1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf ·...
Transcript of 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf ·...
![Page 1: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/1.jpg)
City Light P: 067663
Electrica1 Metho1.1 ListinThe studall goverThe totalpower ofstate demFrom thethe numbreadily oLocal infoof connelow volta1.2 ServiThis conn1. MediuA consumsubstatioand reguMetering2. Low VoThe instametered 1.3 ElectThe whoA selectioMV/LV mNeutral erelated toThe distrdeterminThe typedisturban1.4 ProteThe earthappropriagainst h
Switchgears3766, F:0676
l Installationdology ng of power y of a proponing rules anl power demf each load, mand, startinese data, theber of sourcbtained. ormation regction arrangage level. ce connectionection can um Voltage lemer‐type subon may be anulations (the g at mediumoltage level allation will baccording torical Distrible installatioon guide is pmain distribuearthing arrao the powerribution equned from bu of premisesnces. ection againhing system ate protectivhazards of di
L.L.C. P.O.b63776
ns
demands osed electricnd regulatiomand can be together witng conditione power reques necessary
garding tarifgement to th
on be made at:evel bstation willn outdoor olow‐voltage
m‐voltage or
be connecteo LV tariffs. ution architon distributioproposed forution and LV angements ar‐supply, andipment (panilding plans s and allocat
st electric sh(TT, IT or TNve devices mrect or indir
box 7450 ,Um
al installations. calculated fth the knowns, non simuuired from ty for an ade
ff structureshe power‐su
:
then have tr indoor inste section malow‐voltage
ed to the loca
ecture on network r determinatpower distrare chosen ad to the typenel boards, sand from thtion can influ
hocks N) having bemust be imprect contact.
m Al Quwain
on requires a
from the datwledge of theltaneous ophe supply soquate suppl
is also requpply networ
to be studiedtallation cony be studiedis possible i
al power net
is studied astion of the mribution leveaccording to e of loads. witchgears, e location auence their i
en previouslemented in
, UAE
an adequate
ta relative toe operating mperation, etcource and (wy to the inst
ired to allowrk, e.g. at me
d, built and enforming to rd separately n this case.
twork and w
s a completemost suitableels are coverlocal regula
circuit connnd groupingimmunity to
ly determine order to ac
understand
o the locatiomodes (stea.) where approtallation are
w the best chedium voltag
equipped. Trelevant stanif necessary
will (necessar
e system. e architectued. ations, const
nections, ...) g of loads. o external
ed, then thehieve protec
ding of
n and dy
priate)
hoice ge or
his ndards y).
rily) be
re.
raints
are
e ction
![Page 2: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/2.jpg)
City Light P: 067663
1.5 CircuiEach circuof short‐cof circuit ccablewaysBefore adbe satisfie• The volt• Motor s• ProtectiThe shortwithstandThese calcthan the sThe perfocharacterThe use otripping o1.6 ProtecDirect or iof severalover‐voltaand soluti1.7 EnergImplemenwithin thereduced pequipmen1.8 ReactThe poweglobally o1.9 HarmoHarmonicdisturbanequipmenorigins anthe soluti1.10 PartiParticular• Specific • Specific LV/LV tran• Specific
Switchgears3766, F:0676
ts and switchuit is then stucircuit currentconductors cas and their indopting the coed: tage drop comstarting is satiion against el‐circuit curred capability ofculations maysize originallyormance requistics. of cascading teof circuit breaction againstindirect lightnl kilometers. Oage can also pions are propy efficiency intation of mee electrical inpower consumnt. ive energy er factor correor as a combinonics cs in the netwces as overlont, of local arend the effects ons. icular supply r items or equsources suchloads with spnsformers systems, suc
L.L.C. P.O.b63776
hgear died in detailt, and the typan be determfluence on thonductor size
mplies with thisfactory ectric shock int Isc is then f the circuit isy indicate thay chosen. uired by the sw
echniques ankers are examt over‐voltagening strokes cOperating voproduce the sposed. n electrical deasuring devicstallation canmption, reduc
ection within nation of both
work affect theoads, vibrationea networks, of harmonics
sources and uipment are h as alternatopecial charact
ch as direct‐cu
box 7450 ,Um
l. From the rape of protectivmined, taking he current rat indicated ab
he relevant st
is assured determined, s checked. at it is necessa
witchgear wil
d the discrimmined. es can damage eltage surges, same consequ
distribution ces with an adn produce higced cost of en
electrical insh methods.
e quality of ens, ageing of telephone nes and explain
loads studied: ors or inverterteristics, such
urrent netwo
m Al Quwain
ated currents ve device, theinto account ting of condubove, the follo
tandard
and the ther
ary to use a c
ll determine i
minative opera
electrical equtransient anduences. The e
dequate comgh benefits fonergy, better
tallations is c
nergy and areequipment, tetworks. This how to meas
rs h as induction
rks
, UAE
of the loads,e cross‐sectiothe nature ofctors. owing require
rmal and elect
conductor size
its type and
ation of fuses
ipment at a dd industrial freffects are ex
munication sr the user or use of electr
carried out loc
e at the origintrouble of sens chapter deasure them an
n motors, ligh
the level onal area f the
ements must
trodynamic
e larger
s and
distance requency amined
system owner: ical
cally,
n of many nsitive ls with the nd present
ting circuits oor
![Page 3: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/3.jpg)
City Light P: 067663
1.11 GenCertain pcommon1.12 EMCSome baNon obsethe electof protec1.13 UseIt provideand recoThe follo• Constru• Calcula• Calcula• Optimi• Require• Discrim• Recom• Verifica• Compre
Switchgears3766, F:0676
neric applicapremises andn example beC Guidelinessic rules muervance of thtrical installaction devicese Of Electricaes a completmmendatiowing featureuction of onation of shoration of voltazation of cabed ratings ofmination of pmendationsation of the ehensive pri
L.L.C. P.O.b63776
ations d locations aeing residents st be followhese rules mation: disturbs, and even dal Design Softe design pans. es are include‐line diagrart‐circuit curage drops ble sizes f switchgearprotective des for cascadinprotection oint‐out of th
box 7450 ,Um
are subject totial dwelling
ed in order tmay have serbance of comdestruction ftware ackage for LV
ded: ams rents
r and fuse‐unevices ng schemesof people e foregoing
m Al Quwain
o particularlgs.
to ensure Elrious conseqmmunicationof sensitive
V installation
nits
calculated d
, UAE
ly strict regu
ectromagnequences in thn systems, ndevices.
ns, in accord
design data
ulations: the
etic Compatihe operationnuisance trip
dance with IE
most
bility. n of pping
EC standardss
![Page 4: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/4.jpg)
City Light P: 067663
2 Rules aLow‐voltmay be c• Statuto• Codes o• Nationa• Nationa2.1 ReguIn most cissued byaccount t2.2 StandThis Guidestablishexperienare the fuIEC 6003IEC 6007IEC 6007air IEC 6007IEC 6007IEC 6014convertoIEC 6025IEC 6026less thanIEC 6026IEC 6026persons (IEC 6028IEC 6028(100% loIEC 6036IEC 6036IEC 6036electric sIEC 6036thermal eIEC 6036over‐curr
Switchgears3766, F:0676
and statutortage installaclassified as ory regulatioof practice, al and internal and internlations countries, ely National Athese local cdards de is based ohed by medicce at an inteundamental8 Standard v6‐2 Power t6‐3 Power t
6‐5 Power t6‐10 Power 6 Semicondors 5 Electrical r5‐1 High‐voln 52 kV 9‐1 Low‐volt9‐2 Low‐volt(fuses mainl2‐1 High‐vol7‐1‐1 Electriad factor) an4 Electrical i4‐1 Electrica4‐4‐41 Electshock 4‐4‐42 Electeffects 4‐4‐43 Electrent
L.L.C. P.O.b63776
ry regulationtions are gofollows:
ons (decrees,regulations national stannational stan
ectrical instauthorities orconstraints b
on relevant Ical and enginernational les of most elvoltages ransformersransformers
ransformerstransformeructor conve
relays ltage switch
tage fuses ‐ tage fuses ‐ y for househltage fuses ‐ic cables ‐ Cand calculatioinstallationsal installationtrical installa
trical installa
trical installa
box 7450 ,Um
ns overned by a
, factory actissued by prndards for inndards for p
allations shar by recognizbefore starti
EC standardneering expeevel. Currentectrical stan
s ‐ Temperats ‐ Insulation
s ‐ Ability to rs ‐ Determirtors ‐ Gene
es ‐ High‐vo
General reqSupplementhold and sim‐ Current‐limalculation ofon of losses ‐ of buildingsns of buildinations of bui
ations of bui
ations of bui
m Al Quwain
a number of
s, etc.) rofessional innstallationsroducts
all comply wzed private bng the desig
ds, in particuerts of all cotly, the safetndards in the
ture rise n levels, diele
withstand snation of soeral requirem
ltage switch
quirementstary requiremilar applicatmiting fusesf the current‐ General s ngs ‐ Fundamldings ‐ Prot
ldings ‐ Prot
ldings ‐ Prot
, UAE
f regulatory
nstitutions, j
ith more thabodies. It is gn.
ular IEC 6036ountries in thty principles e world (see
ectric tests a
hort‐circuitund levels ments and lin
hes for rated
ments for futions)
t rating ‐ Cur
mental princitection for sa
tection for sa
tection for sa
and advisor
job specifica
an one set oessential to
64. IEC 60364he world comof IEC 6036table below
and external
ne commuta
voltages ab
uses for use
rrent rating
iples afety ‐ Prote
afety ‐ Prote
afety ‐ Prote
ry texts, whi
ations
f regulationstake into
4 has beenmparing thei4 and 60479
w )
l clearances
ated
bove 1 kV an
by unskilled
equations
ection agains
ection agains
ection agains
ich
s,
ir 9‐1
in
d
st
st
st
![Page 5: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/5.jpg)
City Light P: 067663
IEC 6036electromIEC 6036equipmeIEC 6036equipmeIEC 6036equipmeIEC 6036equipme
IEC 6036equipmeIEC 6036IEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locations
Switchgears3766, F:0676
4‐4‐44 Electmagnetic and4‐5‐51 Electent ‐ Commo4‐5‐52 Electent ‐ Wiring s4‐5‐53 Electent ‐ Isolation4‐5‐54 Electent ‐ Earthing
4‐5‐55 Electent ‐ Other e4‐6‐61 Elect4‐7‐701 Elecs ‐ Locations 4‐7‐702 Elecs ‐ Swimming4‐7‐703 Elecs ‐ Locations 4‐7‐704 Elecs ‐ Construct4‐7‐705 Elecs ‐ Electrical 4‐7‐706 Elecs ‐ Restrictive4‐7‐707 Elecs ‐ Earthing r4‐7‐708 Elecs ‐ Electrical 4‐7‐709 Elecs ‐ Marinas a4‐7‐710 Elecs ‐ Medical lo4‐7‐711 Elecs ‐ Exhibition4‐7‐712 Elecs ‐ Solar phot4‐7‐713 Elecs ‐ Furniture
L.L.C. P.O.b63776
trical installad voltage disttrical installaon rules trical installasystems trical installan, switching trical installag arrangeme
trical installaquipments trical installactrical instalcontaining actrical instalg pools and ctrical instalcontaining sctrical instaltion and demctrical instalinstallationsctrical instale conductingctrical instalrequirementctrical instalinstallationsctrical instaland pleasurectrical instalocations ctrical instalns, shows anctrical instaltovoltaic (PVctrical instal
box 7450 ,Um
ations of buiturbance ations of bui
ations of bui
ations of buiand control
ations of buients
ations of bui
ations of builations of bua bath tub olations of buother basinslations of busauna heatelations of bumolition site lations of bus of agricultulations of bug locationslations of buts for the inslations of bus in caravan lations of bue craft lations of bu
lations of bud stands lations of buV) power suplations of bu
m Al Quwain
ldings ‐ Prot
ldings ‐ Sele
ldings ‐ Sele
ldings ‐ Selel ldings ‐ Sele
ldings ‐ Sele
ldings ‐ Verifuildings ‐ Reqor shower bauildings ‐ Reqs uildings ‐ Reqers uildings ‐ Reqinstallationsuildings ‐ Requral and hortuildings ‐ Req
uildings ‐ Reqstallation of uildings ‐ Reqparks and cauildings ‐ Req
uildings ‐ Req
uildings ‐ Req
uildings ‐ Reqpply systemsuildings ‐ Req
, UAE
tection for sa
ction and er
ction and er
ction and er
ction and er
ction and er
fication andquirements asin quirements
quirements
quirements s quirements ticultural prequirements
quirements data procesquirements aravans quirements
quirements
quirements
quirements s quirements
afety ‐ Prote
rection of ele
rection of ele
rection of ele
rection of ele
rection of ele
testing ‐ Inifor special in
for special in
for special in
for special in
for special inemises for special in
for special insing equipmfor special in
for special in
for special in
for special in
for special in
for special in
ection agains
ectrical
ectrical
ectrical
ectrical
ectrical
tial verificatnstallations
nstallations
nstallations
nstallations
nstallations
nstallations
nstallations ment nstallations
nstallations
nstallations
nstallations
nstallations
nstallations
st
tion or
or
or
or
or
or
or
or
or
or
or
or
or
![Page 6: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/6.jpg)
City Light P: 067663
IEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsfairgrounIEC 6042IEC 6043type‐testIEC 6043busbar trIEC 6043low‐voltaunskilledIEC 6043assembliIEC 6044IdentificaIEC 6043assembli(CDCs) IEC 6047IEC 6047
IEC 6047through tIEC 6052IEC 6064IEC 6066IEC 6071rails for mIEC 60721.2 kV) aIEC 6075IEC 6078circuit apIEC 6083
Switchgears3766, F:0676
4‐7‐714 Elecs ‐ External li4‐7‐715 Elecs ‐ Extra‐low4‐7‐717 Elecs ‐ Mobile or4‐7‐740 Elecs ‐ Temporarnds, amusem7 High‐volta9‐1 Low‐voltted assembl9‐2 Low‐voltrunking syste9‐3 Low‐voltage switchged persons hav9‐4 Low‐voltes for const6 Basic and ation of cond9‐5 Low‐voltes intended
9‐1 Effects o9‐2 Effects o
9‐3 Effects othe body of 9 Degrees o4 Specificati4 Insulation 5 Dimensionmechanical s4 Short‐circund 3 kV (Um5 General re7 Applicatiopplication 1 Shunt pow
L.L.C. P.O.b63776
ctrical instalighting instactrical instal‐voltage lighctrical instalr transportabctrical instalry electrical ment parks aage alternatitage switchgies tage switchgems (buswatage switchgear and contve access fotage switchgruction sitessafety princductors by ctage switchg to be instal
of current onof current on
of current onlivestock
of protectionion for high‐coordinations of low‐vosupport of euit temperatm = 3.6 kV) equirementson guide for t
wer capacito
box 7450 ,Um
lations of buallations lations of buhting installalations of buble units lations of buinstallationsnd circusesng current cgear and con
gear and conys) gear and controlgear asseor their use ‐gear and cons (ACS) iples for macolours or nugear and conled outdoor
n human bein human bei
n human bei
n provided by‐voltage fuseon for equipmltage switchlectrical devture limits o
s for residuathe selection
ors of the sel
m Al Quwain
uildings ‐ Req
uildings ‐ Reqations uildings ‐ Req
uildings ‐ Reqs for structur
circuit‐breakntrolgear ass
ntrolgear ass
ntrolgear assemblies inteDistributionntrolgear ass
n‐machine iumerals ntrolgear assrs in public p
ings and liveings and live
ings and live
y enclosurese‐links for mment withinhgear and covices in switcof electric ca
l current opn of fuse‐lin
f‐healing typ
, UAE
quirements
quirements
quirements
quirements res, amusem
kers semblies ‐ Ty
semblies ‐ Pa
semblies ‐ Panded to be in boards semblies ‐ Pa
nterface, ma
semblies ‐ Paplaces ‐ Cable
estock ‐ Geneestock ‐ Spec
estock ‐ Effec
s (IP code) otor circuit low‐voltagentrolgear. Stchgear and cbles with rat
erated proteks of high‐vo
pe for AC sys
for special in
for special in
for special in
for special inment devices
ype‐tested a
articular req
articular reqinstalled in p
articular req
arking and id
articular reqe distributio
eral aspects cial aspects
cts of curren
applicationse systems tandardizedcontrolgear ted voltages
ective deviceoltage fuses
stems havin
nstallations
nstallations
nstallations
nstallations s and booths
and partially
quirements f
quirements fplaces where
quirements f
dentification
quirements fn cabinets
nts passing
s
mounting oinstallationss of 1 kV (Um
es for transfor
g a rated
or
or
or
or s at
y
for
for e
for
n ‐
for
on s. m =
rmer
![Page 7: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/7.jpg)
City Light P: 067663
voltage uand ratinIEC 6094IEC 6094IEC 6094switchdisand fuse‐IEC 6094ElectromIEC 6094AutomatIEC 6100IEC 6114equipmeIEC 6155DC ‐ EquirequiremIEC 6155DC ‐ EquiIEC 6155DC ‐ EquiIEC 6155requiremIEC 6227IEC 6227circuit‐brIEC 6227and earthIEC 6227combinaIEC 6227switchgeIEC 62272.3 QualiIn so far only if: • The initregulatio• The ele• The pemanufac
Switchgears3766, F:0676
up to and incng ‐ Safety re7‐1 Low‐volt7‐2 Low‐volt7‐3 Low‐voltsconnectors‐combinatio7‐4‐1 Low‐v
mechanical co7‐6‐1 Low‐vtic transfer s0 Electroma0 Protectionent 7‐1 Electricaipment for tments 7‐8 Electricaipment for t7‐9 Electricaipment for i8‐2‐6 Safety
ments for saf1‐1 Commo1‐100 High‐vreakers 1‐102 High‐vhing switche1‐105 High‐vtions 1‐200 High‐vear and contr1‐202 High‐vity and safetas control p
tial checkingon has been ectrical equipriodic checkturer is resp
L.L.C. P.O.b63776
cluding 1000equirementstage switchgtage switchgtage switchg
on units oltage switcontactors anoltage switcwitching eqagnetic compn against ele
al safety in loesting, mea
al safety in loesting, meaal safety in lonsulation fay of power trfety isolatingn specificativoltage swit
voltage swites voltage swit
voltage switrolgear for rvoltage/lowty of an elecprocedures a
g of conformachieved pment compking of the inpected.
box 7450 ,Um
0 V ‐ Generas ‐ Guide for gear and congear and congear and con
chgear and cnd motor‐stachgear and cuipment patibility (EMectric shocks
ow‐voltage dsuring or mo
ow‐voltage dsuring or moow‐voltage dult location ransformersg transformeons for hightchgear and
tchgear and
tchgear and
tchgear and rated voltagew voltage prectrical instalare respecte
mity of the el
ply with stannstallation re
m Al Quwain
l ‐ Performainstallation ntrolgear ‐ Gntrolgear ‐ Cntrolgear ‐ S
controlgear ‐arters controlgear ‐
MC) ‐ common a
distribution onitoring of
distribution onitoring of distribution in IT system, power supers for generh‐voltage swcontrolgear
controlgear
controlgear
controlgear es above 1 kefabricated sllation ed, quality a
ectrical insta
ndards ecommende
, UAE
nce, testingand operati
General rulesCircuit‐breakwitches, dis
‐ Contactors
‐ Multiple fu
aspects for i
systems up protective m
systems up protective msystems up s ply units andral use itchgear and‐ High‐volta
‐ Alternatin
‐ Alternatin
‐ AlternatinkV and up to substations
nd safety w
allation with
d by the equ
on s ers connectors,
and motor‐
unction equip
nstallation a
to 1000 V Ameasures ‐ G
to 1000 V Ameasures to 1000 V A
d similar ‐ Pa
d controlgeaage alternati
g current di
g current sw
g current mand includin
will be assure
h the standa
uipment
‐starters ‐
pment ‐
and
C and 1500 VGeneral
C and 1500 V
C and 1500 V
articular
ar standardsng‐current
sconnectors
witch‐fuse
etal‐encloseng 52 kV
ed
rd and
V
V
V
s
ed
![Page 8: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/8.jpg)
City Light P: 067663
2.4 InitiaBefore a electricasatisfied.regulatioall such rsafety rustandardintendedrequired howeverrelated torequirem• The prebuildings• Insulatiphases a• Continuconducto• Resista• Verifica• Check o• Cross‐sprevailininstallatio• Verifica(where a• Check oThese tesnumerouexampleon class 2attentionessentialensure samodifiedto satisfy2.5 ConfoinstallatiAttestatiThe conf
Switchgears3766, F:0676
al testing of utility will cl tests and v. These testsons, which mregulations hles in the deds included ind to cover allfor resident
r have additio a particulaments are bee‐commissios include, typion tests of and betweenuity and conors nce tests of ation of the of allowablesectional‐areg, taking accon conditionation that alppropriate) of clearancests and checus other test: TN‐, TT‐ or 2 insulation,n to the part rules to be afe and troud if necessaryy all pre‐comormity (withion ion of confoformity of eq
L.L.C. P.O.b63776
an installationnect an inisual inspects are made amay differ slighowever, areesign and rean this guide l the safety mtial, commeronal regulatar product (pyond the scooning electricpically, all ofall cable andn phases andnductivity tes
earthing eleproper opere number of ea check of acount of thens (in air, conl exposed‐ a
e distances incks are basicts and rules aIT‐earthed i, SELV circuitticular featurobserved inuble‐free pery to comply mmissioning th standards
ormity quipment w
box 7450 ,Um
ion nstallation totions by the according to ghtly from oe common, aalization of tare based omeasures anrcial and (thtions petroleum, cope of this gcal tests andf the followind wiring condd earth sts of protec
ectrodes witration of thesocket‐outleall conducto associated nduit, etc.)nd extraneo
n bathroomsc (but not exare includedinstallationsts, and specires of differe order to acrformance. Twith any potest and inspand specific
with the relev
m Al Quwain
o its supply nauthority, olocal (gover
one country tand are basethe installatin an internand approvede majority o
coal, naturalguide. d visual‐inspng: ductors of th
ctive, equipo
th respect toe interlocks, ets per circurs for adequprotective d
ous metallic
s, etc. haustive) tod in the regu, installationial locationsent types of hieve a satisThe methodsossible variatpection requcations) of e
vant standa
, UAE
network, stror by its appornmental anto another. Ted on the obion. IEC 6036ational consed installationof) industrial
gas, etc.). S
ection check
he fixed inst
otential and
o remote earif any it uacy at the sdevices, mate
parts are pr
the majoritlations to cons based , etc. The aiminstallation,sfactory leves recommention imposeduirements.equipment u
rds can be a
rict pre‐commointed agentd/or institutThe principlbservance of64‐6‐61 andensus for suc practices nobuildings. M
Such addition
ks for install
allation, bet
earth‐bondi
rth
hort‐circuit erials and
operly earth
y of installatover particul
m of this gui, and to indiel of quality, nded in this gd by a utility
used in the
attested:
missioningt, must be tional) es of f rigorous related ch tests, ormally Many industr
nal
ations in
tween
ing
levels
hed
tions, whilelar cases, for
ide is to drawcate the which willguide, y, are intend
ries
r
w
ed
![Page 9: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/9.jpg)
City Light P: 067663
• By an o• By a ce• By a deThe first DeclaratWhere thdeclaratias a validof conforNote: CEIn Europeto affix th• The pro• It is preThe CE mMark of Marks ofnon instrdeliveredstandardCertificatThe standsituationAssurancA laboratthese tesdestroyefabricatethe charadeclaraticertificatassuring control sare issuestandardcontrol c• Model • Model manufacfuses wh
Switchgears3766, F:0676
official mark rtificate of ceclaration oftwo solution
ion of confohe equipmenon of conford attestationrmity can re marking e, the Europhe CE markinoduct meetsesumed to bmarking is neconformity f conformity ructed peopd by certificad and after vetion of Qualdards defines rather thace tory for teststs are calleded (tests on fed products hacteristics ston or tion of confothe quality oystem whiched by organizd ISO 9001: 2correspondin3 defines as2 includes, ituring proceere perform
L.L.C. P.O.b63776
of conformiconformity isf conformity ns are gener
ormity nt is to be usrmity (includn. Where theinforce the m
pean directivng on his ows the legal ree marketableither a mar
are affixed le (e.g in theation body iferification olity e several men to differen
ing samples d type tests. fuses, for exahave, in facttated. Qualit
ormity. As prof productioh monitors tzations spec2000. These ng to differessurance of qin addition tess. For exammance charac
box 7450 ,Um
ity granted bssued by a cfrom the mrally not ava
sed by skilleded in the tee competencmanufacture
ves require twn responsibequirementsle in Europerk of origin n
on appliancee field of domf the equipmof the manuf
ethods of qunt levels of q
cannot certIn some tesample). Onlyt, ty assurance
roof that all on, the manuthe fabricatioializing in qustandards dnt situationsquality by ino checking omple, this mcteristics can
m Al Quwain
by the certifertification anufacturerilable for hig
d or instructechnical docce of the maer’s declarat
he manufacbility. It meas
nor a mark o
es and equipmestic appliament meet thfacturer’s qu
ality assuranquality.
tify the confosts for confoy the manuf
e certification
the necessaufacturer obon of the prouality controefine three s rather thanspection andof the final pethod is appnnot be chec
, UAE
ication bodybody, or r gh voltage e
ted persons,umentationnufacturer ition.
turer or his ns that:
of conformit
pment geneances). A mahe requiremuality manag
nce which co
ormity of anrmity to stafacturer can
n is intended
ry measuresbtains certificoduct conceol, and are bamodel systen to differend checking oproduct, veriplied, to the cked withou
y concerned,
quipment.
, the manufa), is generallis in doubt, a
authorized r
ty.
rally used byark of confoents from angement syste
orrespond to
n entire prodndards, the certify that
d to complet
s have been cation of theerned. Theseased on the ems of qualitnt levels of qof final produification of tmanufacturut destroying
, or
acturer’s ly recognizeda certificate
representati
y ordinary rmity is n applicableem.
o different
duction run:samples arethe
te the initial
taken for e quality e certificatesinternationaty assuranceuality: ucts. he rer of g the
d
ive
e
l
s al e
![Page 10: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/10.jpg)
City Light P: 067663
fuse. • Model of the deintendedspecifica 2.6 EnvirEnvironmrequirembut can adesign soobjectivereducingthis purpmaterialscycle (froraw mateDirective• RoHS D(the com1st, 2006cadmiumdiphenyl • WEEE DAugust 2date is Ahouseholegislatiofavour ofsustainabinstallatiotaking intstructureimpacts (
Switchgears3766, F:0676
1 corresponesign processd to fabricatetion).
ronment mental manaments given ialso be grantometimes cae of designin their enviropose lead to s taking intoom extractioerials to scraes have beenDirective (Reming into forc6) aims to elim, hexavalenethers (PBDDirective (W005 (the comugust 13th, ld and non hon will followf products ecble developmon. Actually,to account oe (switchboa(raw materia
L.L.C. P.O.b63776
nds to modes must be rige and test a
agement sysin ISO 14001ted to placesalled “eco‐deng products/onmental imchoose equio account theon of ap) i.e. produn published, striction of Hce was on Feiminate fromnt chromiumDE). Waste of Electming into fo2005) in ordhousehold ew the same oco‐design, thment can be, it has beenoperation coards, buswayal depletion,
box 7450 ,Um
l 2, but withgorously scrprototype (c
tems can be1. This type os where proesign” is an a/services besmpact over thipment’s arce influence o
uction, transthey are calHazardous Sebruary 13thm products s, polybromin
trical and Elerce was on Fder to mastequipment. Inobjectives. Inhe contribute significantlyn shown thatonditions, Mys, cables), c, energy dep
m Al Quwain
the additioutinized; forcase of a cus
e certified byof certificatioducts are deapproach of st meeting thheir whole lifchitecture toof a product
sport, distribled: Substances) ch, 2003, andsix hazardounated biphe
ectronic EquFebruary 13ter the end ofn other partn addition totion of the wy improved tt an optimiseV/LV substaan reduce spletion, end
, UAE
nal requiremr example, wstom‐built p
y an indepenon mainly coesigned. A pf sustainablehe customerfe cycle. Theogether withon the envi
bution, end o
coming into the applicats substancenyls (PBB) o
uipment) comth, 2003, anf life and trets of the woro manufactuwhole electrithrough theed design oftions locatioubstantially of life)
ment that thwhere it is noroduct made
ndent body ioncerns induroduct envire developmers’ requireme methodoloh componentronment alo
of life etc. In
force on Jultion date is Js: lead, meror polybromi
ming into fod the applicatments for rld some newrers action ical installati design of thf the installaon and distrienvironmen
e quality ot e to
f they meetustrial settinronmental ent with theents whileogies used fots and ong its life
n Europe two
ly 2006 July cury, nated
rce in ation
w in ion to he tion, bution ntal
ngs
or
o
![Page 11: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/11.jpg)
City Light P: 067663
3 Installe3.1 InducCurrent dThe full‐l• 3‐phase• 1‐phasewhere � Ia: cur� Pn: no� U: volt� for sin� or pha� η: per‐� cos : Subtrans• Subtrantimes the• Merlin designedpeak valu• If unexmeans thswitchgedevices cswitchgeMotor stAlthoughcurrents static sof(ExampleCompensIt is genesupplied power oumotors isAs discussignificanmeans a Compensperiods aAs noted
Switchgears3766, F:0676
ed power loaction motordemand load currente motor: Ia =e motor: Ia =
rent demanminal powetage betweegle‐phase mase‐to‐phase‐unit efficienpower factosient currentnsient curree rms rated vGerin circuid to withstanue can be uppected tripphe starting cear withstandcan be destroear must be ctarting curreh high efficieare roughly ft start unit oe : 4 Ia insteasation of reaerally advantto inductionutput of the s generally rssed in chaptntly reducedcorrespondsation of reaat reduced pd above cos
L.L.C. P.O.b63776
ads – Characs
t Ia supplied= Pn x 1,000= Pn x 1,000
d (in amps) r (in kW) en phases fomotors (in voe. ncy, i.e. outpor, i.e. kW int and protecnt peak valuvalue Inm. St‐breakers, Tnd motor stap to 19 timesping of the ourrent exceeds can be reoyed. In ordconsidered. ent ency motors the same asor variable sad of 7.5 Ia).active‐powetageous for tn motors. Thmotors. Theeferred to ater L, the apd by the use ing reductioactive‐powepower. = kW inpu
box 7450 ,Um
cteristics
d to the mot / (√3 x U x η / (U x η x co
r 3‐phase mlts). A single
put kW / inpnput / kVA inction settingue can be veSometimes tTelemecaniqarts with vers the rms ratvercurrent peds the normached, life ter to avoid s
can be founs some of staspeed drive a. r (kvar) supptechnical anhis can be ace applications “power‐fapparent powof shunt‐conon of input cur is particula
t/kVA input
m Al Quwain
tor is given bη x cos ) os )
otors and voe‐phase mot
ut kW nput g ry high ; typhis value canque contactory high subtrted value Inprotection omal limits. Asime can be rsuch a situat
nd on the maandard motoallows to red
plied to indud financial rchieved by un of this princtor improver (kVA) supnnected capurrent (sincearly advised
, UAE
by the follow
oltage betweor may be c
ical value is n reach 25 tors and therransient currm). occurs durings a result, soreduced andtion, oversiz
arket, in praors. The useduce the val
uction motoreasons to resing capacitnciple to the ement” or “pplied to an pacitors. Rede the voltagefor motors t
wing formul
een the termonnected ph
about 12 toimes Inm. rmal relays arent (subtran
g starting, thome maximud even somezing of the
ctice their ste of start‐delue of the sta
rs educe the cuors without operation o
“power‐factoinduction mduction of inpe remains cothat operate
ae:
minals hasetoneutr
o 15
are nsient
his um e
tarting ta starter, arting curren
urrent affecting thof inductionor correctionmotor can beput kVA onstant). e for long
ral
nt
e
n”.
![Page 12: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/12.jpg)
City Light P: 067663
so that a The curreI = Ia cos where coafter com
Switchgears3766, F:0676
kVA input rent supplied/ cos ’
os is the pompensation,
L.L.C. P.O.b63776
eduction in d to the moto
ower factor Ia being the
box 7450 ,Um
kVA input wor, after pow
before come original cur
m Al Quwain
will increase wer‐factor co
pensation arrent.
, UAE
(i.e. improveorrection, is
nd cos ’ is
e) the value given by:
the power f
of cos
factor
![Page 13: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/13.jpg)
City Light P: 067663
Switchgears3766, F:0676
L.L.C. P.O.b63776
box 7450 ,Umm Al Quwain
, UAE
![Page 14: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/14.jpg)
City Light P: 067663
Switchgears3766, F:0676
L.L.C. P.O.b63776
box 7450 ,Umm Al Quwain
, UAE
![Page 15: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/15.jpg)
City Light P: 067663
Switchgears3766, F:0676
L.L.C. P.O.b63776
box 7450 ,Umm Al Quwain
, UAE
![Page 16: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/16.jpg)
City Light P: 067663
Switchgears3766, F:0676
L.L.C. P.O.b63776
box 7450 ,Umm Al Quwain
, UAE
![Page 17: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing](https://reader033.fdocuments.in/reader033/viewer/2022061000/60af475d90bda33bc8509b58/html5/thumbnails/17.jpg)
City Light P: 067663
Switchgears3766, F:0676
L.L.C. P.O.b63776
box 7450 ,Umm Al Quwain
, UAE