1

Overview of the Open Solicitation Processfor the New England Clean Power Link

A Presentation by the Independent EvaluatorFor the Webex Information Session

Vincent [email protected]

202.296.5520

November 10, 2015

Page 2: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

REMINDERS

A. Submit questions to [email protected]

B. Please mute your phones

C. All questions posted on FAQ section of website

1

Page 3: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

OVERVIEW OF OPEN SOLICITATION

FERC-regulated sale of transmission capacity

Purpose: identify, in an open and transparent manner, the parties with whom TDI-NE will negotiate for transmission rights on the NECPL

Part 1: Identify parties for negotiations

Part 2: Negotiations with selected parties

2

Page 4: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

INTENT OF OPEN SOLICITATION

Intent is to fully subscribe NECPL

through the Open Solicitation

3

Page 5: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

REGULATORY BASIS

• NECPL is a “merchant” project

• Negotiated rate authority granted by FERC

• Condition: hold an Open Solicitation

• See March 10, 2014 FERC Order

4

Page 6: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

BOSTON PACIFIC’S ROLE

Boston Pacific’s roles include:

• Follow FERC-established guidelines

• Evaluate Expressions of Interest

• Ensure that the Open Solicitation is fair, transparent, and not unduly discriminatory

5

Page 7: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

HOW TO PARTICIPATE

1. Register at www.necplinkos.com

2. Submit non-binding “Expression of Interest” by December 4

If Selected:

3. Negotiate/Execute Precedent Agreement

4. Negotiate/Execute Transmission Service Agreement

6

Page 8: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

EXPRESSIONS OF INTEREST

• Due December 4, 2015 at 5:00 EST

• Required to be considered for negotiations w/ TDI-NE

• Non-binding

• Submission directions:

• Fill out in full

• Send to [email protected]

•Or, upload to www.necplinkos.com

•Access EOI at http://

www.necplinkos.com/docs/open-solicitation/NECPL-Expression-of-Interest-Form.pdf

7

Page 9: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

EXPRESSIONS OF INTEREST

Five Sections

I. Contact Information

II. Credit Information

A. Credit Rating

B. Tangible Net Worth

C. Additional Documentation (Optional)

III. Desired Features for Transmission Rights

A. Capacity (in MW)

B. Term

C. Start Date

IV. Statement on Ability to Advance New England Public

Policy Goals of GHGs Reductions and Supply Diversity

A. Additional Documentation (Optional)

V. Certifications8

Page 10: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

EVALUATION PROCESS

Threshold selections based on:

1. Level of creditworthiness

2. Anticipated amount of reserved capacity (min 50 MW)

3. Anticipated length of term

4. Financial strength

5. Desired date for the commencement of transmission service

6. Ability to advance New England public policy goalspromoting greenhouse gas reductions and supply diversity

9

Page 11: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

TIMELINE

10

Date DescriptionOctober 15, 2015 Open Solicitation BeginsDecember 4, 2015 Expression of Interest due (5:00 EST)December 18, 2015 Parties qualified for negotiations and notifiedJanuary 15, 2016 (estimated) Execution of all Precedent AgreementsJune 15, 2016 (estimated) Execution of all Transmission Service AgreementsJuly 15, 2016 (estimated) Filing at FERC disclosing results

Page 12: 1 Overview of the Open Solicitation Process for the New England Clean Power Link A Presentation by the Independent Evaluator For the Webex Information.

QUESTIONS?

Now: Email [email protected]

After this information session, questions should be submitted to:

Vincent Musco [email protected] (202) 296.5520

Questions (and answers) will be added to FAQs

• See http://www.necplinkos.com/docs/open-solicitation/NECPL-OS-Public-FAQs.pdf

11