Presented by :
22
PlanPlan
1. General principle of certification
2. Approach to tunisian airports certification
3. Management and supervision of the certification
process
33
Airport certification process
1- Main certification pattern
Development of the Airport
Manual
Regulatory framework
GDCA
Audit
Certificate Obtention
Correction of deficiencies
Management & supervision
Yes
No
44
Organisation Chart of the Office
de l’Aviation Civile et des AéroportsChairman &Executive
Officer (CEO)
Deputy Director General
Inspection and internal Audit Direction
Operating Head Department
Air Traffic Head Department
Development and Internal supervision
Head Department
Administrative and Financial Head
Department
Studies and Projects Head
Department
Operating Department
Tunis Carthage Int. Airport Djerba Zarzis Int. Airport
Sfax Tyhna Int. Airport Tozeur Nefta Int. Airport 7 Nov. Tabarka Int. Airport Gafsa Ksar Int. Airport
Borj El Amri Aerodrome
Monastir HB Int. Airport
55
2- Approach to the Certification of Tunisian 2- Approach to the Certification of Tunisian AirportsAirports
1. The regulatory framework of airport certification
2. The setting up of Committees in charge of the airports
certification follow up
3. The elaboration of the documentary system
4. Training and Awareness
5. Inspection and levelling up of infrastructures
66
6. The upgrading of Airports Operational Departments and the
concerned Directions
7. The Airport Manual development deadlines
8. The Airports blank Audits
9. The Airport certificate application
10.The Safety Management System Implementation
2- Approach to the Certification of Tunisian 2- Approach to the Certification of Tunisian Airports Airports (follows)(follows)
77
2.1- The tunisian regulatory framework2.1- The tunisian regulatory framework
Awaiting the elaboration of the tunisian regulation Awaiting the elaboration of the tunisian regulation
related to the operation conditions of airports that related to the operation conditions of airports that
are open to civil air traffic (project in stage of are open to civil air traffic (project in stage of
validation), it was agreed to adopt ICAO provisions validation), it was agreed to adopt ICAO provisions
in force. in force.
88
Annex 14 (Standard 1.4.5 )
As part of the certification process, states are required to develop an
Airport Manual , containing all the useful information on the airport
location, facilities, services, equipments, operating procedures,
organisation and management and comprising a Safety Management
System; to be submitted by the applicant for approval or acceptance
prior to the airport certificate delivery.
Reference Documents(1/2)
2.1- The Tunisian regulatory framework2.1- The Tunisian regulatory framework
99
The Manual on Airport
Certification (Doc9774) provides
detailed guidelines on the
content of an Airport Manual that
can be used as a reference for
the development of this
document.
Reference Documents(2/2)
1010
2.2- the setting up of certification
follow up committees For the implementation process of tunisian airports certification, the OACA
proceeded to the setting up of the four following committees :
Superior committee for the airport certification follow upSuperior committee for the airport certification follow up
Central Committee for airport certification coordinationCentral Committee for airport certification coordination
Local Committee for the implementation of airport certification action Local Committee for the implementation of airport certification action
plansplans
Committee for the examination and validation of the documentary
system
1111
2.2.1 - : Superior committee for the airport Superior committee for the airport certification follow upcertification follow up
Main attributions
Approval of action plans proposed by the Airports Operating
Department (DEA) for airport certification
Coordination with tutor (Ministry of transport) for the
establishment of the procedures to implement in the framework
of airport certification
Establishment of the main objectives of the safety management
system related to airport operation
(General Direction level)
1212
2.2.2 - Central Committee for airport certification Central Committee for airport certification coordinationcoordination
Main attributions :
Realize the follow up of the action plan related to airport
certification
Follow up the development of airport manuals
Establish a Safety Management system (SMS) in the airport
operation field
Follow up the recommendations implementation resulting from
the diagnosis and the internal audits carried out in the
framework of airports certification
(General Direction level)
1313
2.2.3 - Local Committee for the implementation of Local Committee for the implementation of airport certification action plansairport certification action plans
:Main attributions :
Development of the Airport Manual
Implementation of the local action plan related to airport
certification
Advise the central coordination committee for airport
certification
Ensure the implementation of provisions and
recommendations of the superior and central committees
(airports level)
1414
2.2.4- the Committee for the examination and validation of the documentary system :
Main attributions :
Reading and validation of the different document drafts
Respect of the reference regulatory and technical framework
Elaboration of a charter and a procedure for the documentary
system management and follow up.
(on the Airports Operating Department level)
1515
The Airport Manual is an integral part of the certification process. It
comprises 5 parts :
1st PartGeneral
provisions
3rd PartPrecisions on
The airport to communicateto aeronautical
information service
2nd PartInformation on The airport site
4th PartOperating procedures And safety measures
5th PartDescription of the
Airport SMS
2.3- The development of a documentary2.3- The development of a documentarysystemsystem
1616
1st part: 1st part: General provisionsGeneral provisions The conditions applied the airport, the operator obligations and informations on the airport
administration
Except for the indented section (d) of this part related Except for the indented section (d) of this part related
to the existing procedures of AIS publication, the other to the existing procedures of AIS publication, the other
required provisions refer to the national regulation being required provisions refer to the national regulation being
currently developedcurrently developed. .
2.3- The development of a documentary system2.3- The development of a documentary system
1717
2nd part: 2nd part: IInformation on the airport sitenformation on the airport siteThe airport plan indicating main operating facilities inside The airport plan indicating main operating facilities inside
and outside the airport perimeterand outside the airport perimeterThe airport plan with boundary indicationsThe airport plan with boundary indications
The informations required in this section do exist on the The informations required in this section do exist on the
airport level and should be updated and formated in airport level and should be updated and formated in
conformity with the Airport Manualconformity with the Airport Manual
2.3- 2.3- The development of a documentary systemThe development of a documentary system
1818
3rd part:3rd part: Precisions on the airport to communicate to the Precisions on the airport to communicate to the Aeronautical Information ServicesAeronautical Information Services
The airport physical characteristics (runways, Twy, etc.)The airport physical characteristics (runways, Twy, etc.) Visual and radio electrical aidsVisual and radio electrical aids Geographical data on each aircraft stand ; runway threshold, etc.Geographical data on each aircraft stand ; runway threshold, etc. type of pavement and classification number PCN type of pavement and classification number PCN Declared distances Declared distances Plan for the removal of accidentally damaged aircraft Plan for the removal of accidentally damaged aircraft
Safety and firefighting categorySafety and firefighting category
The information requested in this section is on the AIP of
Tunisia except for the plan on the removal of accidentally
damaged aircraft.
2.3- 2.3- The development of a documentary systemThe development of a documentary system
1919
4th part: 4th part: Operating procedures and safety measuresOperating procedures and safety measures 2.3- 2.3- The development of a documentary systemThe development of a documentary system
•Movement area access procedures, emergency planning and simulation exercises
•Third parties operating on the airport and their respective roles in emergency situations
•Information on the facilities, equipments, staff and procedures set up to cope with the requirements of Rescue and Fire Fighting
•Infrastructure maintenance and upkeeping procedures (runways, Twy, etc.)
•Lighting and visual aids maintenance and upkeeping procedures
•Procedures for the realization of works on the movement area
•Procedures for Ramp Safety and Management
•Management of wildlife hazard
•Obstacle control and protection of Navaids locations
• removal of accidentally damaged aircraft
• Handling of Dangerous Goods
•Protection in low visibility
2020
This phase represents the most important section of the Airport Manual. It This phase represents the most important section of the Airport Manual. It
consists in developing and standardizing the operating procedures of the consists in developing and standardizing the operating procedures of the
different airport services and establishing inter-units agreements between different airport services and establishing inter-units agreements between
airports and the technical departments concerned.airports and the technical departments concerned.
For the development of procedures and agreements, the Head Departments are For the development of procedures and agreements, the Head Departments are
in charge of the collection of local procedures at the airports level, and their in charge of the collection of local procedures at the airports level, and their
standardization in conformity with the regulatory provisions in force.standardization in conformity with the regulatory provisions in force.
4th part: 4th part: Operating procedures and safety measuresOperating procedures and safety measures 2.3- 2.3- The development of a documentary systemThe development of a documentary system
2121
2.3.1- Drafted Documents2.3.1- Drafted Documents Manoeuvring Areas Operating ManualManoeuvring Areas Operating Manual Protection Procedures against Engine BlastsProtection Procedures against Engine Blasts Preventive measures in Aircraft Fuelling Operations Preventive measures in Aircraft Fuelling Operations precisions on the provisions applied to traffic (comprising speed limits and means precisions on the provisions applied to traffic (comprising speed limits and means
of regulation enforcement );of regulation enforcement ); Procedures for the delivery of driving licences for the traffic of vehicles on the Procedures for the delivery of driving licences for the traffic of vehicles on the
Movement AreaMovement Area Operating Procedures in Low VisibilityOperating Procedures in Low Visibility Arrangements for the enforcement control of Safety measures to be respected by Arrangements for the enforcement control of Safety measures to be respected by
ramp personnel ramp personnel Manual on the maintenance procedures of CNS systemsManual on the maintenance procedures of CNS systems Manual on the maintenance procedures of electrical systemsManual on the maintenance procedures of electrical systems Training Manual for the Visual aids maintenance personnelTraining Manual for the Visual aids maintenance personnel Training Manual for the electrical systems maintenance personnelTraining Manual for the electrical systems maintenance personnel
2.3- 2.3- The development of a documentary systemThe development of a documentary system
2222
2.3.2- Documents under approval2.3.2- Documents under approval2.3- 2.3- The development of a documentary systemThe development of a documentary system
8 Ramp Operations Manuals concerning the 8 Ramp Operations Manuals concerning the
different airports.different airports.
2323
2.3.3- Documents under examination2.3.3- Documents under examination2.3- 2.3- The development of a documentary systemThe development of a documentary system
Manual on procedures of Ramp Management Service Manual on procedures of Ramp Management Service The Ramp Controller Training ManualThe Ramp Controller Training Manual Letter of agreement between the Ramp Management Letter of agreement between the Ramp Management
Unit and the TWR Unit and the TWR Letter of agreement between the Ramp Management Letter of agreement between the Ramp Management
Unit and the Infrastructure Maintenance UnitUnit and the Infrastructure Maintenance Unit Letter of agreement between the Ramp Management Letter of agreement between the Ramp Management
Unit and the Briefing OfficeUnit and the Briefing Office Letter of agreement between the Ramp Management Letter of agreement between the Ramp Management
Unit and the Safety Rescue & Firefighting ServiceUnit and the Safety Rescue & Firefighting Service Letter of agreement between theTWR and the Safety Letter of agreement between theTWR and the Safety
Rescue & Firefighting ServiceRescue & Firefighting Service
2424
2.3.4- Documents under development (1/2)2.3.4- Documents under development (1/2)2.3- 2.3- The development of a documentary systemThe development of a documentary system
Manuel on Ramp Congestion ManagementManuel on Ramp Congestion Management Reporting Procedures of Ramp Incidents & Accidents Reporting Procedures of Ramp Incidents & Accidents Procedures of protection and protection of Navaids locationsProcedures of protection and protection of Navaids locations Training Manual of the Infrastructure lnspection UnitTraining Manual of the Infrastructure lnspection Unit Procedures Manual for the Obstacle Clearance UnitProcedures Manual for the Obstacle Clearance Unit Training Manual of the of the Obstacle Clearance service in Training Manual of the of the Obstacle Clearance service in
the Operating Departmentthe Operating Department Training Manual of the Obstacle Clearance units on the Training Manual of the Obstacle Clearance units on the
airports levelairports level Manual on the procedures of the Navaids inspection and Manual on the procedures of the Navaids inspection and
maintenance servicemaintenance service
2525
2.3.4- Documents under development(2/2)2.3.4- Documents under development(2/2)2.3- 2.3- The development of a documentary systemThe development of a documentary system
Training Manual of the Safety Rescue and Firefighting ( SRFF) Service Training Manual of the Safety Rescue and Firefighting ( SRFF) Service The Airport Emergency Plan The Airport Emergency Plan Regulation and procedures against Bird Strike and Wildlife Hazard Regulation and procedures against Bird Strike and Wildlife Hazard Training Manual of the Bird Strike and Wildlife Hazard personnelTraining Manual of the Bird Strike and Wildlife Hazard personnel Procedures Manual of the SRFF service Procedures Manual of the SRFF service Safety Procedures for the handling and storage of dangerous materials Safety Procedures for the handling and storage of dangerous materials
in the airport in the airport Letter of agreement between the TWR and the Bird Strike and Wildlife Letter of agreement between the TWR and the Bird Strike and Wildlife
Hazard Unit Hazard Unit Letter of agreement between the Obstacle Clearance Unit and the Letter of agreement between the Obstacle Clearance Unit and the
Operating DepartmentOperating Department Letter of agreement between the TWR and the Obstacle Clearance Unit Letter of agreement between the TWR and the Obstacle Clearance Unit Letter of agreement between the TWR and the Navaids Inspection and Letter of agreement between the TWR and the Navaids Inspection and
Maintenance UnitMaintenance Unit
2626
5th part : 5th part : Description of the Airport SMSDescription of the Airport SMS
Will be implemented following the development of the regulatory provisions related to airports SMS
2.3- 2.3- The development of a documentary systemThe development of a documentary system
The Safety Policy and the Safety Management process
2727
2.4-. Training and Awareness (1/3)2.4-. Training and Awareness (1/3)Proficiency of the operation and maintenance personnelProficiency of the operation and maintenance personnel
The airport operator should employ skilled and proficient personnel, in The airport operator should employ skilled and proficient personnel, in
adequate number, to carry out critical tasks related to the airport operation and adequate number, to carry out critical tasks related to the airport operation and
maintenancemaintenance
A programme for the continuous development of proficiencies should be A programme for the continuous development of proficiencies should be
implemented for this purpose .implemented for this purpose .
Define the personnel recruitment skills and conditions in the different airport Define the personnel recruitment skills and conditions in the different airport
services services
2828
2.4-. Training and Awareness (2/3)2.4-. Training and Awareness (2/3)
Participation of senior airport managers in national and Participation of senior airport managers in national and international seminars on airport certification and Safety international seminars on airport certification and Safety Management Systems. Management Systems.
Organisation of workshops on the central level gathering the Organisation of workshops on the central level gathering the different airport responsibles to heighten their awareness on different airport responsibles to heighten their awareness on the issue and answer their questions .the issue and answer their questions .
Organisation of tours in the airports to make all the airport Organisation of tours in the airports to make all the airport interveners sensitive to the certification importance.interveners sensitive to the certification importance.
2.4.1- Awareness : 2.4.1- Awareness : (Awareness campaigns on the importance of (Awareness campaigns on the importance of certification and for the development of a safety culture)certification and for the development of a safety culture)
2929
2.4-. Training and Awareness (3/3)2.4-. Training and Awareness (3/3)
Training sessions and seminars for the technical personnelTraining sessions and seminars for the technical personnel
2.4.2- Training 2.4.2- Training At the local level
Assistance in the development of a documentary system by Assistance in the development of a documentary system by
third parties.third parties.
Foster cooperation and assistance with airports and foreign Foster cooperation and assistance with airports and foreign
enterprises in order to learn from their experiences and know-enterprises in order to learn from their experiences and know-
how in the certification field.how in the certification field.
On the cooperation and assistance level
3030
2.5-. Airports Inspection 2.5-. Airports Inspection
It consists of carrying out assessment and It consists of carrying out assessment and diagnosis operations of the facilities and diagnosis operations of the facilities and equipments, and notably to inspect:equipments, and notably to inspect:
Infrastructures (runways, taxiway and aircraft Infrastructures (runways, taxiway and aircraft stands) and ACN / PCN calculation stands) and ACN / PCN calculation
Electrical equipments and airport facilities Electrical equipments and airport facilities
A fund will be reserved for the upgrading of A fund will be reserved for the upgrading of
equipments and facilitiesequipments and facilities
3131
2.6-. The upgrading of the airports operational 2.6-. The upgrading of the airports operational units and the concerned Departmentsunits and the concerned Departments
The provisions related to airport certification require that airport services are
in charge of a number of roles and agreements , that are not currently
ensured.
The conformity to these requirements impose the reorganisation of some
units on the airports level as well as for some Departments.
The proposals related to the upgrading of these units will be developed
following the approval of the newly defined working procedures.
3232
2.7-. The Airport manuals development deadlines2.7-. The Airport manuals development deadlines
The certification process will be carried out in two phases :The certification process will be carried out in two phases :
- Phase 1 : - Phase 1 : Concerns small airports : Concerns small airports : (deadline june 2007)(deadline june 2007)
Tabarka 7 November,Tabarka 7 November, Tozeur-Nefta,Tozeur-Nefta,
Sfax Thyna,Sfax Thyna, Gafsa Ksar.Gafsa Ksar.
Borj el amriBorj el amri
- Phase 2 : - Phase 2 : Concerns bigger airports : Concerns bigger airports : (deadline december 2007)(deadline december 2007)
Tunis Carthage,Tunis Carthage,
Monastir H.B.,Monastir H.B.,
Djerba Zarzis.Djerba Zarzis.
3333
In order to ensure the efficiency of the actions In order to ensure the efficiency of the actions
that have been undertaken for certification, blank that have been undertaken for certification, blank
audits will be scheduled for all the airports prior to audits will be scheduled for all the airports prior to
the the airportsairports certification application certification application ..
2.8-. Airports blank Audits 2.8-. Airports blank Audits
3434
2.9-. Application for airport certification2.9-. Application for airport certification
An airport certification application will be submitted by the Office
de l’Aviation Civile et des Aéroports (OACA) to the General
Direction of Civil Aviation (GDCA) for each airport in conformity to
the format indicated in the regulation in force . The airport
manual, developed by the concerned airport, is an integral part
of the application .
3535
2.10-.SMS Implementation2.10-.SMS Implementation
ICAO provisions in this section, recommend that a certified airport should implement a safety
management system. To this end , OACA has developed a planning for an SMS
implementation comprising notably :
A safety management plan ;
Procedures on data exchange in safety and operating matters ;
Mechanisms to follow for hazard prevention and continuous supervision of the safety
level ;
An implementation plan of this programme will be developed during the 1st term of 2007.
3636
3-.Management and Supervision of the3-.Management and Supervision of theCertification ProcessCertification Process
The Management and supervision of the The Management and supervision of the
Certification approach at level of OACA require : Certification approach at level of OACA require :
An appropriate organisationAn appropriate organisation
An efficient data exchangeAn efficient data exchange
3737
The setting up of a steering committee for the certification process,
the role of which is to :
Follow up the development of the manuals
Coordinate information exchange between the airports and the concerned
Departments
Provide the airports and the concerned Departments with the documents
related to the Airport Manuals development
The reading and validation of the different Procedures Manuals developed
for this purpose
3.1- An appropriate organisation:
3838
►Garantee an instant data exchange between the different interveners
►Ensure considerable gains in time, energy, sheet and ink consumption
►The development of a secured website reserved for the works of airport
manuals development, endowed with sub-spaces for each airport and
concerned department ;
►Enlargement and effective use of the CPS system (intra-net) to all the
interveners
3.2- An efficient Data Exchange
3939
Tunis
Carthage
DENAOperatig
Department
Espace géré par l’AI7NT
Space operated by DENA
Space operated By TCIA
Space operated By DEA
Réseau inter aéroports
7Nov
TabarkaSpace operated
by 7NTIA
Inter Airports Network
Website
Head Departments
Airports
4040
ConclusionConclusion
The civil airport certification process is The civil airport certification process is a heavy operationa heavy operation, ,
requiring requiring stringent implicationstringent implication, at all levels, of all the , at all levels, of all the
interveners on the airport platform .interveners on the airport platform .
The warranty for the application and respect of the national and The warranty for the application and respect of the national and
international regulatory provisions in matters of airport international regulatory provisions in matters of airport
certification requires a certification requires a collective awarenesscollective awareness, notably in matters , notably in matters
of of coordinationcoordination, which remains the main condition for the , which remains the main condition for the
success of the whole process.success of the whole process.