABILITY REVIEW Sushil Jajodia March 19, 2005.
-
Upload
james-cahill -
Category
Documents
-
view
213 -
download
1
Transcript of 1 SIGSAC VIABILITY REVIEW Sushil Jajodia March 19, 2005.
1
SIGSAC VIABILITY REVIEWSIGSAC VIABILITY REVIEW
Sushil Jajodia
March 19, 2005
2
PastPastPastPast
• Activities– 2 yearly conferences (CCS and SACMAT)
• Member benefits – 2 conference proceedings every year
– Reduced registration fee
3
PresentPresentPresentPresent
• SIG Officers– Chair (Sushil Jajodia since July 2003)
– Steering committee (Atluri, Faigin, Samarati, Sandhu)
4
CCSCCSCCSCCS
• CCS has become a week long event (M-F)• 3 day conference with two parallel tracks
(Research papers track, Govt/Industry papers and Tutorial track)
• Several co-located workshops (8 in 2004)• Increasing submissions (17/64 in 1997 to
35/251 in 2004)• Increasing participants (100 up to 2001 to
375 in 2004)
5
CCS SurplusCCS SurplusCCS SurplusCCS Surplus
Year CCS Surplus
2000 $914
2001 $27,962
2002 $14,017
2003 $53,044
2004 $50,000 (expected)
6
Membership and FinancesMembership and FinancesMembership and FinancesMembership and Finances
• Stable membership– 773 professional, 35 affiliate, 165 student, 1
institution
• Improving fund balance– June ’01 $16,760
– June ’02 $34,330
– June ’03 $41,754
– June ’04 $93,325
7
FutureFutureFutureFuture
• Elections– Chair: Sushil Jajodia, Virgil Gligor
– Vice-chair: Pierangela Samarati, Paul Kendall
– Treasurer/Secretary: Vijay Atluri, Chuck Youman
• Awards (Outstanding Innovation and Outstanding Contribution)
• High quality conference in Asia (Asia CCS) in March 2006