1
Progress of the J-PARC
Shoji Nagamiya
Director, J-PARC Center at KEK/JAEA
July 6, 200750 GeV PAC
2
3 GeV
Linac
Materials & LifeExperimental Hall
NeutrinoTarget
Hadron Experimental Hall
3
Linac Tunnel
4
Klystron Area at the Linac
5
3 GeV Tunnel
6
3 GeV RF Acceleration
7
50 GeV Tunnel
8
Experimental Devices
Muon Experimental Area
Neutron Scattering Area
Materials & Life Experimental Facility
Neutron Beam Lines (23 total)
Neutron Beam Lines (23 total)
Target Station
ScatteredNeutrons
Proton Beam
Proton Beam
9
Early Days of Construction for MLF
10
Present View
11
Neutron Source
12
Muon Beam Production Area
13
Neutrino Beamline
Decay Volume Areain the Construction Days
Neutrino Target Area
14
Superconducting Magnet for Neutrino Line
15
Hadron Experimental Hall
16
Highlights duringthe Past One Year
17
Recent Highlights
Significant Progress in Accelerator Development– Injection and extraction of the first beam at the Linac.– Technical issues like RF cavities have almost been solved.
Construction: almost on schedule. Construction budget is reasonable. Two experimental halls (hadron, materials&life) were completed.
– Peak in the construction budget in JFY2006.– Creation of the operational budget at KEK by closing the KEK-PS from
JFY2006.
J-PARC Center started in February 2006. It was expanded significantly in April of 2007.
A big review by the Committee (appointed by the Government) was held from December of 2006 through June of 2007.
– Review items Organizational Structure at the Operational Stage (J-PARC Center) PAC, Beam-Time Fee Usage of Neutron Beam Lines by Industries Linac Energy Recovery, Phase 2 projects Operational Budget Internationalization of the J-PARC
– Nine meetings plus a site tour were held.– The report was published in June.
18
Linac Beam on January 24, 2007
19
Measurement of Beam Energy
DesignSpec.
Immediatelyafter SDTL1
After SDTL15
E (Measured after SDTL15)= 181.3MeV
Beam
Beam Monitors
Time-of-Flight (TOF)was measured.
Velocity and, thus, the energy was measured.
20
Recent Highlights
Significant Progress in Accelerator Development– Injection and extraction of the first beam at the Linac.– Technical issues like RF cavities have almost been solved.
Construction: almost on schedule. Construction budget is reasonable. Two experimental halls (hadron, materials&life) were completed.
– Peak in the construction budget in JFY2006.– Creation of the operational budget at KEK by closing the KEK-PS from
JFY2006.
J-PARC Center started in February 2006. It was expanded significantly in April of 2007.
A big review by the Committee (appointed by the Government) was held from December of 2006 through June of 2007.
– Review items Organizational Structure at the Operational Stage (J-PARC Center) PAC, Beam-Time Fee Usage of Neutron Beam Lines by Industries Linac Energy Recovery, Phase 2 projects Operational Budget Internationalization of the J-PARC
– Nine meetings plus a site tour were held.– The report was published in June.
21
Construction Budget
Now
Budget Profile
22
Construction Schedule
ConstructionStart Facility
Operation
23
Recent Highlights
Significant Progress in Accelerator Development– Injection and extraction of the first beam at the Linac.– Technical issues like RF cavities have almost been solved.
Construction: almost on schedule. Construction budget is reasonable. Two experimental halls (hadron, materials&life) were completed.
– Peak in the construction budget in JFY2006.– Creation of the operational budget at KEK by closing the KEK-PS from
JFY2006.
J-PARC Center started in February 2006. It was expanded significantly in April of 2007.
A big review by the Committee (appointed by the Government) was held from December of 2006 through June of 2007.
– Review items Organizational Structure at the Operational Stage (J-PARC Center) PAC, Beam-Time Fee Usage of Neutron Beam Lines by Industries Linac Energy Recovery, Phase 2 projects Operational Budget Internationalization of the J-PARC
– Nine meetings plus a site tour were held.– The report was published in June.
24
・・・
研究開発部門
量子ビーム応用研究部門
研究開発拠点
原子力科学研究所核燃料サイクル工学研究所
○○ 部門
KEK JAEA
陽子加速器施設開発ユニット
東海研究開発センター
管理部
中性子関連ユニット
J-PARC Center
東海キャンパス
大強度陽子加速器計画推進部
Division X
・・・
Organization under MOU
・・・
Section A
Section B
Division
A
素粒子原子核研究所物質構造科学研究所
加速器研究施設
共通基盤研究施設
J-PARC Center is ranked to the same level of other
institutions
J-PARC Center is one of 11 Major Units(At Tokai, One of Two Units)
Member: Representatives from both KEK and JAEA + Director of the J-PARC Center
KEKDirector General
JAEAPresident
Presentation of Important IssuesAgree
ment
Agreement AgreementJ-PARC Steering Committee
J-PARC Center & Two Organizations
25
J-PARC Center in February of 2006
J-PARC Center: To operate the entire J-PARC by one responsible organization.[Construction team: Two institutions carry full responsibilities for funded items.]
The first Agreement was signed on August 8, 2005.
A)
JAEA
Particle Nuclear
These groups started in
February, 2006(62 members)
S. Nagamiya
T. Miura
Y. Yamazaki
Y. Yamazaki
Y. Oyama
M. Takasaki
M. Murasawa
Y. Totsuka Y. Tonozuka
26
J-PARC Center in April of 2007
J-PARC Center: To operate the entire J-PARC by one responsible organization.[Construction team: Two institutions carry full responsibilities for funded items.]
The first Agreement was signed on August 8, 2005.
Organizationin JFY2007
S. Nagamiya
T. Miura
Y. Yamazaki
Y. Yamazaki
Y. Oyama
M. Takasaki
M. Murasawa
K. Nishikawa
Y. Ikeda
JAEA : 174
KEK : 170
Total Number :344
JAEA:76KEK: 33
JAEA: 0KEK: 78
JAEA:60KEK: 25
JAEA:11KEK: 19
JAEA:13KEK: 6A)
JAEA
Particle Nuclear
A. Suzuki T. Okazaki
27
Recent Highlights
Significant Progress in Accelerator Development– Injection and extraction of the first beam at the Linac.– Technical issues like RF cavities have almost been solved.
Construction: almost on schedule. Construction budget is reasonable. Two experimental halls (hadron, materials&life) were completed.
– Peak in the construction budget in JFY2006.– Creation of the operational budget at KEK by closing the KEK-PS from
JFY2006.
J-PARC Center started in February 2006. It was expanded significantly in April of 2007.
A big review by the Committee (appointed by the Government) was held from December of 2006 through June of 2007.
– Review items Organizational Structure at the Operational Stage (J-PARC Center) PAC, Beam-Time Fee Usage of Neutron Beam Lines by Industies Linac Energy Recovery, Phase 2 projects Operational Budget Internationalization of the J-PARC
– Nine meetings plus a site tour were held.– The report was published in June.
28
J-PARC PAC System and Beamtime Charge
PAC for Particle & Nuclear Proposals PAC for Materials & Life Proposals
Beamtime Charge
29
Linac Energy Recovery
The Committee recommended strongly to start the energy recovery immediately after the completion of Phase 1.
JFY2008 JFY2009 JFY2010 JFY2011 JFY2012 JFY2013
Phase 1Completion
30
Phase 2 Project
Phase 2 Items– Neutron equipments, Muon equipments, Hadron hall expansion, Energy boost
to 50 GeV.– The total cost of about 130-140 Oku Yen was discussed.– The committee is favorable to proceed into the Phase 2 by assigning an explicit
priority among the proposed items.– Priority setting must be done by the discussions among the communities.
The first discussions were held at the Users Consultative Committee on June 18.
– The nuclear transmutation: The review must be done at the Atomic Energy Commission in Japan.
A positive discussion was done at the Atomic Energy Commission meeting on July 3.
2 km Detector for T2K– The 2 km detector for T2K was not included in Phase 2 items in the present
review.– I recommend this detector be proposed (if the PAC supports it) to the
Government after the first data are taken by the present configuration of T2K.
31
Operational Cost of J-PARC
Total: 187 Oku Yen( Other personnel's: About 30 Oku Yen)
Outsourcing manpower 19 Oku
Electric Power & Water 70 Oku
Maintenance
53 Oku
Improvement
13 Oku
Building Maintenance8 Oku
Safety, Computer 12 Oku
Experiments11 Oku The Committee
understood the reason why this budget is needed. However, an effort to reduce the cost was also recommended.
200 day datataking
32
Budget Request for JFY2008
JFY2007 JFY2008 JFY2007 JFY2007Team→ MEXT→ FinalMEXT Financial Dept. Answer
(now) (August) (Dec)
Oku Yen[JAEA]
Phase 1 Construction 154.5 6.9 --- --- Linac Energy Recovery 0 19.0 --- ---Neutron Equipment 0 26.5 --- ---
Research Bldg., etc. 0 8.1 --- ---Operational 21.5 56.6 --- ---
[KEK] Construction (Equipment) 48.5 33.9 --- --- Construction (Civil Eng.) 40.6 28.3 --- --- Lodging, etc. --- 10.6 --- --- Operational (Expts Preparation) 43.0 39.3 --- --- Operational --- 39.0 --- ---Metal Price Compensation --- 11.2 --- ---
KEK Operational : Over 35 Oku Yen increased budget request as compared to JFY2007 + Metal Price compensation !
33
Hadron Experimental Hall
K0 and K1.1– Scientific evaluation is needed.– Desired scenario is shown on the next page.– Would like to encourage to have both of K0 an K1.1 beamlines, but we
have to wait for the budget status.– Close to 3 Oku Yen was requested next year. Obtaining an enough budget
for JFY2008 is particularly very difficult.
Phase 2 Project (expansion of the Hadron Hall as Phase 2)– 60m to 100 m. One production target to two production target, etc.– The cost would be about 59 Oku Yen. – Need input from PAC.– Would like to send a proposal for JFY2009, if this proposal is endorsed by
the communities and, at the same time, approved by many committees at the J-PARC, such as the J-PARC Council.
– Competition exists within Phase 2: Neutron, Muon. Other competition within the J-PARC: Neutrino 2 km.
Competition outside J-PARC: Many new projects are lined up.
34
Desired Scenario
35
Office Space, Lodging, New Gate, etc.
Office Space– NTT: Ibaraki Prefecture will purchase i
t. KEK (plus JAEA) will rent and/or purchase a part of the space. A few 100 can be accommodated.
– This area will be used for the Users Office.
New Lodging– 30 rooms with kitchens plus 16 room
s exist. We are negotiating with JAEA to be available to J-PARC.
– Hotel plan near the Tokai Station. Gate
– New Gate will be planned for the J-PARC.
36
Summary
News during the Past One Year– Construction for both equipments and facilities: A slight delay, but
almost on schedule. Peak in the construction budget in JFY2006。
– J-PARC Center started and expanded.– Shutdown of KEK-PS from JFY2006.
Review by the Governmental Committee on J-PARC– How to grow the organizational structure at the operational stage (J-
PARC Center)?– Realistic operational budget. – Installation of PAC within J-PARC, Free beamtime charge, etc.– Linac energy recovery has to be done. Phase 2 is encouraged.– Mechanisms for an easier industrial usage have to be introduced. – Internationalization of the J-PARC Project.
Hadron Hall– Timing of K0 and K1.1: Depends of the budget.– Phase 2 expansion: Evaluation will be needed at the next PAC.