1 Power Commander 1 USB Cable FUEL AND IGNITION 1 ...

6
17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 1 FIG. FIG. FIG. PARTS LIST 1 Power Commander 1 USB Cable 1 Installation Guide 2 Power Commander Decals 2 Dynojet Decals 2 Velcro strips 1 Alcohol swab 3 Zip-ties THE LATEST POWER COMMANDER SOFTWARE AND MAP FILES CAN BE DOWNLOADED FROM OUR WEB SITE AT: www.powercommander.com 2008-2019 Kawasaki Brute Force 750 Installation Instructions PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION THE IGNITION MUST BE TURNED OFF BEFORE INSTALLATION! 2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com FUEL AND IGNITION

Transcript of 1 Power Commander 1 USB Cable FUEL AND IGNITION 1 ...

17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 1

FIG.

FIG.

FIG.

PARTS LIST

1 PowerCommander1 USBCable1 InstallationGuide2 PowerCommanderDecals2 DynojetDecals2 Velcrostrips1 Alcoholswab3 Zip-ties

THE LATEST POWER COMMANDER SOFTWARE AND MAP FILES CAN BE

DOWNLOADED FROM OUR WEB SITE AT:www.powercommander.com

2008-2019 Kawasaki Brute Force 750

I ns ta l l a t i on I ns t ruc t i ons

PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION

THE IGNITION MUST BE TURNED OFF BEFORE INSTALLATION!

2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com

FUEL AND IGNITION

17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 2

FIG.

FIG.

FIG.

EXPANSION PORTS 1 & 2

OptionalAccessoriessuchasPOD-300unitorAuto-tunekit.

POWER COMMANDER V INPUT ACCESSORY GUIDE

Map - (Input1or2)ThePCVhastheabilitytohold2differentbasemaps.YoucanswitchontheflybetweenthesetwobasemapswhenyouhookupaswitchtotheMAPinputs.Youcanuseanyopen/closetypeswitch.Thepolarityofthewiresisnotimportant.WhenusingtheAutotunekitonepositionwillholdabasemapandtheotherpositionwillletyouactivatethelearningmode.Whentheswitchis“CLOSED”Autotunewillbeactivated.(SettoSwitchInput#1bydefault.)

Shifter- (Input1or2)TheseinputsareforusewiththeDynojetquickshifter.InsertthewiresfromtheDynojetquickshifterintotheSHIFTERinputs.Thepolarityofthewiresisnotimportant.(SettoSwitchInput#2bydefault.)

Speed- Ifyourapplicationhasaspeedsensorthenyoucantapintothesignalsideofthesensorandrunawireintothisinput.ThiswillallowyoutocalculategearpositionintheControlCenterSoftware.Oncegearpositionissetupyoucanalteryourmapbasedongearpositionandsetupgeardependentkilltimeswhenusingaquickshifter.

Analog- Thisinputisfora0-5vsignalsuchasenginetemp,boost,etc.Oncethisinputisestablishedyoucanalteryourfuelcurvebasedonthisinputinthecontrolcentersoftware.

Crank- DoNOTconnectanythingtothisportunlessinstructedtodosobyDynojet.Itisusedtotransfercranktriggerdatafromonemoduletoanother.

ACCESSORY INPUTS

Wire connections:

ToinputwiresintothePCVfirstremovetherubberplugonthebacksideoftheunitandloosenthescrewforthecorrespondinginput.Usinga22-24gaugewirestripabout10mmfromitsend.PushthewireintotheholeofthePCVuntilisstopsandthentightenthescrew.Makesuretoreinstalltherubberplug.

NOTE:Ifyoutinthewireswithsolderitwillmakeinsertingthemeasier.

CRANK

ANALOG

SPEED

INPUT 1 (Grnd)

INPUT 1

INPUT 2 (Grnd)

INPUT 2

USB CONNECTION

17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 3

FIG.

FIG.

1 Removetheseat.Removetherighthandsidecover,andthecoverinfrontofthesteeringstemthatholdstheaccessoryoutlet(Fig.A).

The shifter knob and key switch will need to be removed to pull the right side cover off.

2 AttachthePCVmoduletothetopoftheECMundertheseatinthelocationshowninFig.B.

Use the supplied alcohol swap to clean the surface area, prior to making the attachment with the supplied velcro.

FIG.A

FIG.C

FIG.B

Remove

Remove

Remove

3 RoutethePCVwireharnessundertheplastictrayanddowntherighthandsideoftheATV,followingthestockwiringharness(Fig.C).

This wire routing will be much easier with the clutch snorkel and the 2 bolts at the front of the tray under the seat removed.

17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 4

FIG.

FIG.F

FIG.D

FIG.E

4 Locatethe6-pinBLACKconnectorthatcomesfromthethrottlebodies.Unplugthisconnector(Fig.D).

6 SecurethegroundwireofthePowerCommanderharnesstothegroundboltontheshifterbracket(Fig.F).

5 ConnectthePCVwiringharnessin-linewiththestockwiringharnessandthrottlebodyharness(Fig.E).

17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 5

FIG.I

FIG.H

10 ContinuetoroutetheremainderofthePCVwiringharnessdowntheframerailanduptowherethecrankpositionsensorconnectorsarelocated.

These connectors are located behind the steering stem cover that was removed in step 1.

They are WHITE, 2-pin connectors, and are located by the steering stem (Fig. I).

FIG.G

7 Locatetherearignitioncoil.ItislocatedontherighthandsideoftheATVneartheframerail(Fig.G).

8 UnplugtheBLUE/WHITEwireontheATV’srearignitioncoil.

9 ConnectthesetofBLUEcoloredwiresofthePCVharness,in-lineofthestockcoilandtheBLUE/WHITEwire(Fig.H).

The BLUE/WHITE wire is the one closer to the engine.

17-031 www.powercommander.com 2008-2019 Kawasaki Brute Force 750 - PCV - 6

FIG.J

FIG.K

15 UnplugtheGREEN/WHITEwireonthefrontignitioncoil.

16 ConnectthesetofGREENwiresofthePCVharnessin-linewiththecoilandtheGREEN/WHITEwire(Fig.L).

The GREEN/WHITE wire is the one closer to the steering stem.

17 UsethesuppliedziptiestothetieupthePCVharness,beingsuretokeepitfreeandclearofanyhotormovingparts.

18 Reinstalltheclutchsnorkel(ifremoved),plasticcovers,shifterknob,keyswitch,andseat.

FIG.L

11 PlugthesetofWHITE2-pinconnectorsofthePCVharnessinlinewiththeATV’scrankpositionsensorconnectors(Fig.J).

12 ContinuetoroutetheremainderofthePCVwiringharnessdownwardbythesteeringstemandtotheleft,wherethefrontignitioncoilislocated(Fig.K).

13 UnplugtheYELLOW/REDwireonthefrontignitioncoil.

14 ConnectthesetofREDwiresofthePCVharnessin-linewiththecoilandtheYELLOW/REDwire.