1 RoadMap IBS

download 1 RoadMap IBS

of 83

Transcript of 1 RoadMap IBS

  • 7/27/2019 1 RoadMap IBS

    1/83

    Industrialization ofConstruction Sector

  • 7/27/2019 1 RoadMap IBS

    2/83

    Industrialised Construction 2

    Terms

    MMC - Modern MethodConstruction

    OFFSITE Pre-casting/fabricating Out of Site

    IBS - Industrialised BuildingSystem

  • 7/27/2019 1 RoadMap IBS

    3/83

    Industrialised Construction 3

  • 7/27/2019 1 RoadMap IBS

    4/83

    Industrialised Construction 4

    Content

    Introduction

    Current Scenario of MalaysianConstruction Industry

    Promoting IBS SimplifyingConstruction

    The Way Forward Case Study

    Conclusion

  • 7/27/2019 1 RoadMap IBS

    5/83

    Industrialised Construction 5

    Endorsed by the

    Cabinet 29th Oct2003

    Introduction

    IBSRoadmap

    2003-2010

  • 7/27/2019 1 RoadMap IBS

    6/83

    Industrialised Construction 6

    . the blueprint document towards

    achieving the Industrialization of

    the construction sectorand the

    longer term objective ofOpen

    Building Concept.

    IBS ROADMAP 2003 - 2010

  • 7/27/2019 1 RoadMap IBS

    7/83

    Industrialised Construction 7

    Cabinet

    Ministry of Works

    [Inter-Ministry coordination committee]

    [Chaired by : KSU KKR]

    Ministries Agencies

    CIDB

    Implementation

    Coordinator/secretariat

    IBS Steering Com.

    Stakeholders

    Policy

    Implementing the Roadmap

  • 7/27/2019 1 RoadMap IBS

    8/83

    Industrialised Construction 8

    Poor Site Condition

    Messy sites

    Poor S & H

    High wastage

    Labour intensive

    Low quality

    Delays

    Current Scenario of Malaysian Construction Industry

  • 7/27/2019 1 RoadMap IBS

    9/83

    Industrialised Construction 9

  • 7/27/2019 1 RoadMap IBS

    10/83

    Industrialised Construction 10

    DIRTY

    DIFFICULT

    DANGEROUS

    So what is construction now ?

  • 7/27/2019 1 RoadMap IBS

    11/83

    Industrialised Construction 11

    Construction techniques in whichcomponents are manufactured in a

    factory, on or off site, positioned and

    assembled into a structure withminimal additional site works

    Promoting Industrialized Building Systems

    Simplifying Construction

  • 7/27/2019 1 RoadMap IBS

    12/83

    Industrialised Construction 12

  • 7/27/2019 1 RoadMap IBS

    13/83

    Industrialised Construction 13

    positioned and assembled into a structure with

    minimal additional site works

  • 7/27/2019 1 RoadMap IBS

    14/83

    Industrialised Construction 14

    Processing

    of steel

    Assembly

    of floor frame

    Assembly of

    ceiling frame

    Assembly of

    sidewall frames

    Assembly of

    structural unitAttachment of

    exterior walls

    Application

    of insulators

    Attachment ofinterior walls

    Incorporation of

    kitchen facilities

    Incorporation of

    bath and sanitary

    facilities

    Final inspection

    Packing

    ShipmentDeliveryInstallation

    Manufactured House (Sekisui)

  • 7/27/2019 1 RoadMap IBS

    15/83

    Industrialised Construction 15

  • 7/27/2019 1 RoadMap IBS

    16/83

    Industrialised Construction 16

  • 7/27/2019 1 RoadMap IBS

    17/83

    Industrialised Construction 17

    FIGURE 4.3 - Knowledge in Industrialised Building

    Systems (IBS)

    34%

    66%

    % GOOD % POOR

    IBS Survey 2005 Survey on the

    Malaysian Architects Knowledge in

    IBS Construction

  • 7/27/2019 1 RoadMap IBS

    18/83

    Industrialised Construction 18

    FIGURE 4.5 - Experience in Using IBS Components in

    Building Projects

    30%

    70%

    YES NO

    IBS Survey 2005 Survey on the

    Malaysian Architects Experience in

    Using IBS Components

  • 7/27/2019 1 RoadMap IBS

    19/83

    Industrialised Construction 19

    CHARACTERISTIC1. Industrial production of components

    (prefab, pre-cast under controlledenvironment) or highly mechanised in-situ

    processes (slip forms, etc.)

    2. Labour reduction3. Modular Coordination - Open building

    concept

    4. Modern design / manufacturing(ex.CAD/CAM)

    5. Systematic Quality Control (ISO 9000

    QMS)

  • 7/27/2019 1 RoadMap IBS

    20/83

    Industrialised Construction 20

    PRE-CAST CONCRETE FRAMING,BOX SYSTEMS

  • 7/27/2019 1 RoadMap IBS

    21/83

    Industrialised Construction 21

    PRE-CAST CONCRETE FRAMING

  • 7/27/2019 1 RoadMap IBS

    22/83

    Industrialised Construction 22

    Tunnel forms,

    beams andcolumn moulding

    forms, permanent

    steel formworks

    (metal decks), etc

    STEEL FORMWORKSSYSTEMS

  • 7/27/2019 1 RoadMap IBS

    23/83

    Industrialised Construction 23

    Steel beams and

    columns, portal frames,

    roof trusses, etc

    STEEL FRAME SYSTEMS

  • 7/27/2019 1 RoadMap IBS

    24/83

    Industrialised Construction 24

    Timber frames,roof trusses, etc

    PREFAB TIMBERFRAME SYSTEMS

  • 7/27/2019 1 RoadMap IBS

    25/83

    Industrialised Construction 25

    Interlocking

    concrete masonryunit, lightweight

    concrete blocks,

    etc

    BLOCK WORK SYSTEMS

  • 7/27/2019 1 RoadMap IBS

    26/83

    Industrialised Construction 26

    BENEFITS

    1. Reduction of site labour2. Minimal wastage

    3. Less site materials

    4. Cleaner environment

    5. Controlled quality

    6. Neater and safer sites7. Faster project completion

    8. Lower construction costs

    Shorter construction period; if there is consistently large

  • 7/27/2019 1 RoadMap IBS

    27/83

    Industrialised Construction 27

    Shorter construction period; if there is consistently large

    number of apartments to be constructed.Time Scale (Months)

    Precast System 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Production

    Foundation Concurrently done ( with 2 week lead time)

    Erection

    Finishing

    Mechanical & Electrical

    Infrastructure

    Testing & commisioning

    Handing Over

    Overall completion Period

    Conventional System 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Foundation

    Construction- superstructure

    Finishing

    Mechanical & Electrical

    Infrastructure

    Testing & commisioning

    Handing Over

    Overall completion Period

    18 Month Completion

    24 Month Completion

  • 7/27/2019 1 RoadMap IBS

    28/83

    Industrialised Construction 28

    Labour efficient through

    mechanisation, reduces

    30% labour

  • 7/27/2019 1 RoadMap IBS

    29/83

    Industrialised Construction 29

    IBS Not A New Concept

    Concept of prefabrication started

    from the panellised timberhouses shipped form England to

    the new settlements in America

    History

  • 7/27/2019 1 RoadMap IBS

    30/83

    Industrialised Construction 30

    IBS inMalaysia

  • 7/27/2019 1 RoadMap IBS

    31/83

    Industrialised Construction 31

    IBSComponents

  • 7/27/2019 1 RoadMap IBS

    32/83

    Industrialised Construction 32

    CIDBs efforts in promotingIBS started since 1998

    Earlier, concentrated onAwareness/Promotion/

    Training

    EARLY EFFORTS

  • 7/27/2019 1 RoadMap IBS

    33/83

    Industrialised Construction 33

    Usage of IBS in construction of buildings is stillrelatively very low if compared to infra works

    (bridges, tunnels, etc)

    Only 15% IBS in building

    Main Reason :

    Relatively cheap and abundant supply of

    foreign labourfor Malaysian industry; labourcost in developed economies such as Finland -

    10 times the rates in Malaysia

    Usage

  • 7/27/2019 1 RoadMap IBS

    34/83

    Industrialised Construction 34

    Because labour is not going to stay

    cheap and abundant forever and

    disruption to supply is catastrophic

    Industry needs better productivity,

    quality and safety to be globally

    competitive

    Move towards k-economy

    Labour is cheap, so why IBS?

  • 7/27/2019 1 RoadMap IBS

    35/83

    Industrialised Construction 35

    True . components cost higher than

    conventional, but in-situ construction has

    hidden costs that usually leads to higher

    expenditure; due to rectifications, wastages, etc.

    Cost higher because:

    Low demand

    Low standardisation of components (moulds

    need to custom made or adjusted to suit

    orders)

    IBS COMPONENTS AREEXPENSIVE, SO WHY IBS?

  • 7/27/2019 1 RoadMap IBS

    36/83

    Industrialised Construction 36

    IBS RoadMap 2003-2010

    THE WAY FORWARD

  • 7/27/2019 1 RoadMap IBS

    37/83

    Industrialised Construction 37

    BUILT-IN

    COMPONENTS

    STRUCTURAL

    COMPONENTSRAILING

    COMPONENTS

    DOOR

    COMPONENTS

    WINDOW

    COMPONENTS

    Industrialised ConstructionThrough Components Industry

    St d di ti /

  • 7/27/2019 1 RoadMap IBS

    38/83

    Industrialised Construction 38

    To facilitate open

    industrialization,

    coordination is

    needed in termsof:

    Dimensions

    Tolerance

    Joints and details

    Technical

    compatibility

    Standardisation/Coordination

    IBS HOLLISTIC

  • 7/27/2019 1 RoadMap IBS

    39/83

    Industrialised Construction 39

    Vendors,

    manufacturer

    Contractor, assemblers, fabricators

    Designers,(architects, engineers)

    Client/As

    set

    ma

    IBS ComponentCatalogues

    Design Guides

    IBS - HOLLISTICAPPROACH

    Publication Materials

    http://images.google.com.my/imgres?imgurl=www.theorangefactory.com/images/factory.gif&imgrefurl=http://www.theorangefactory.com/&h=250&w=247&sz=4&tbnid=SAFvfE9z59YJ:&tbnh=105&tbnw=104&start=17&prev=/images%3Fq%3Dfactory%2B%26hl%3Den%26lr%3D%26ie%3DUTF-8http://images.google.com.my/imgres?imgurl=www.theorangefactory.com/images/factory.gif&imgrefurl=http://www.theorangefactory.com/&h=250&w=247&sz=4&tbnid=SAFvfE9z59YJ:&tbnh=105&tbnw=104&start=17&prev=/images%3Fq%3Dfactory%2B%26hl%3Den%26lr%3D%26ie%3DUTF-8http://images.google.com.my/imgres?imgurl=www.theorangefactory.com/images/factory.gif&imgrefurl=http://www.theorangefactory.com/&h=250&w=247&sz=4&tbnid=SAFvfE9z59YJ:&tbnh=105&tbnw=104&start=17&prev=/images%3Fq%3Dfactory%2B%26hl%3Den%26lr%3D%26ie%3DUTF-8
  • 7/27/2019 1 RoadMap IBS

    40/83

    Industrialised Construction 40

    MS 1064 : 2001 :GUIDE TO MODULAR

    COORDINATION IN BUILDINGS

    PART 1: General Principles

    PART 2: Storey and Room Heights

    PART 3: Coordinating Sizes and Preferred Dimensions for Stairs and Stairs

    Opening

    PART 4: Coordinating Sizes and Preferred Dimensions for Doorsets

    PART 5: Coordinating Sizes and Preferred Dimensions for WindowsetsPART 6: Coordinating Sizes and Preferred Dimensions for Rigid Flat Sheet

    PART 7: Coordinating Sizes and Preferred Dimensions for Tiles

    PART 8: Coordinating Sizes and Preferred Dimensions for Masonry Bricks and

    Blocks

    PART 9: Coordinating Sizes and Preferred Dimensions for Cabinets

    PART 10: Coordinating Sizes and Preferred Dimensions for RC Components

    Gazetted Oct. 2002

    Th W F d

  • 7/27/2019 1 RoadMap IBS

    41/83

    Industrialised Construction 41

    The Way ForwardModular Coordination (MC)

    ModularisationBased on MS1064,

    MC coordinates thepositions, dimensions of

    components and spaces

    in building designsBase module :

    M = 100 mm

  • 7/27/2019 1 RoadMap IBS

    42/83

    Industrialised Construction 43

    Strategies

    Promote industrialisation;Enforcement; Incentives;

    Awareness; Promotion;

    Training

    Main targethousing sector

    Repetitive; High volume

  • 7/27/2019 1 RoadMap IBS

    43/83

    Industrialised Construction 44

    Closed System

    mass - productionone end product

    etc.

    Mula-mula:Projek

    Kemudian:Sistem

    Bekalan:Syarikat tertentu

    First a project Then a system Always thirdparty supply

    Current Scenario

  • 7/27/2019 1 RoadMap IBS

    44/83

    Industrialised Construction 45

    Open System

    DESIGN GUIDE

    CATALOGUE

    etc.

    ?

    ?

    First a system Then manyprojects

    Open supply

    Future Scenario

  • 7/27/2019 1 RoadMap IBS

    45/83

    Industrialised Construction 46

    IBS Roadmap 2003-2010

    1. Manpower

    2. Materials/Components/Machines

    3. Management/Process/Methods

    4. Monetary/Economic/Financial

    5. Marketing/Promotion

    FIVE main elements

  • 7/27/2019 1 RoadMap IBS

    46/83

    Industrialised Construction 47

    To have a labour policy that graduallyreduces PERCENTAGE OF FOREIGNWORKERS from the current 75% to 55%

    in 2005, 25% in 2007 and 15% in 2009. To incorporate IBS in CPDcourses for

    architects, engineers and others.

    To incorporate SYLLABUS ON IBS inarchitecture, engineering, buildingcourses in IPTs.

    MANPOWER

  • 7/27/2019 1 RoadMap IBS

    47/83

    Industrialised Construction 48

    Continue efforts to develop NOSS(National Occupational Skill Standards).

    Continue Workers training and certification

    programme to include all types of IBS. Commence training programme on mould

    making for IBS components.

    Commence industrial expertise awarenessprogramme together with IBSmanufacturer through on-job training.

    MANPOWER

  • 7/27/2019 1 RoadMap IBS

    48/83

    Industrialised Construction 49

    Commence site supervisory training andcertification programme which includes

    knowledge on IBS To start BUMIPUTERA IBS MANUFACTURERS

    AND SPECIALISED CONTRACTORS training

    and financial aid

    MANPOWER

  • 7/27/2019 1 RoadMap IBS

    49/83

    Industrialised Construction 50

    Enforce use of Modular Coordination

    based on MS 1064 through UniformedBuilding By Laws (UBBL) by localauthorities.

    Continue publishing reference booksand case study reports regarding IBS.

    Continue writing new MalaysianStandards (MS) covering all types of IBS.

    Continue writing new Construction

    Industry Standards (CIS).

    MATERIALS

  • 7/27/2019 1 RoadMap IBS

    50/83

    Industrialised Construction 51

    Develop software for MC componentsand dimensioning.

    Include the IBS/MC knowledge intothe standards of practice and trainingmodules for the training and

    certification of Project Manager.

    MANAGEMENT

  • 7/27/2019 1 RoadMap IBS

    51/83

    Industrialised Construction 52

    Offer specialised contractors trainingand certification programmes to

    cater for IBS related registrationcodes.

    Continually update the website to

    disseminate information on IBS, MCand OBS.

    MANAGEMENT

  • 7/27/2019 1 RoadMap IBS

    52/83

    Industrialised Construction 53

    Enforce IBS usage in government(building) projects in phases (from 30%in 2004 to 70% in 2008).

    Offerlevy exemptions from 2004 forlow cost, low medium cost andmedium cost housing projects.

    Offer training schemes and financialloans for manufacture andcontractors.

    MONETARY

  • 7/27/2019 1 RoadMap IBS

    53/83

    Industrialised Construction 54

    Introduce Buildability Programmebeginning 2006 for private (building)projects and enforcing it through the

    local Authorities in 2008. Use IBS construct 30% of the 150,000

    units of houses proposed to be built by

    Syarikat Perumahan Negara Berhadunder the 2003 Economy StimulusPackages.

    MONETARY

  • 7/27/2019 1 RoadMap IBS

    54/83

    Industrialised Construction 55

    Publish IBS product catalogues. Continue IBS/MC road show

    programmes at the national and

    international levels.

    Establish IBS as the main criteria forMalaysian Construction Industry

    Excellence Awards.

    Introduce concept of Open buildingSystems to the industry.

    MARKETING

  • 7/27/2019 1 RoadMap IBS

    55/83

    Industrialised Construction 56

    1. Directives- Govt building projects 50% IBS

    Score

    - 100,000 affordable houses usingIBS

    2. Incentive

    - Zero levy for residential projects 50% IBS Score

    2005 Budget

  • 7/27/2019 1 RoadMap IBS

    56/83

    Industrialised Construction 57

    IBS Scoring

    Part 1 Structural

    Element (50%) Part 2 Wall

    Element (30%)

    Part 3 OtherSimplifiedSolution (20%)

  • 7/27/2019 1 RoadMap IBS

    57/83

    Industrialised Construction 58

    Case Studies

    SJK(C) DAMANSARAPETALING JAYA

    SELANGOR DARUL EHSAN

    Case Study

  • 7/27/2019 1 RoadMap IBS

    58/83

    Industrialised Construction 59FEB - MAC 2001

    Piling works

    Case Study

    FEB 2001 Earth works

    PROJECT DETAILSCabinets directive - 31Januari 2001

    To be completed in 2001 8 monthsproject site : 2 .1 hectarespossession of site : 1 February 2001completion : 31 July 2001

    construction period : 5 1/2 months

  • 7/27/2019 1 RoadMap IBS

    59/83

    Industrialised Construction 60

    MAC 2001

    MAC 2001

    Fast track project usingprefabricated components

    Beams, floor slabs (halfslabs with concrete topping)and staircases wereprefabricated in the factory,wall panel are hollow blocks

    Columns and toilets werecast in-situ

    Groundlevel

    Level 1

  • 7/27/2019 1 RoadMap IBS

    60/83

    Industrialised Construction 61

    MAC - APRIL 2001

    Level 2

    APRIL - MEI 2001

    Level 3

  • 7/27/2019 1 RoadMap IBS

    61/83

    Industrialised Construction 62

    APR - MEI 2001

    Roof level

    External worksJUNE 2001

  • 7/27/2019 1 RoadMap IBS

    62/83

    Industrialised Construction 63

    Front

    elevation

    Backelevation

    SEK KEB BRICKFIELDS 1 KUALA LUMPUR

  • 7/27/2019 1 RoadMap IBS

    63/83

    Industrialised Construction 64

    IBS Structure: Hollowcore

    slabs; precast concrete columns

    & beams

    9,900 m2, 4 Floors

    Completion in 8 months

    SEK. KEB. BRICKFIELDS 1, KUALA LUMPUR

  • 7/27/2019 1 RoadMap IBS

    64/83

    Industrialised Construction 65

    A compact design fortwo schools in land

    area of 48,200 m

    2

    .

    Start of project : 6 February 2003Completion : 17 Sept. 2003

    Period : 8 months

    i t ll ti f t l

  • 7/27/2019 1 RoadMap IBS

    65/83

    Industrialised Construction 66

    project constraints limited site, busyaccess, short construction period

    75 % of building components wereprefabricated

    Prefab components used columns,beams, hollow core floor slabs,staircases, wall panels (Acotechpanels)

    installation of precast column

  • 7/27/2019 1 RoadMap IBS

    66/83

    Industrialised Construction 67

    Architectural features bright faade,cascading roofs with large overhangs,internal pockets of large and smallcourtyards

    Installation of first floor slab on 02.05.03

    Installation of 3rd floor slab on 28.05.03

  • 7/27/2019 1 RoadMap IBS

    67/83

    Industrialised Construction 68

    fixing of wall panel

  • 7/27/2019 1 RoadMap IBS

    68/83

    Industrialised Construction 69

    Completion ofexternal wall on16.07.03

    installation of precast staircases

    NEW DESIGN FOR

  • 7/27/2019 1 RoadMap IBS

    69/83

    Industrialised Construction 70

    NEW DESIGN FORGOVERNMENT QUARTERS

    In 2001 new design alternativesfor all categories of governmentquarters were initiated

    application of modular coordination use of building components flexibility and creativity in design

    and the concept of sustainabledesign

    standardised components for

    interchangeability between designs

    Akademi Audit

  • 7/27/2019 1 RoadMap IBS

    70/83

    Industrialised Construction 71

    Krtrs kelas F & G load bearingdesign, precast wall, slab, column

    & beam

    Akademi AuditNegara, Nilai

    B l i P li

    S

  • 7/27/2019 1 RoadMap IBS

    71/83

    Industrialised Construction 72

    Balai Polis Senawang

    Kuaters Kelas FFrame system : cast-in-situcolumn & beam, precast infill

    wall & slab

    Kuaters Kelas G

    IBS PROJECTS

  • 7/27/2019 1 RoadMap IBS

    72/83

    Industrialised Construction 73

    IBS PROJECTS

    HOLLOWCORE SLABS; PRECASTCONCRETE COLUMNS & BEAMS

    25,500 m2, 3 FLOORS

    STRUCTURAL CONSTRUCTION: 4 MONTHS

  • 7/27/2019 1 RoadMap IBS

    73/83

    Industrialised Construction 74

    PENANG STATE GOVERNMENT

    IBS STRUCTURE: HOLLOWCORESLABS; PRECAST CONCRETE

    COLUMNS & BEAMS

    7,500 m2, 4 FLOORS

    STRUCTURAL CONSTRUCTION: 2

    MONTHS

    DEWAN MILENIUM, KEPALA BATAS

    INDOOR STADIUM, BALIK PULAU

  • 7/27/2019 1 RoadMap IBS

    74/83

    Industrialised Construction 75

    MAJLIS PERBANDARAN PPINANG

    IBS STRUCTURE:HOLLOWCORE SLABS;

    PRECAST CONCRETE

    COLUMNS, BEAMS &

    BLEACHERS

    6,000 m2, 3 FLOORS

    STRUCTURAL

    CONSTRUCTION: 2 MONTHS

    ,

    RESIDENTIAL & OFFICE

  • 7/27/2019 1 RoadMap IBS

    75/83

    Industrialised Construction 76

    IBS STRUCTURE: METAL

    FORMWORKS FOR WALLS,

    SLABS, BEAMS & COLUMNS

    TWO 26-30 STOREY TOWERS(APARTMENTS & OFFICES)

    STRUCTURAL

    CONSTRUCTION: 6 MONTHS

    NORTHAM CITY, PULAU PINANG

    IBS STRUCTURE: TEACHERS QUARTERS,

  • 7/27/2019 1 RoadMap IBS

    76/83

    Industrialised Construction 77

    IBS STRUCTURE:

    LIGHTWEIGHT BLOCKS &

    PRECAST CONCRETE WALLS;

    PRECAST CONCRETE SLABS

    10,000 UNITS, 4-5 STOREY

    109 LOCATIONS IN 9 STATES

    COMPLETION IN 3 YEARS

    TEACHERS QUARTERS,

    ALL OVER MALAYSIA

    AKADEMI BINAAN MALAYSIA,

  • 7/27/2019 1 RoadMap IBS

    77/83

    Industrialised Construction 78

    CIDB MALAYSIA

    IBS STRUCTURE: PRECAST

    CONCRETE SLABS, BEAMS,

    COLUMNS & WALLS 9,600 m2, 6 WORKSHOP

    BLOCKS

    STRUCTURAL

    CONSTRUCTION: 3 MONTHS

    SINTOK, KEDAH

    HOSPITAL SERDANG SELANGOR

  • 7/27/2019 1 RoadMap IBS

    78/83

    Industrialised Construction 79

    MINISTRY OF HEALTH

    620-BED HOSPITAL

    HYBRID IBS STRUCTURE OF

    STEEL FRAMES; PRECAST

    CONCRETE SLABS;

    LIGHTWEIGHT CONCRETE

    BLOCKS FOR WALLS

    130,000 m2, 9 FLOORS

    STRUCTURAL CONSTRUCTION:

    4 MONTHS

    HOSPITAL SERDANG, SELANGOR

    SHOPPING COMPLEX DAMANSARA

  • 7/27/2019 1 RoadMap IBS

    79/83

    Industrialised Construction 80

    IBS STRUCTURE: SOLID & HOLLOWCORE

    SLABS; PRECAST CONCRETE WALLS,

    STAIRCASES, GUTTERS, BEAMS & COLUMNS 121,000 m2, 4 FLOORS, 2 BASEMENTS

    STRUCTURAL CONSTRUCTION: 4 MONTHS

    SHOPPING COMPLEX, DAMANSARA

    RESIDENTIAL APARTMENTS,

    PUTRAJAYA

  • 7/27/2019 1 RoadMap IBS

    80/83

    Industrialised Construction 81

    IBS STRUCTURE: PRECAST

    CONCRETE SLABS, WALLS &

    STAIRCASES

    756 UNITS, 6 BLOCKS, 8-16FLOORS

    CONSTRUCTION: 18 MONTHS

    PUTRAJAYA

    Concl sion

  • 7/27/2019 1 RoadMap IBS

    81/83

    Industrialised Construction 82

    Conclusion

    IBS ROADMAP 2003-2010: Towardslabour reduction and better

    productivity, quality, safety &

    environment; reducing total industrycosts

    INCREASING THE CONSTRUCTION

    INDUSTRY COMPETITIVENESS

  • 7/27/2019 1 RoadMap IBS

    82/83

    Industrialised Construction83

    Thank You

  • 7/27/2019 1 RoadMap IBS

    83/83