1 Power plant investments under uncertainty: Case studies and pricing models Stein-Erik Fleten...
-
Upload
emilio-hayes -
Category
Documents
-
view
216 -
download
0
Transcript of 1 Power plant investments under uncertainty: Case studies and pricing models Stein-Erik Fleten...
1
Power plant investments under uncertainty: Case studies and pricing models
Stein-Erik Fleten
Norwegian University of Science and Technology (NTNU)
Trondheim, Norway
2
Overview
• A wind power case• Empirical analysis on spark spread• Gas fired power plants
– and CO2 capture
• Empircial analysis on electricity prices• Renewables in Norway
– If time: small hydropower, new transmission cables, ...
3
Economic Analysis of a License to Build a Wind Power Farm
Stein-Erik Fleten, NTNUKim Krossøy, NTNU -> D&F Group Bernhard Kvaal, TrønderEnergiPer-Christian Lysaker Torgersrud, NTNU ->
Statistics Norway
Fleten, Economic Analysis of a License to Build a Wind Power Farm
4
Economic Analysis of a License to Build a Wind Power Farm
– Uncertain electricity prices
– Net present value of the farm varies with electricity prices
– A license is right, but not an obligation, to invest before the license expires
Fleten, Economic Analysis of a License to Build a Wind Power Farm
5
Before the license expires
Invest• Receive cash flows
Wait• Get more information (downside protection)
• Save interest on investment cost
6
Electricity prices
• Higher in winter– also true for wind speeds
• What is the expected future electricity prices received for selling windpower during the lifetime of the wind farm?– long term price level is uncertain, so profitability is uncertain
– short term prices even more uncertain, but do not influence windfarm profitability!
Movie
100
140
180
220
260
1 7 13 19 25 31 37 43 49
Week
[NO
K/M
Wh]
1,0
1,5
2,0
2,5
3,0
%
Average local el. price 1996-2003
Share of annual generation
7
Long-term electricity prices(forward prices Sept. 2003)
200
210
220
230
240
250
260
270
0 2 4 6 8 10
Ye ars
Pri
ce [
NO
K/M
Wh]
dS dt dz S0 = 216 NOK/MWh
Yearly growth = 4.4 NOK/MWh
Standard deviation parameter = 10.1 NOK/MWh
8
Project data
• Bessakerfjellet windpower farm, TrønderEnergi, 50 MW• Average wind speed of 8.44 m/s • Green certificate price 150 NOK/MWh • Cost of capital r = 8%
– not adjusted for price risk!
• Investment cost 8 million NOK/MW, I = 400 million NOK• Lifetime 20 years• OM cost 47.5 NOK/MWh • Taxes, balancing cost, compensation to property owner etc.
9
Net present value
Green cert. price NOK/MWh
-300
-200
-100
0
100
200
300
200 250 300
Long term el. price
NP
V,
mil
l. N
OK 0
50
100
150
200
250
Base case NPV: 40 million NOK
10
rFdt E dF
212 ''( ) '( ) '( )dF F S F S dt F S dz
212 ''( ) '( ) ( ) 0F S F S rF S
1 21 2( ) S SF S A e A e
2 212 0r
11( ) SF S A e
F(S*) = V(S*) – I 1 *
1 *SA e aS b 1 1 1*
1( , *) ( * )S S SF S S A e e aS b I e
1
1 ( )*
b IS
a
11
Value of license
-20
0
20
40
60
80
100
120
140
170 220 270
Long-term electricity price [NOK/MWh]
Val
ue
[mill
ion
NO
K]
V(S) - I
F(S)
Base case S* = 247 NOK/MWh
12
Discussion
• Have assumed license does not expire• Learning effect not accounted for
• Conclusion: Wait for better prices!– Lognormal model gives same conclusion
13
Gas fired power plants
• Investment timing, operating flexibility and abandonment– joint work with E. Näsäkkälä, HUT
– available: http://www.sal.hut.fi/Personnel/Homepages/ErkkaN/thesis/
14
Introduction• A firm holds a license, i.e. an option, to build a gas fired
power plant• The cash flows from the plant depend on the spark spread
– Defined as the difference between the unit price of electricity and cost of gas
• Electricity is produced when the spark spread exceeds emission costs– Otherwise, if it is a peak plant, the plant is ramped down and held idle
• The plant can be abandoned – The salvage value of the plant is realized
• We compute – The value of the plant
– Entry and exit thresholds for the spark spread
– The value of installing CO2 capture technology eliminating emission costs
15
The spark spread
• We consider a two-factor model for the spark spread
• Two-factor model (see e.g. Schwartz and Smith, 2000)
( ) ( ) ( )S t t t ( ) ( ) ( )d t t dt dB t ( ) ( )d t dt dB t
• The changes in spark spread are normally distributed– the spark spread can be either negative or positive
• Spark spread is mean reverting and also has long-term uncertainty
16
Modelling spark spread• Usually as two separate processes: Realistic but complex
• Here the spread is modelled directly
• Simpler – one indicator of profitability
• The variance of the spark spread is not necessarily realistic at all combinations of electricity and gas prices
– with direct modelling of the spread it is difficult to capture the true dynamics if electricity and gas follow two distinct, nonintegrated processes
17
Present value of gas plant
• Solid lines: using the two-factor model presented
• Dashed lines: using separate models for electricity and gas
• Present value as a function of short- and long term volatility
18
Norwegian cont. shelf pipeline network
- there is also British network, etc.
Norwegian cont. shelf pipeline network
- there is also British network, etc.
19
Data
• Nord Pool electricity– Nearest 1-month forward and
year contracts 2-3 years ahead
• IPE gas – Nearest 1-month forward and
year contracts 3 years ahead
20
Data
• Spark spread, electricity – KH·gas
• Electricity: annual pattern• Gas: annual pattern• Spark spread: no
seasonal pattern
21
Spark spread estimation
• Kalman filter• Long-term drift estimated
from long-term forwards 30.1.2004
• Current (Jan.04) and chosen so that forward curve is matched
• Grey: Estimated time series
• Black: Estimated time series
Parameter 0 0
UnitNOK/ MWh
NOK/ MWh
NOK/ MWh
NOK/ MWh
NOK/ MWh
Value2.6
2.18-0.21
382.2 47.8 62.3 52.9
22
Value of a base load plant
• The present value of expected operating cash flows
( )
( ) ( )
( , ) ( ) |
( ) ( ) ( )
Tr s t
L t
t
Tr s t s t
t
V e C E S s F E G ds
e C e t t E s t G ds
• where E is emission costs and G is fixed cost of running the plant
23
Value of a peak load plant• The gas plant at time t can be replicated with t-maturity
European call options with strike price equal to the emission costs E
• As the changes in the spark spread are normally distributed, finding the value is straightforward by integration
24
Only long-term prices relevant• When long-term commodity projects are valued, models
with constant convenience yield give practically the same investment decision results as models using stochastic convenience yield (see e.g. Schwartz, 1998)
• Thus we assume investment decisions are made on the basis of equilibrium prices only
• Option to invest, (to shut down temporarily), to abandon– values and trigger levels found simultaneously
25
Application• Norwegian authorities have given three licenses to build gas
fired power plant– The costs of building and running a combined cycle gas plant in Norway are
estimated by Undrum, Bolland, Aarebrot (2000) for a 415 MW plant
Parameter
W C G I D
Unit MNOK/year MMwh/year MNOK/year MNOK MNOK
Value 2.5 3.27 50 1620 570
Inv. cost probably too low, closer to 2000Inv. cost probably too low, closer to 2000
26
Values and decisions
• Building threshold H
– No abandonment:
[46.3; 165.3] NOK/MWh.– Abandonment included: [43.8;
134.3] NOK/MWh, • Abandonment threshold:
[-362.8; -131.6] NOK/MWh
• DCF investment threshold: [-178.2; 8.7] NOK/MWh
27
Discussion • It is not optimal to exercise the option to build a base load
gas fired power plant– Regardless, the reality may be different
• 2004 data, base load 800 MW: NPV for building now 0. Value of investment opportunity = value of waiting 2800 mill NOK (not considering expiry of the license)
• Naturkraft sept. 2004: “We’re building!”• There are several possible explanations why our results
differ from the apparent policies of the actual investors – License expires (but not from society point of view)– The preemptive effect of early investment gives the license holders an
incentive to build the plant (see e.g. Smets, 1991) – We have used the UK market as a reference for gas– There is also a tax issue that has not been considered
28
29
Power plant with CO2-capture
Oth
er
exhaust
Oth
er
exhaust
? other use? other use
ExhaustExhaust
Steam Steam ElectricityElectricity CO2CO2 T
ransp
ort
Tra
nsp
ort
Natu
ral gas
Natu
ral gas
SeparationSeparation CompressionCompression
Ele
ctri
city
Ele
ctri
city
S
team
S
team
Storage EOR
Quotas• Kyoto agreement• National measures• Investment 2630 mill
NOK
30
The value of CO2 capture
technology (million NOK)Plant value based on linear forward price paths on electricity and gas
Deterministic cash flow
Market value based on real options. Gas volatility resp. 25%, 30%, 35%
Alt 1 "Base Case" 892 2 769 3 199 3 628
Alt 2 CO2-quotas 200 NOK -2 021 1 800 2 278 2 758 Alt 3: With CO2 capture plant
-516 2 217 2 687 3 155
Alt 3b: Capture plant+ sale for EOR 50 NOK/ton CO2
211 2 497 2 950 3 401
Compare numbers with gas plant investment cost 2000, plus CO2 capture plant of additional 2000 - 3000Compare numbers with gas plant investment cost 2000, plus CO2 capture plant of additional 2000 - 3000
31
Empirical analysis of electricity prices
• For the purpose of valuing long-term generation assets• Same two-factor model as before, but log-based and
with seasonality added:
32
Kalman filter results
33
Forward curve estimate
34
Other price modelling efforts
• Long-term electricity forward prices– how to combine long-term info on supply and demand with high-
resolution info on e.g. fuel prices
– Joint work with Martin Povh
• Short-term electricity spot prices– For bidding, short term generation planning etc
– Considering ARFIMA, GARCH etc.
– Joint work with Trine K. Kristoffersen
35
Alternative to new domestic power capacity: transmission cables• Statnett: ”NSI is (social-) economically profitable”
– Norsk Hydro agreed– Statistics Norway, Elkem: ”Not profitable”
• NPV= -I + capacity*discounted sum of exp. price difference Norway-UK
– depends on variations in price level, interest rates and exchange rates
• Decision rules – NPV >= 0– NPV – value of waiting >= 0
• What about NorNed? 700 MW, I = 2600 million NOK, NPV = 2000 mill NOK
– not a word about option value, value of waiting for better information etc. in the reports!
36
Conclusion
• Investment under power price uncertainty: There is value to waiting – Can explain slow investment behavior– not a form of market failure in itself
37
Small hydropower case
• Rivedal power plant at Dalsfjorden in Sogn og Fjordane county
• Under construction fall 2004~3,5 MW installed capacity
38
39
External economic conditions
• No green certificates– start of construction Sept. 2003
• Most important inputs:- Nominal interest rate 6,25 % (long term loan)
- 10-year forward 245 kr/MWh
40
Two alternatives
• Under construction:- max. usable flow: 1,9 m3/s- ductile cast-iron pipe, diameter: 0,7 m- Pelton turbine- Investment: 18,4 mill NOK
• Our alternative:- max. usable flow: 2,3 m3/s- fibre glass pipe, diameter: 0,95 m- Pelton turbine- Investment: 21,1 mill NOK
41
Principal solution
42
Stochastic price model
• Geometric Brownian Motion• dS = Sdt + σSdz
• : drift in long-term prices (forwards)
• σ: volatility in long-term prices
• Base case:
- = 1 %
- σ = 5 % (should perhaps be larger)
43
Current equilibrium price: 231,7 NOK/MWh
Changing volatilityInputs Base-case 0.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%r 6.25% 6.25% 6.25% 6.25% 6.25% 6.25% 6.25%σ 1.00% 2.50% 5.00% 7.50% 10.00% 12.50% 15.00%Results no soln.Sl 117.3 139.5 147.7 157.8 169.1 181.4 194.7Sh 157.4 157.1 155.8 153.7 150.5 145.5 135.7Ss 157.5 157.9 159.1 161.1 163.6 166.8 165.1S* 121.8 144.8 153.3 163.8 175.5 188.3 202.1
44
Changing drift parameterInputs Base-case 0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00%r 6.25% 6.25% 6.25% 6.25% 6.25% 6.25% 6.25% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%ResulaterSl 131.3 147.7 177.1 228.0 326.5 584.3 2909.8Sh 156.8 155.8 161.2 158.3 157.9 157.8 157.7Ss 158.1 159.1 155.0 156.7 157.0 157.2 157.2S* 136.3 153.3 183.9 236.8 338.9 606.6 3021.1Eqm price 245.0 231.7 219.0 206.9 195.2 184.1 173.4
45
Results
• Base case: - no value of waiting (”deep in the money”)- also for volatility of 10 %
• Option has no value before at least 3% drift
• The project Rivedal is robustly profitable • Should have been built larger