1 RoadMap IBS
Transcript of 1 RoadMap IBS
-
7/27/2019 1 RoadMap IBS
1/83
Industrialization ofConstruction Sector
-
7/27/2019 1 RoadMap IBS
2/83
Industrialised Construction 2
Terms
MMC - Modern MethodConstruction
OFFSITE Pre-casting/fabricating Out of Site
IBS - Industrialised BuildingSystem
-
7/27/2019 1 RoadMap IBS
3/83
Industrialised Construction 3
-
7/27/2019 1 RoadMap IBS
4/83
Industrialised Construction 4
Content
Introduction
Current Scenario of MalaysianConstruction Industry
Promoting IBS SimplifyingConstruction
The Way Forward Case Study
Conclusion
-
7/27/2019 1 RoadMap IBS
5/83
Industrialised Construction 5
Endorsed by the
Cabinet 29th Oct2003
Introduction
IBSRoadmap
2003-2010
-
7/27/2019 1 RoadMap IBS
6/83
Industrialised Construction 6
. the blueprint document towards
achieving the Industrialization of
the construction sectorand the
longer term objective ofOpen
Building Concept.
IBS ROADMAP 2003 - 2010
-
7/27/2019 1 RoadMap IBS
7/83
Industrialised Construction 7
Cabinet
Ministry of Works
[Inter-Ministry coordination committee]
[Chaired by : KSU KKR]
Ministries Agencies
CIDB
Implementation
Coordinator/secretariat
IBS Steering Com.
Stakeholders
Policy
Implementing the Roadmap
-
7/27/2019 1 RoadMap IBS
8/83
Industrialised Construction 8
Poor Site Condition
Messy sites
Poor S & H
High wastage
Labour intensive
Low quality
Delays
Current Scenario of Malaysian Construction Industry
-
7/27/2019 1 RoadMap IBS
9/83
Industrialised Construction 9
-
7/27/2019 1 RoadMap IBS
10/83
Industrialised Construction 10
DIRTY
DIFFICULT
DANGEROUS
So what is construction now ?
-
7/27/2019 1 RoadMap IBS
11/83
Industrialised Construction 11
Construction techniques in whichcomponents are manufactured in a
factory, on or off site, positioned and
assembled into a structure withminimal additional site works
Promoting Industrialized Building Systems
Simplifying Construction
-
7/27/2019 1 RoadMap IBS
12/83
Industrialised Construction 12
-
7/27/2019 1 RoadMap IBS
13/83
Industrialised Construction 13
positioned and assembled into a structure with
minimal additional site works
-
7/27/2019 1 RoadMap IBS
14/83
Industrialised Construction 14
Processing
of steel
Assembly
of floor frame
Assembly of
ceiling frame
Assembly of
sidewall frames
Assembly of
structural unitAttachment of
exterior walls
Application
of insulators
Attachment ofinterior walls
Incorporation of
kitchen facilities
Incorporation of
bath and sanitary
facilities
Final inspection
Packing
ShipmentDeliveryInstallation
Manufactured House (Sekisui)
-
7/27/2019 1 RoadMap IBS
15/83
Industrialised Construction 15
-
7/27/2019 1 RoadMap IBS
16/83
Industrialised Construction 16
-
7/27/2019 1 RoadMap IBS
17/83
Industrialised Construction 17
FIGURE 4.3 - Knowledge in Industrialised Building
Systems (IBS)
34%
66%
% GOOD % POOR
IBS Survey 2005 Survey on the
Malaysian Architects Knowledge in
IBS Construction
-
7/27/2019 1 RoadMap IBS
18/83
Industrialised Construction 18
FIGURE 4.5 - Experience in Using IBS Components in
Building Projects
30%
70%
YES NO
IBS Survey 2005 Survey on the
Malaysian Architects Experience in
Using IBS Components
-
7/27/2019 1 RoadMap IBS
19/83
Industrialised Construction 19
CHARACTERISTIC1. Industrial production of components
(prefab, pre-cast under controlledenvironment) or highly mechanised in-situ
processes (slip forms, etc.)
2. Labour reduction3. Modular Coordination - Open building
concept
4. Modern design / manufacturing(ex.CAD/CAM)
5. Systematic Quality Control (ISO 9000
QMS)
-
7/27/2019 1 RoadMap IBS
20/83
Industrialised Construction 20
PRE-CAST CONCRETE FRAMING,BOX SYSTEMS
-
7/27/2019 1 RoadMap IBS
21/83
Industrialised Construction 21
PRE-CAST CONCRETE FRAMING
-
7/27/2019 1 RoadMap IBS
22/83
Industrialised Construction 22
Tunnel forms,
beams andcolumn moulding
forms, permanent
steel formworks
(metal decks), etc
STEEL FORMWORKSSYSTEMS
-
7/27/2019 1 RoadMap IBS
23/83
Industrialised Construction 23
Steel beams and
columns, portal frames,
roof trusses, etc
STEEL FRAME SYSTEMS
-
7/27/2019 1 RoadMap IBS
24/83
Industrialised Construction 24
Timber frames,roof trusses, etc
PREFAB TIMBERFRAME SYSTEMS
-
7/27/2019 1 RoadMap IBS
25/83
Industrialised Construction 25
Interlocking
concrete masonryunit, lightweight
concrete blocks,
etc
BLOCK WORK SYSTEMS
-
7/27/2019 1 RoadMap IBS
26/83
Industrialised Construction 26
BENEFITS
1. Reduction of site labour2. Minimal wastage
3. Less site materials
4. Cleaner environment
5. Controlled quality
6. Neater and safer sites7. Faster project completion
8. Lower construction costs
Shorter construction period; if there is consistently large
-
7/27/2019 1 RoadMap IBS
27/83
Industrialised Construction 27
Shorter construction period; if there is consistently large
number of apartments to be constructed.Time Scale (Months)
Precast System 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Production
Foundation Concurrently done ( with 2 week lead time)
Erection
Finishing
Mechanical & Electrical
Infrastructure
Testing & commisioning
Handing Over
Overall completion Period
Conventional System 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Foundation
Construction- superstructure
Finishing
Mechanical & Electrical
Infrastructure
Testing & commisioning
Handing Over
Overall completion Period
18 Month Completion
24 Month Completion
-
7/27/2019 1 RoadMap IBS
28/83
Industrialised Construction 28
Labour efficient through
mechanisation, reduces
30% labour
-
7/27/2019 1 RoadMap IBS
29/83
Industrialised Construction 29
IBS Not A New Concept
Concept of prefabrication started
from the panellised timberhouses shipped form England to
the new settlements in America
History
-
7/27/2019 1 RoadMap IBS
30/83
Industrialised Construction 30
IBS inMalaysia
-
7/27/2019 1 RoadMap IBS
31/83
Industrialised Construction 31
IBSComponents
-
7/27/2019 1 RoadMap IBS
32/83
Industrialised Construction 32
CIDBs efforts in promotingIBS started since 1998
Earlier, concentrated onAwareness/Promotion/
Training
EARLY EFFORTS
-
7/27/2019 1 RoadMap IBS
33/83
Industrialised Construction 33
Usage of IBS in construction of buildings is stillrelatively very low if compared to infra works
(bridges, tunnels, etc)
Only 15% IBS in building
Main Reason :
Relatively cheap and abundant supply of
foreign labourfor Malaysian industry; labourcost in developed economies such as Finland -
10 times the rates in Malaysia
Usage
-
7/27/2019 1 RoadMap IBS
34/83
Industrialised Construction 34
Because labour is not going to stay
cheap and abundant forever and
disruption to supply is catastrophic
Industry needs better productivity,
quality and safety to be globally
competitive
Move towards k-economy
Labour is cheap, so why IBS?
-
7/27/2019 1 RoadMap IBS
35/83
Industrialised Construction 35
True . components cost higher than
conventional, but in-situ construction has
hidden costs that usually leads to higher
expenditure; due to rectifications, wastages, etc.
Cost higher because:
Low demand
Low standardisation of components (moulds
need to custom made or adjusted to suit
orders)
IBS COMPONENTS AREEXPENSIVE, SO WHY IBS?
-
7/27/2019 1 RoadMap IBS
36/83
Industrialised Construction 36
IBS RoadMap 2003-2010
THE WAY FORWARD
-
7/27/2019 1 RoadMap IBS
37/83
Industrialised Construction 37
BUILT-IN
COMPONENTS
STRUCTURAL
COMPONENTSRAILING
COMPONENTS
DOOR
COMPONENTS
WINDOW
COMPONENTS
Industrialised ConstructionThrough Components Industry
St d di ti /
-
7/27/2019 1 RoadMap IBS
38/83
Industrialised Construction 38
To facilitate open
industrialization,
coordination is
needed in termsof:
Dimensions
Tolerance
Joints and details
Technical
compatibility
Standardisation/Coordination
IBS HOLLISTIC
-
7/27/2019 1 RoadMap IBS
39/83
Industrialised Construction 39
Vendors,
manufacturer
Contractor, assemblers, fabricators
Designers,(architects, engineers)
Client/As
set
ma
IBS ComponentCatalogues
Design Guides
IBS - HOLLISTICAPPROACH
Publication Materials
http://images.google.com.my/imgres?imgurl=www.theorangefactory.com/images/factory.gif&imgrefurl=http://www.theorangefactory.com/&h=250&w=247&sz=4&tbnid=SAFvfE9z59YJ:&tbnh=105&tbnw=104&start=17&prev=/images%3Fq%3Dfactory%2B%26hl%3Den%26lr%3D%26ie%3DUTF-8http://images.google.com.my/imgres?imgurl=www.theorangefactory.com/images/factory.gif&imgrefurl=http://www.theorangefactory.com/&h=250&w=247&sz=4&tbnid=SAFvfE9z59YJ:&tbnh=105&tbnw=104&start=17&prev=/images%3Fq%3Dfactory%2B%26hl%3Den%26lr%3D%26ie%3DUTF-8http://images.google.com.my/imgres?imgurl=www.theorangefactory.com/images/factory.gif&imgrefurl=http://www.theorangefactory.com/&h=250&w=247&sz=4&tbnid=SAFvfE9z59YJ:&tbnh=105&tbnw=104&start=17&prev=/images%3Fq%3Dfactory%2B%26hl%3Den%26lr%3D%26ie%3DUTF-8 -
7/27/2019 1 RoadMap IBS
40/83
Industrialised Construction 40
MS 1064 : 2001 :GUIDE TO MODULAR
COORDINATION IN BUILDINGS
PART 1: General Principles
PART 2: Storey and Room Heights
PART 3: Coordinating Sizes and Preferred Dimensions for Stairs and Stairs
Opening
PART 4: Coordinating Sizes and Preferred Dimensions for Doorsets
PART 5: Coordinating Sizes and Preferred Dimensions for WindowsetsPART 6: Coordinating Sizes and Preferred Dimensions for Rigid Flat Sheet
PART 7: Coordinating Sizes and Preferred Dimensions for Tiles
PART 8: Coordinating Sizes and Preferred Dimensions for Masonry Bricks and
Blocks
PART 9: Coordinating Sizes and Preferred Dimensions for Cabinets
PART 10: Coordinating Sizes and Preferred Dimensions for RC Components
Gazetted Oct. 2002
Th W F d
-
7/27/2019 1 RoadMap IBS
41/83
Industrialised Construction 41
The Way ForwardModular Coordination (MC)
ModularisationBased on MS1064,
MC coordinates thepositions, dimensions of
components and spaces
in building designsBase module :
M = 100 mm
-
7/27/2019 1 RoadMap IBS
42/83
Industrialised Construction 43
Strategies
Promote industrialisation;Enforcement; Incentives;
Awareness; Promotion;
Training
Main targethousing sector
Repetitive; High volume
-
7/27/2019 1 RoadMap IBS
43/83
Industrialised Construction 44
Closed System
mass - productionone end product
etc.
Mula-mula:Projek
Kemudian:Sistem
Bekalan:Syarikat tertentu
First a project Then a system Always thirdparty supply
Current Scenario
-
7/27/2019 1 RoadMap IBS
44/83
Industrialised Construction 45
Open System
DESIGN GUIDE
CATALOGUE
etc.
?
?
First a system Then manyprojects
Open supply
Future Scenario
-
7/27/2019 1 RoadMap IBS
45/83
Industrialised Construction 46
IBS Roadmap 2003-2010
1. Manpower
2. Materials/Components/Machines
3. Management/Process/Methods
4. Monetary/Economic/Financial
5. Marketing/Promotion
FIVE main elements
-
7/27/2019 1 RoadMap IBS
46/83
Industrialised Construction 47
To have a labour policy that graduallyreduces PERCENTAGE OF FOREIGNWORKERS from the current 75% to 55%
in 2005, 25% in 2007 and 15% in 2009. To incorporate IBS in CPDcourses for
architects, engineers and others.
To incorporate SYLLABUS ON IBS inarchitecture, engineering, buildingcourses in IPTs.
MANPOWER
-
7/27/2019 1 RoadMap IBS
47/83
Industrialised Construction 48
Continue efforts to develop NOSS(National Occupational Skill Standards).
Continue Workers training and certification
programme to include all types of IBS. Commence training programme on mould
making for IBS components.
Commence industrial expertise awarenessprogramme together with IBSmanufacturer through on-job training.
MANPOWER
-
7/27/2019 1 RoadMap IBS
48/83
Industrialised Construction 49
Commence site supervisory training andcertification programme which includes
knowledge on IBS To start BUMIPUTERA IBS MANUFACTURERS
AND SPECIALISED CONTRACTORS training
and financial aid
MANPOWER
-
7/27/2019 1 RoadMap IBS
49/83
Industrialised Construction 50
Enforce use of Modular Coordination
based on MS 1064 through UniformedBuilding By Laws (UBBL) by localauthorities.
Continue publishing reference booksand case study reports regarding IBS.
Continue writing new MalaysianStandards (MS) covering all types of IBS.
Continue writing new Construction
Industry Standards (CIS).
MATERIALS
-
7/27/2019 1 RoadMap IBS
50/83
Industrialised Construction 51
Develop software for MC componentsand dimensioning.
Include the IBS/MC knowledge intothe standards of practice and trainingmodules for the training and
certification of Project Manager.
MANAGEMENT
-
7/27/2019 1 RoadMap IBS
51/83
Industrialised Construction 52
Offer specialised contractors trainingand certification programmes to
cater for IBS related registrationcodes.
Continually update the website to
disseminate information on IBS, MCand OBS.
MANAGEMENT
-
7/27/2019 1 RoadMap IBS
52/83
Industrialised Construction 53
Enforce IBS usage in government(building) projects in phases (from 30%in 2004 to 70% in 2008).
Offerlevy exemptions from 2004 forlow cost, low medium cost andmedium cost housing projects.
Offer training schemes and financialloans for manufacture andcontractors.
MONETARY
-
7/27/2019 1 RoadMap IBS
53/83
Industrialised Construction 54
Introduce Buildability Programmebeginning 2006 for private (building)projects and enforcing it through the
local Authorities in 2008. Use IBS construct 30% of the 150,000
units of houses proposed to be built by
Syarikat Perumahan Negara Berhadunder the 2003 Economy StimulusPackages.
MONETARY
-
7/27/2019 1 RoadMap IBS
54/83
Industrialised Construction 55
Publish IBS product catalogues. Continue IBS/MC road show
programmes at the national and
international levels.
Establish IBS as the main criteria forMalaysian Construction Industry
Excellence Awards.
Introduce concept of Open buildingSystems to the industry.
MARKETING
-
7/27/2019 1 RoadMap IBS
55/83
Industrialised Construction 56
1. Directives- Govt building projects 50% IBS
Score
- 100,000 affordable houses usingIBS
2. Incentive
- Zero levy for residential projects 50% IBS Score
2005 Budget
-
7/27/2019 1 RoadMap IBS
56/83
Industrialised Construction 57
IBS Scoring
Part 1 Structural
Element (50%) Part 2 Wall
Element (30%)
Part 3 OtherSimplifiedSolution (20%)
-
7/27/2019 1 RoadMap IBS
57/83
Industrialised Construction 58
Case Studies
SJK(C) DAMANSARAPETALING JAYA
SELANGOR DARUL EHSAN
Case Study
-
7/27/2019 1 RoadMap IBS
58/83
Industrialised Construction 59FEB - MAC 2001
Piling works
Case Study
FEB 2001 Earth works
PROJECT DETAILSCabinets directive - 31Januari 2001
To be completed in 2001 8 monthsproject site : 2 .1 hectarespossession of site : 1 February 2001completion : 31 July 2001
construction period : 5 1/2 months
-
7/27/2019 1 RoadMap IBS
59/83
Industrialised Construction 60
MAC 2001
MAC 2001
Fast track project usingprefabricated components
Beams, floor slabs (halfslabs with concrete topping)and staircases wereprefabricated in the factory,wall panel are hollow blocks
Columns and toilets werecast in-situ
Groundlevel
Level 1
-
7/27/2019 1 RoadMap IBS
60/83
Industrialised Construction 61
MAC - APRIL 2001
Level 2
APRIL - MEI 2001
Level 3
-
7/27/2019 1 RoadMap IBS
61/83
Industrialised Construction 62
APR - MEI 2001
Roof level
External worksJUNE 2001
-
7/27/2019 1 RoadMap IBS
62/83
Industrialised Construction 63
Front
elevation
Backelevation
SEK KEB BRICKFIELDS 1 KUALA LUMPUR
-
7/27/2019 1 RoadMap IBS
63/83
Industrialised Construction 64
IBS Structure: Hollowcore
slabs; precast concrete columns
& beams
9,900 m2, 4 Floors
Completion in 8 months
SEK. KEB. BRICKFIELDS 1, KUALA LUMPUR
-
7/27/2019 1 RoadMap IBS
64/83
Industrialised Construction 65
A compact design fortwo schools in land
area of 48,200 m
2
.
Start of project : 6 February 2003Completion : 17 Sept. 2003
Period : 8 months
i t ll ti f t l
-
7/27/2019 1 RoadMap IBS
65/83
Industrialised Construction 66
project constraints limited site, busyaccess, short construction period
75 % of building components wereprefabricated
Prefab components used columns,beams, hollow core floor slabs,staircases, wall panels (Acotechpanels)
installation of precast column
-
7/27/2019 1 RoadMap IBS
66/83
Industrialised Construction 67
Architectural features bright faade,cascading roofs with large overhangs,internal pockets of large and smallcourtyards
Installation of first floor slab on 02.05.03
Installation of 3rd floor slab on 28.05.03
-
7/27/2019 1 RoadMap IBS
67/83
Industrialised Construction 68
fixing of wall panel
-
7/27/2019 1 RoadMap IBS
68/83
Industrialised Construction 69
Completion ofexternal wall on16.07.03
installation of precast staircases
NEW DESIGN FOR
-
7/27/2019 1 RoadMap IBS
69/83
Industrialised Construction 70
NEW DESIGN FORGOVERNMENT QUARTERS
In 2001 new design alternativesfor all categories of governmentquarters were initiated
application of modular coordination use of building components flexibility and creativity in design
and the concept of sustainabledesign
standardised components for
interchangeability between designs
Akademi Audit
-
7/27/2019 1 RoadMap IBS
70/83
Industrialised Construction 71
Krtrs kelas F & G load bearingdesign, precast wall, slab, column
& beam
Akademi AuditNegara, Nilai
B l i P li
S
-
7/27/2019 1 RoadMap IBS
71/83
Industrialised Construction 72
Balai Polis Senawang
Kuaters Kelas FFrame system : cast-in-situcolumn & beam, precast infill
wall & slab
Kuaters Kelas G
IBS PROJECTS
-
7/27/2019 1 RoadMap IBS
72/83
Industrialised Construction 73
IBS PROJECTS
HOLLOWCORE SLABS; PRECASTCONCRETE COLUMNS & BEAMS
25,500 m2, 3 FLOORS
STRUCTURAL CONSTRUCTION: 4 MONTHS
-
7/27/2019 1 RoadMap IBS
73/83
Industrialised Construction 74
PENANG STATE GOVERNMENT
IBS STRUCTURE: HOLLOWCORESLABS; PRECAST CONCRETE
COLUMNS & BEAMS
7,500 m2, 4 FLOORS
STRUCTURAL CONSTRUCTION: 2
MONTHS
DEWAN MILENIUM, KEPALA BATAS
INDOOR STADIUM, BALIK PULAU
-
7/27/2019 1 RoadMap IBS
74/83
Industrialised Construction 75
MAJLIS PERBANDARAN PPINANG
IBS STRUCTURE:HOLLOWCORE SLABS;
PRECAST CONCRETE
COLUMNS, BEAMS &
BLEACHERS
6,000 m2, 3 FLOORS
STRUCTURAL
CONSTRUCTION: 2 MONTHS
,
RESIDENTIAL & OFFICE
-
7/27/2019 1 RoadMap IBS
75/83
Industrialised Construction 76
IBS STRUCTURE: METAL
FORMWORKS FOR WALLS,
SLABS, BEAMS & COLUMNS
TWO 26-30 STOREY TOWERS(APARTMENTS & OFFICES)
STRUCTURAL
CONSTRUCTION: 6 MONTHS
NORTHAM CITY, PULAU PINANG
IBS STRUCTURE: TEACHERS QUARTERS,
-
7/27/2019 1 RoadMap IBS
76/83
Industrialised Construction 77
IBS STRUCTURE:
LIGHTWEIGHT BLOCKS &
PRECAST CONCRETE WALLS;
PRECAST CONCRETE SLABS
10,000 UNITS, 4-5 STOREY
109 LOCATIONS IN 9 STATES
COMPLETION IN 3 YEARS
TEACHERS QUARTERS,
ALL OVER MALAYSIA
AKADEMI BINAAN MALAYSIA,
-
7/27/2019 1 RoadMap IBS
77/83
Industrialised Construction 78
CIDB MALAYSIA
IBS STRUCTURE: PRECAST
CONCRETE SLABS, BEAMS,
COLUMNS & WALLS 9,600 m2, 6 WORKSHOP
BLOCKS
STRUCTURAL
CONSTRUCTION: 3 MONTHS
SINTOK, KEDAH
HOSPITAL SERDANG SELANGOR
-
7/27/2019 1 RoadMap IBS
78/83
Industrialised Construction 79
MINISTRY OF HEALTH
620-BED HOSPITAL
HYBRID IBS STRUCTURE OF
STEEL FRAMES; PRECAST
CONCRETE SLABS;
LIGHTWEIGHT CONCRETE
BLOCKS FOR WALLS
130,000 m2, 9 FLOORS
STRUCTURAL CONSTRUCTION:
4 MONTHS
HOSPITAL SERDANG, SELANGOR
SHOPPING COMPLEX DAMANSARA
-
7/27/2019 1 RoadMap IBS
79/83
Industrialised Construction 80
IBS STRUCTURE: SOLID & HOLLOWCORE
SLABS; PRECAST CONCRETE WALLS,
STAIRCASES, GUTTERS, BEAMS & COLUMNS 121,000 m2, 4 FLOORS, 2 BASEMENTS
STRUCTURAL CONSTRUCTION: 4 MONTHS
SHOPPING COMPLEX, DAMANSARA
RESIDENTIAL APARTMENTS,
PUTRAJAYA
-
7/27/2019 1 RoadMap IBS
80/83
Industrialised Construction 81
IBS STRUCTURE: PRECAST
CONCRETE SLABS, WALLS &
STAIRCASES
756 UNITS, 6 BLOCKS, 8-16FLOORS
CONSTRUCTION: 18 MONTHS
PUTRAJAYA
Concl sion
-
7/27/2019 1 RoadMap IBS
81/83
Industrialised Construction 82
Conclusion
IBS ROADMAP 2003-2010: Towardslabour reduction and better
productivity, quality, safety &
environment; reducing total industrycosts
INCREASING THE CONSTRUCTION
INDUSTRY COMPETITIVENESS
-
7/27/2019 1 RoadMap IBS
82/83
Industrialised Construction83
Thank You
-