1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf ·...

17
City Light P: 067663 Electrica 1 Metho 1.1 Listin The stud all gover The total power of state dem From the the numb readily o Local info of conne low volta 1.2 Servi This conn 1. Mediu A consum substatio and regu Metering 2. Low Vo The insta metered 1.3 Elect The who A selectio MV/LV m Neutral e related to The distr determin The type disturban 1.4 Prote The earth appropri against h Switchgears 3766, F:0676 l Installation dology ng of power y of a propo ning rules an l power dem f each load, mand, startin ese data, the ber of sourc btained. ormation reg ction arrang age level. ce connectio nection can um Voltage le mertype sub on may be an ulations (the g at medium oltage level allation will b according to rical Distrib le installatio on guide is p main distribu earthing arra o the power ribution equ ned from bu of premises nces. ection again hing system ate protectiv hazards of di L.L.C. P.O.b 63776 ns demands osed electric nd regulatio mand can be together wit ng condition e power requ es necessary garding tarif gement to th on be made at: evel bstation will n outdoor o lowvoltage mvoltage or be connecte o LV tariffs. ution archit on distributio proposed for ution and LV angements a rsupply, and ipment (pan ilding plans s and allocat st electric sh (TT, IT or TN ve devices m rect or indir box 7450 ,Um al installatio ns. calculated f th the know ns, non simu uired from t y for an ade ff structures he powersu : then have t r indoor inst e section ma lowvoltage ed to the loca ecture on network r determinat power distr are chosen a d to the type nel boards, s and from th tion can influ hocks N) having be must be imp rect contact. m Al Quwain on requires a from the dat wledge of the ltaneous op he supply so quate suppl is also requ pply networ to be studied tallation con y be studied is possible i al power net is studied as tion of the m ribution leve according to e of loads. witchgears, e location a uence their i en previous lemented in , UAE an adequate ta relative to e operating m peration, etc ource and (w y to the inst ired to allow rk, e.g. at me d, built and e nforming to r d separately n this case. twork and w s a complete most suitable els are cover local regula circuit conn nd grouping immunity to ly determine order to ac understand o the locatio modes (stea .) where appro tallation are w the best ch edium voltag equipped. T relevant stan if necessary will (necessar e system. e architectu ed. ations, const nections, ...) g of loads. o external ed, then the hieve protec ding of n and dy priate) hoice ge or his ndards y). rily) be re. raints are e ction

Transcript of 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf ·...

Page 1: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

Electrica1 Metho1.1 ListinThe studall goverThe totalpower ofstate demFrom thethe numbreadily oLocal infoof connelow volta1.2 ServiThis conn1. MediuA consumsubstatioand reguMetering2. Low VoThe instametered 1.3 ElectThe whoA selectioMV/LV mNeutral erelated toThe distrdeterminThe typedisturban1.4 ProteThe earthappropriagainst h 

 Switchgears3766,  F:0676

l Installationdology ng of power y of a proponing rules anl power demf each load, mand, startinese data, theber of sourcbtained. ormation regction arrangage level. ce connectionection can um Voltage lemer‐type subon may be anulations (the g at mediumoltage level allation will baccording torical Distrible installatioon guide is pmain distribuearthing arrao the powerribution equned from bu of premisesnces. ection againhing system ate protectivhazards of di

 L.L.C.   P.O.b63776 

ns 

demands osed electricnd regulatiomand can be together witng conditione power reques necessary

garding tarifgement to th

on be made at:evel bstation willn outdoor olow‐voltage

m‐voltage or 

be connecteo LV tariffs. ution architon distributioproposed forution and LV angements ar‐supply, andipment (panilding plans s and allocat

st electric sh(TT, IT or TNve devices mrect or indir

box 7450 ,Um

al installations. calculated fth the knowns, non simuuired from ty for an ade

ff structureshe power‐su

 then have tr indoor inste section malow‐voltage 

ed to the loca

ecture on network r determinatpower distrare chosen ad to the typenel boards, sand from thtion can influ

hocks N) having bemust be imprect contact.

m Al Quwain

on requires a

from the datwledge of theltaneous ophe supply soquate suppl

 is also requpply networ

to be studiedtallation cony be studiedis possible i

al power net

is studied astion of the mribution leveaccording to e of loads. witchgears, e location auence their i

en previouslemented in 

 

, UAE  

an adequate

ta relative toe operating mperation, etcource and (wy to the inst

ired to allowrk, e.g. at me

d, built and enforming to rd separately n this case.

twork and w

s a completemost suitableels are coverlocal regula

circuit connnd groupingimmunity to

ly determine order to ac

 understand

o the locatiomodes (stea.) where approtallation are 

w the best chedium voltag

equipped. Trelevant stanif necessary

will (necessar

e system. e architectued. ations, const

nections, ...) g of loads. o external 

ed, then thehieve protec

ding of 

n and dy 

priate) 

hoice ge or 

his ndards y). 

rily) be 

re. 

raints 

are 

e ction 

Page 2: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

1.5 CircuiEach circuof short‐cof circuit ccablewaysBefore adbe satisfie• The volt• Motor s• ProtectiThe shortwithstandThese calcthan the sThe perfocharacterThe use otripping o1.6 ProtecDirect or iof severalover‐voltaand soluti1.7 EnergImplemenwithin thereduced pequipmen1.8 ReactThe poweglobally o1.9 HarmoHarmonicdisturbanequipmenorigins anthe soluti1.10 PartiParticular• Specific • Specific LV/LV tran• Specific 

 Switchgears3766,  F:0676

ts and switchuit is then stucircuit currentconductors cas and their indopting the coed: tage drop comstarting is satiion against el‐circuit curred capability ofculations maysize originallyormance requistics. of cascading teof circuit breaction againstindirect lightnl kilometers. Oage can also pions are propy efficiency intation of mee electrical inpower consumnt. ive energy er factor correor as a combinonics cs in the netwces as overlont, of local arend the effects ons. icular supply r items or equsources suchloads with spnsformers systems, suc

 L.L.C.   P.O.b63776 

hgear died in detailt, and the typan be determfluence on thonductor size

mplies with thisfactory ectric shock int Isc is then f the circuit isy indicate thay chosen. uired by the sw

echniques ankers are examt over‐voltagening strokes cOperating voproduce the sposed. n electrical deasuring devicstallation canmption, reduc

ection within nation of both

work affect theoads, vibrationea networks, of harmonics

sources and uipment are h as alternatopecial charact

ch as direct‐cu

box 7450 ,Um

l. From the rape of protectivmined, taking he current rat indicated ab

he relevant st

is assured determined, s checked. at it is necessa

witchgear wil

d the discrimmined. es can damage eltage surges, same consequ

distribution ces with an adn produce higced cost of en

electrical insh methods. 

e quality of ens, ageing of telephone nes and explain

loads studied: ors or inverterteristics, such

urrent netwo

m Al Quwain

ated currents ve device, theinto account ting of condubove, the follo

tandard 

and the ther

ary to use a c

ll determine i

minative opera

electrical equtransient anduences. The e

dequate comgh benefits fonergy, better 

tallations is c

nergy and areequipment, tetworks. This how to meas

rs h as induction

rks 

 

, UAE  

of the loads,e cross‐sectiothe nature ofctors. owing require

rmal and elect

conductor size

its type and 

ation of fuses

ipment at a dd industrial freffects are ex

munication sr the user or use of electr

carried out loc

e at the origintrouble of sens chapter deasure them an

n motors, ligh

 the level onal area f the 

ements must 

trodynamic 

e larger 

s and 

distance requency amined 

system owner: ical 

cally, 

n of many nsitive ls with the nd present 

ting circuits oor 

Page 3: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

1.11 GenCertain pcommon1.12 EMCSome baNon obsethe electof protec1.13 UseIt provideand recoThe follo• Constru• Calcula• Calcula• Optimi• Require• Discrim• Recom• Verifica• Compre  

 

 

 

 

 

 

 

 

 

 Switchgears3766,  F:0676

neric applicapremises andn example beC Guidelinessic rules muervance of thtrical installaction devicese Of Electricaes a completmmendatiowing featureuction of onation of shoration of voltazation of cabed ratings ofmination of pmendationsation of the ehensive pri

 L.L.C.   P.O.b63776 

ations d locations aeing residents st be followhese rules mation: disturbs, and even dal Design Softe design pans. es are include‐line diagrart‐circuit curage drops ble sizes f switchgearprotective des for cascadinprotection oint‐out of th

box 7450 ,Um

are subject totial dwelling

ed in order tmay have serbance of comdestruction ftware ackage for LV

ded: ams rents 

r and fuse‐unevices ng schemesof people e foregoing 

m Al Quwain

o particularlgs. 

to ensure Elrious conseqmmunicationof sensitive 

V installation

nits 

calculated d

 

, UAE  

ly strict regu

ectromagnequences in thn systems, ndevices. 

ns, in accord

design data

ulations: the 

etic Compatihe operationnuisance trip

dance with IE

most 

bility. n of pping 

EC standardss 

Page 4: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

2 Rules aLow‐voltmay be c• Statuto• Codes o• Nationa• Nationa2.1 ReguIn most cissued byaccount t2.2 StandThis Guidestablishexperienare the fuIEC 6003IEC 6007IEC 6007air IEC 6007IEC 6007IEC 6014convertoIEC 6025IEC 6026less thanIEC 6026IEC 6026persons (IEC 6028IEC 6028(100% loIEC 6036IEC 6036IEC 6036electric sIEC 6036thermal eIEC 6036over‐curr

 Switchgears3766,  F:0676

and statutortage installaclassified as ory regulatioof practice, al and internal and internlations countries, ely National Athese local cdards de is based ohed by medicce at an inteundamental8 Standard v6‐2 Power t6‐3 Power t

6‐5 Power t6‐10 Power 6 Semicondors 5 Electrical r5‐1 High‐voln 52 kV 9‐1 Low‐volt9‐2 Low‐volt(fuses mainl2‐1 High‐vol7‐1‐1 Electriad factor) an4 Electrical i4‐1 Electrica4‐4‐41 Electshock 4‐4‐42 Electeffects 4‐4‐43 Electrent 

 L.L.C.   P.O.b63776 

ry regulationtions are gofollows: 

ons (decrees,regulations national stannational stan

ectrical instauthorities orconstraints b

on relevant Ical and enginernational les of most elvoltages ransformersransformers

ransformerstransformeructor conve

relays ltage switch

tage fuses ‐ tage fuses ‐ y for househltage fuses ‐ic cables ‐ Cand calculatioinstallationsal installationtrical installa

trical installa

trical installa

box 7450 ,Um

ns overned by a

, factory actissued by prndards for inndards for p

allations shar by recognizbefore starti

EC standardneering expeevel. Currentectrical stan

s ‐ Temperats ‐ Insulation

s ‐ Ability to rs ‐ Determirtors ‐ Gene

es ‐ High‐vo

General reqSupplementhold and sim‐ Current‐limalculation ofon of losses ‐ of buildingsns of buildinations of bui

ations of bui

ations of bui

m Al Quwain

a number of

s, etc.) rofessional innstallationsroducts 

all comply wzed private bng the desig

ds, in particuerts of all cotly, the safetndards in the

ture rise n levels, diele

withstand snation of soeral requirem

ltage switch

quirementstary requiremilar applicatmiting fusesf the current‐ General s ngs ‐ Fundamldings ‐ Prot

ldings ‐ Prot

ldings ‐ Prot

 

, UAE  

f regulatory 

nstitutions, j

ith more thabodies. It is gn. 

ular IEC 6036ountries in thty principles e world (see 

ectric tests a

hort‐circuitund levels ments and lin

hes for rated

ments for futions) 

t rating ‐ Cur

mental princitection for sa

tection for sa

tection for sa

and advisor

job specifica

an one set oessential to 

64. IEC 60364he world comof IEC 6036table below

and external

ne commuta

 voltages ab

uses for use 

rrent rating 

iples afety ‐ Prote

afety ‐ Prote

afety ‐ Prote

ry texts, whi

ations 

f regulationstake into 

4 has beenmparing thei4 and 60479

w ) 

l clearances 

ated 

bove 1 kV an

by unskilled

equations 

ection agains

ection agains

ection agains

ich 

s, 

ir 9‐1 

in 

 

st 

st 

st 

Page 5: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

IEC 6036electromIEC 6036equipmeIEC 6036equipmeIEC 6036equipmeIEC 6036equipme 

IEC 6036equipmeIEC 6036IEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locations

 Switchgears3766,  F:0676

4‐4‐44 Electmagnetic and4‐5‐51 Electent ‐ Commo4‐5‐52 Electent ‐ Wiring s4‐5‐53 Electent ‐ Isolation4‐5‐54 Electent ‐ Earthing

4‐5‐55 Electent ‐ Other e4‐6‐61 Elect4‐7‐701 Elecs ‐ Locations 4‐7‐702 Elecs ‐ Swimming4‐7‐703 Elecs ‐ Locations 4‐7‐704 Elecs ‐ Construct4‐7‐705 Elecs ‐ Electrical 4‐7‐706 Elecs ‐ Restrictive4‐7‐707 Elecs ‐ Earthing r4‐7‐708 Elecs ‐ Electrical 4‐7‐709 Elecs ‐ Marinas a4‐7‐710 Elecs ‐ Medical lo4‐7‐711 Elecs ‐ Exhibition4‐7‐712 Elecs ‐ Solar phot4‐7‐713 Elecs ‐ Furniture 

 L.L.C.   P.O.b63776 

trical installad voltage disttrical installaon rules trical installasystems trical installan, switching trical installag arrangeme

trical installaquipments trical installactrical instalcontaining actrical instalg pools and ctrical instalcontaining sctrical instaltion and demctrical instalinstallationsctrical instale conductingctrical instalrequirementctrical instalinstallationsctrical instaland pleasurectrical instalocations ctrical instalns, shows anctrical instaltovoltaic (PVctrical instal

box 7450 ,Um

ations of buiturbance ations of bui

ations of bui

ations of buiand control

ations of buients 

ations of bui

ations of builations of bua bath tub olations of buother basinslations of busauna heatelations of bumolition site lations of bus of agricultulations of bug locationslations of buts for the inslations of bus in caravan lations of bue craft lations of bu

lations of bud stands lations of buV) power suplations of bu

m Al Quwain

ldings ‐ Prot

ldings ‐ Sele

ldings ‐ Sele

ldings ‐ Selel ldings ‐ Sele

ldings ‐ Sele

ldings ‐ Verifuildings ‐ Reqor shower bauildings ‐ Reqs uildings ‐ Reqers uildings ‐ Reqinstallationsuildings ‐ Requral and hortuildings ‐ Req

uildings ‐ Reqstallation of uildings ‐ Reqparks and cauildings ‐ Req

uildings ‐ Req

uildings ‐ Req

uildings ‐ Reqpply systemsuildings ‐ Req

 

, UAE  

tection for sa

ction and er

ction and er

ction and er

ction and er

ction and er

fication andquirements asin quirements 

quirements 

quirements s quirements ticultural prequirements 

quirements data procesquirements aravans quirements 

quirements 

quirements 

quirements s quirements 

afety ‐ Prote

rection of ele

rection of ele

rection of ele

rection of ele

rection of ele

 testing ‐ Inifor special in

for special in

for special in

for special in

for special inemises for special in

for special insing equipmfor special in

for special in

for special in

for special in

for special in

for special in

ection agains

ectrical 

ectrical 

ectrical 

ectrical 

ectrical 

tial verificatnstallations 

nstallations 

nstallations 

nstallations 

nstallations 

nstallations 

nstallations ment nstallations 

nstallations 

nstallations 

nstallations 

nstallations 

nstallations 

st 

tion or 

or 

or 

or 

or 

or 

or 

or 

or 

or 

or 

or 

or 

Page 6: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

IEC 6036locationsIEC 6036locationsIEC 6036locationsIEC 6036locationsfairgrounIEC 6042IEC 6043type‐testIEC 6043busbar trIEC 6043low‐voltaunskilledIEC 6043assembliIEC 6044IdentificaIEC 6043assembli(CDCs) IEC 6047IEC 6047 

IEC 6047through tIEC 6052IEC 6064IEC 6066IEC 6071rails for mIEC 60721.2 kV) aIEC 6075IEC 6078circuit apIEC 6083

 Switchgears3766,  F:0676

4‐7‐714 Elecs ‐ External li4‐7‐715 Elecs ‐ Extra‐low4‐7‐717 Elecs ‐ Mobile or4‐7‐740 Elecs ‐ Temporarnds, amusem7 High‐volta9‐1 Low‐voltted assembl9‐2 Low‐voltrunking syste9‐3 Low‐voltage switchged persons hav9‐4 Low‐voltes for const6 Basic and ation of cond9‐5 Low‐voltes intended

9‐1 Effects o9‐2 Effects o

9‐3 Effects othe body of 9 Degrees o4 Specificati4 Insulation 5 Dimensionmechanical s4 Short‐circund 3 kV (Um5 General re7 Applicatiopplication 1 Shunt pow

 L.L.C.   P.O.b63776 

ctrical instalighting instactrical instal‐voltage lighctrical instalr transportabctrical instalry electrical ment parks aage alternatitage switchgies tage switchgems (buswatage switchgear and contve access fotage switchgruction sitessafety princductors by ctage switchg to be instal

of current onof current on

of current onlivestock 

of protectionion for high‐coordinations of low‐vosupport of euit temperatm = 3.6 kV) equirementson guide for t

wer capacito

box 7450 ,Um

lations of buallations lations of buhting installalations of buble units lations of buinstallationsnd circusesng current cgear and con

gear and conys) gear and controlgear asseor their use ‐gear and cons (ACS) iples for macolours or nugear and conled outdoor

n human bein human bei

n human bei

n provided by‐voltage fuseon for equipmltage switchlectrical devture limits o

s for residuathe selection

ors of the sel

m Al Quwain

uildings ‐ Req

uildings ‐ Reqations uildings ‐ Req

uildings ‐ Reqs for structur

circuit‐breakntrolgear ass

ntrolgear ass

ntrolgear assemblies inteDistributionntrolgear ass

n‐machine iumerals ntrolgear assrs in public p

ings and liveings and live

ings and live

y enclosurese‐links for mment withinhgear and covices in switcof electric ca

l current opn of fuse‐lin

f‐healing typ

 

, UAE  

quirements 

quirements 

quirements 

quirements res, amusem

kers semblies ‐ Ty

semblies ‐ Pa

semblies ‐ Panded to be in boards semblies ‐ Pa

nterface, ma

semblies ‐ Paplaces ‐ Cable

estock ‐ Geneestock ‐ Spec

estock ‐ Effec

s (IP code) otor circuit  low‐voltagentrolgear. Stchgear and cbles with rat

erated proteks of high‐vo

pe for AC sys

for special in

for special in

for special in

for special inment devices

ype‐tested a

articular req

articular reqinstalled in p

articular req

arking and id

articular reqe distributio

eral aspects cial aspects 

cts of curren

applicationse systems tandardizedcontrolgear ted voltages

ective deviceoltage fuses 

stems havin

nstallations 

nstallations 

nstallations 

nstallations s and booths

and partially

quirements f

quirements fplaces where

quirements f

dentification

quirements fn cabinets 

nts passing 

 mounting oinstallationss of 1 kV (Um

es for transfor

g a rated 

or 

or 

or 

or s at 

for 

for e 

for 

n ‐ 

for 

on s. m = 

rmer 

Page 7: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

voltage uand ratinIEC 6094IEC 6094IEC 6094switchdisand fuse‐IEC 6094ElectromIEC 6094AutomatIEC 6100IEC 6114equipmeIEC 6155DC ‐ EquirequiremIEC 6155DC ‐ EquiIEC 6155DC ‐ EquiIEC 6155requiremIEC 6227IEC 6227circuit‐brIEC 6227and earthIEC 6227combinaIEC 6227switchgeIEC 62272.3 QualiIn so far only if: • The initregulatio• The ele• The pemanufac

 Switchgears3766,  F:0676

up to and incng ‐ Safety re7‐1 Low‐volt7‐2 Low‐volt7‐3 Low‐voltsconnectors‐combinatio7‐4‐1 Low‐v

mechanical co7‐6‐1 Low‐vtic transfer s0 Electroma0 Protectionent 7‐1 Electricaipment for tments 7‐8 Electricaipment for t7‐9 Electricaipment for i8‐2‐6 Safety

ments for saf1‐1 Commo1‐100 High‐vreakers 1‐102 High‐vhing switche1‐105 High‐vtions 1‐200 High‐vear and contr1‐202 High‐vity and safetas control p

tial checkingon has been ectrical equipriodic checkturer is resp

 L.L.C.   P.O.b63776 

cluding 1000equirementstage switchgtage switchgtage switchg

on units oltage switcontactors anoltage switcwitching eqagnetic compn against ele

al safety in loesting, mea

al safety in loesting, meaal safety in lonsulation fay of power trfety isolatingn specificativoltage swit

voltage swites voltage swit

voltage switrolgear for rvoltage/lowty of an elecprocedures a

g of conformachieved pment compking of the inpected. 

box 7450 ,Um

0 V ‐ Generas ‐ Guide for gear and congear and congear and con

chgear and cnd motor‐stachgear and cuipment patibility (EMectric shocks 

ow‐voltage dsuring or mo

ow‐voltage dsuring or moow‐voltage dult location ransformersg transformeons for hightchgear and 

tchgear and 

tchgear and 

tchgear and rated voltagew voltage prectrical instalare respecte

mity of the el

ply with stannstallation re

m Al Quwain

l ‐ Performainstallation ntrolgear ‐ Gntrolgear ‐ Cntrolgear ‐ S

controlgear ‐arters controlgear ‐

MC) ‐ common a

distribution onitoring of 

distribution onitoring of distribution in IT system, power supers for generh‐voltage swcontrolgear 

controlgear 

controlgear 

controlgear es above 1 kefabricated sllation ed, quality a

ectrical insta

ndards ecommende

 

, UAE  

nce, testingand operati

General rulesCircuit‐breakwitches, dis

‐ Contactors

‐ Multiple fu

aspects for i

systems up protective m

systems up protective msystems up s ply units andral use itchgear and‐ High‐volta

‐ Alternatin

‐ Alternatin

‐ AlternatinkV and up to substations

nd safety w

allation with

d by the equ

on s ers connectors, 

 and motor‐

unction equip

nstallation a

to 1000 V Ameasures ‐ G

to 1000 V Ameasures to 1000 V A

d similar ‐ Pa

d controlgeaage alternati

g current di

g current sw

g current mand includin

will be assure

h the standa

uipment 

‐starters ‐ 

pment ‐ 

and 

C and 1500 VGeneral 

C and 1500 V

C and 1500 V

articular 

ar standardsng‐current

sconnectors

witch‐fuse 

etal‐encloseng 52 kV 

ed 

rd and 

ed 

Page 8: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

2.4 InitiaBefore a electricasatisfied.regulatioall such rsafety rustandardintendedrequired howeverrelated torequirem• The prebuildings• Insulatiphases a• Continuconducto• Resista• Verifica• Check o• Cross‐sprevailininstallatio• Verifica(where a• Check oThese tesnumerouexampleon class 2attentionessentialensure samodifiedto satisfy2.5 ConfoinstallatiAttestatiThe conf

 Switchgears3766,  F:0676

al testing of utility will cl tests and v. These testsons, which mregulations hles in the deds included ind to cover allfor resident

r have additio a particulaments are bee‐commissios include, typion tests of and betweenuity and conors nce tests of ation of the of allowablesectional‐areg, taking accon conditionation that alppropriate) of clearancests and checus other test: TN‐, TT‐ or 2 insulation,n to the part rules to be afe and troud if necessaryy all pre‐comormity (withion ion of confoformity of eq

 L.L.C.   P.O.b63776 

an installationnect an inisual inspects are made amay differ slighowever, areesign and rean this guide l the safety mtial, commeronal regulatar product (pyond the scooning electricpically, all ofall cable andn phases andnductivity tes

earthing eleproper opere number of ea check of acount of thens (in air, conl exposed‐ a

e distances incks are basicts and rules aIT‐earthed i, SELV circuitticular featurobserved inuble‐free pery to comply mmissioning th standards 

ormity quipment w

box 7450 ,Um

ion nstallation totions by the according to ghtly from oe common, aalization of tare based omeasures anrcial and (thtions petroleum, cope of this gcal tests andf the followind wiring condd earth sts of protec

ectrodes witration of thesocket‐outleall conducto associated nduit, etc.)nd extraneo

n bathroomsc (but not exare includedinstallationsts, and specires of differe order to acrformance. Twith any potest and inspand specific

with the relev

m Al Quwain

o its supply nauthority, olocal (gover

one country tand are basethe installatin an internand approvede majority o

coal, naturalguide. d visual‐inspng: ductors of th

ctive, equipo

th respect toe interlocks, ets per circurs for adequprotective d

ous metallic 

s, etc. haustive) tod in the regu, installationial locationsent types of hieve a satisThe methodsossible variatpection requcations) of e

vant standa

 

, UAE  

network, stror by its appornmental anto another. Ted on the obion. IEC 6036ational consed installationof) industrial 

 gas, etc.). S

ection check

he fixed inst

otential and 

o remote earif any it uacy at the sdevices, mate

parts are pr

 the majoritlations to cons based , etc. The aiminstallation,sfactory leves recommention imposeduirements.equipment u

rds can be a

rict pre‐commointed agentd/or institutThe principlbservance of64‐6‐61 andensus for suc practices nobuildings. M

Such addition

ks for install

allation, bet

earth‐bondi

rth 

hort‐circuit erials and 

operly earth

y of installatover particul

m of this gui, and to indiel of quality, nded in this gd by a utility

used in the 

attested: 

missioningt, must be tional) es of f rigorous  related ch tests, ormally Many industr

nal 

ations in 

tween 

ing 

levels 

hed 

tions, whilelar cases, for

ide is to drawcate the which willguide, y, are intend

ries 

ed 

Page 9: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

• By an o• By a ce• By a deThe first  DeclaratWhere thdeclaratias a validof conforNote: CEIn Europeto affix th• The pro• It is preThe CE mMark of Marks ofnon instrdeliveredstandardCertificatThe standsituationAssurancA laboratthese tesdestroyefabricatethe charadeclaraticertificatassuring control sare issuestandardcontrol c• Model • Model manufacfuses wh

 Switchgears3766,  F:0676

official mark rtificate of ceclaration oftwo solution

ion of confohe equipmenon of conford attestationrmity can re marking e, the Europhe CE markinoduct meetsesumed to bmarking is neconformity f conformity ructed peopd by certificad and after vetion of Qualdards defines rather thace tory for teststs are calleded (tests on fed products hacteristics ston or tion of confothe quality oystem whiched by organizd ISO 9001: 2correspondin3 defines as2 includes, ituring proceere perform

 L.L.C.   P.O.b63776 

of conformiconformity isf conformity ns are gener

ormity nt is to be usrmity (includn. Where theinforce the m

pean directivng on his ows the legal ree marketableither a mar

are affixed le (e.g in theation body iferification olity e several men to differen

ing samples d type tests. fuses, for exahave, in facttated. Qualit

ormity. As prof productioh monitors tzations spec2000. These ng to differessurance of qin addition tess. For exammance charac

box 7450 ,Um

ity granted bssued by a cfrom the mrally not ava

sed by skilleded in the tee competencmanufacture

ves require twn responsibequirementsle in Europerk of origin n

on appliancee field of domf the equipmof the manuf

ethods of qunt levels of q

cannot certIn some tesample). Onlyt, ty assurance

roof that all on, the manuthe fabricatioializing in qustandards dnt situationsquality by ino checking omple, this mcteristics can

m Al Quwain

by the certifertification anufacturerilable for hig

d or instructechnical docce of the maer’s declarat

he manufacbility. It meas 

nor a mark o

es and equipmestic appliament meet thfacturer’s qu

ality assuranquality. 

tify the confosts for confoy the manuf

e certification

the necessaufacturer obon of the prouality controefine three s rather thanspection andof the final pethod is appnnot be chec

 

, UAE  

ication bodybody, or r gh voltage e

ted persons,umentationnufacturer ition. 

turer or his ns that: 

of conformit

pment geneances). A mahe requiremuality manag

nce which co

ormity of anrmity to stafacturer can 

n is intended

ry measuresbtains certificoduct conceol, and are bamodel systen to differend checking oproduct, veriplied, to the cked withou

y concerned,

quipment. 

, the manufa), is generallis in doubt, a

authorized r

ty. 

rally used byark of confoents from angement syste

orrespond to

n entire prodndards, the certify that 

d to complet

s have been cation of theerned. Theseased on the ems of qualitnt levels of qof final produification of tmanufacturut destroying

, or 

acturer’s ly recognizeda certificate

representati

y ordinary rmity is n applicableem. 

o different 

duction run:samples arethe 

te the initial

taken for e quality e certificatesinternationaty assuranceuality: ucts. he rer of g the 

ive 

 

s al e 

Page 10: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

fuse. • Model of the deintendedspecifica 2.6 EnvirEnvironmrequirembut can adesign soobjectivereducingthis purpmaterialscycle (froraw mateDirective• RoHS D(the com1st, 2006cadmiumdiphenyl • WEEE DAugust 2date is Ahouseholegislatiofavour ofsustainabinstallatiotaking intstructureimpacts (    

 

 Switchgears3766,  F:0676

1 corresponesign processd to fabricatetion). 

ronment mental manaments given ialso be grantometimes cae of designin their enviropose lead to s taking intoom extractioerials to scraes have beenDirective (Reming into forc6) aims to elim, hexavalenethers (PBDDirective (W005 (the comugust 13th, ld and non hon will followf products ecble developmon. Actually,to account oe (switchboa(raw materia

 L.L.C.   P.O.b63776 

nds to modes must be rige and test a 

agement sysin ISO 14001ted to placesalled “eco‐deng products/onmental imchoose equio account theon of ap) i.e. produn published, striction of Hce was on Feiminate fromnt chromiumDE). Waste of Electming into fo2005) in ordhousehold ew the same oco‐design, thment can be, it has beenoperation coards, buswayal depletion,

box 7450 ,Um

l 2, but withgorously scrprototype (c

tems can be1. This type os where proesign” is an a/services besmpact over thipment’s arce influence o

uction, transthey are calHazardous Sebruary 13thm products s, polybromin

trical and Elerce was on Fder to mastequipment. Inobjectives. Inhe contribute significantlyn shown thatonditions, Mys, cables), c, energy dep

m Al Quwain

 the additioutinized; forcase of a cus

e certified byof certificatioducts are deapproach of st meeting thheir whole lifchitecture toof a product 

sport, distribled: Substances) ch, 2003, andsix hazardounated biphe

ectronic EquFebruary 13ter the end ofn other partn addition totion of the wy improved tt an optimiseV/LV substaan reduce spletion, end 

 

, UAE  

nal requiremr example, wstom‐built p

y an indepenon mainly coesigned. A pf sustainablehe customerfe cycle. Theogether withon the envi

bution, end o

coming into  the applicats substancenyls (PBB) o

uipment) comth, 2003, anf life and trets of the woro manufactuwhole electrithrough theed design oftions locatioubstantially of life) 

ment that thwhere it is noroduct made

ndent body ioncerns induroduct envire developmers’ requireme methodoloh componentronment alo

of life etc. In

force on Jultion date is Js: lead, meror polybromi

ming into fod the applicatments for rld some newrers action ical installati design of thf the installaon and distrienvironmen

e quality ot e to 

f they meetustrial settinronmental ent with theents whileogies used fots and ong its life 

n Europe two

ly 2006 July cury, nated 

rce in ation 

w in ion to he tion, bution ntal 

ngs 

or 

Page 11: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

3 Installe3.1 InducCurrent dThe full‐l• 3‐phase• 1‐phasewhere � Ia: cur� Pn: no� U: volt� for sin� or pha� η: per‐� cos  : Subtrans• Subtrantimes the• Merlin designedpeak valu• If unexmeans thswitchgedevices cswitchgeMotor stAlthoughcurrents static sof(ExampleCompensIt is genesupplied power oumotors isAs discussignificanmeans a Compensperiods aAs noted

 Switchgears3766,  F:0676

ed power loaction motordemand load currente motor: Ia =e motor: Ia =

rent demanminal powetage betweegle‐phase mase‐to‐phase‐unit efficienpower factosient currentnsient curree rms rated vGerin circuid to withstanue can be uppected tripphe starting cear withstandcan be destroear must be ctarting curreh high efficieare roughly ft start unit oe : 4 Ia insteasation of reaerally advantto inductionutput of the s generally rssed in chaptntly reducedcorrespondsation of reaat reduced pd above cos 

 L.L.C.   P.O.b63776 

ads – Characs 

t Ia supplied= Pn x 1,000= Pn x 1,000

d (in amps) r (in kW) en phases fomotors (in voe. ncy, i.e. outpor, i.e. kW int and protecnt peak valuvalue Inm. St‐breakers, Tnd motor stap to 19 timesping of the ourrent exceeds can be reoyed. In ordconsidered. ent ency motors the same asor variable sad of 7.5 Ia).active‐powetageous for tn motors. Thmotors. Theeferred to ater L, the apd by the use ing reductioactive‐powepower.  = kW inpu

box 7450 ,Um

cteristics 

d to the mot / (√3 x U x η / (U x η x co

r 3‐phase mlts). A single

put kW / inpnput / kVA inction settingue can be veSometimes tTelemecaniqarts with vers the rms ratvercurrent peds the normached, life ter to avoid s

can be founs some of staspeed drive a. r (kvar) supptechnical anhis can be ace applications “power‐fapparent powof shunt‐conon of input cur is particula

t/kVA input

m Al Quwain

tor is given bη x cos  ) os  ) 

otors and voe‐phase mot

ut kW nput g ry high ; typhis value canque contactory high subtrted value Inprotection omal limits. Asime can be rsuch a situat

nd on the maandard motoallows to red

plied to indud financial rchieved by un of this princtor improver (kVA) supnnected capurrent (sincearly advised 

 

, UAE  

by the follow

oltage betweor may be c

ical value is n reach 25 tors and therransient currm). occurs durings a result, soreduced andtion, oversiz

arket, in praors. The useduce the val

uction motoreasons to resing capacitnciple to the ement” or “pplied to an pacitors. Rede the voltagefor motors t

wing formul

een the termonnected ph

about 12 toimes Inm. rmal relays arent (subtran

g starting, thome maximud even somezing of the 

ctice their ste of start‐delue of the sta

rs educe the cuors without operation o

“power‐factoinduction mduction of inpe remains cothat operate

ae: 

minals hasetoneutr

o 15 

are nsient 

his um e 

tarting ta starter, arting curren

urrent affecting thof inductionor correctionmotor can beput kVA onstant). e for long 

ral 

nt 

n”. 

Page 12: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

so that a The curreI = Ia cos where coafter com 

 Switchgears3766,  F:0676

kVA input rent supplied/ cos  ’ 

os   is the pompensation, 

 L.L.C.   P.O.b63776 

eduction in d to the moto

ower factor Ia being the

box 7450 ,Um

kVA input wor, after pow

before come original cur

m Al Quwain

will increase wer‐factor co

pensation arrent. 

 

, UAE  

(i.e. improveorrection, is 

nd cos  ’ is 

e) the value given by: 

the power f

of cos   

factor 

Page 13: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

 Switchgears3766,  F:0676

 L.L.C.   P.O.b63776 

box 7450 ,Umm Al Quwain

 

, UAE  

 

Page 14: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

 

 

 

 Switchgears3766,  F:0676

 L.L.C.   P.O.b63776 

box 7450 ,Umm Al Quwain

 

, UAE  

 

Page 15: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

 Switchgears3766,  F:0676

 L.L.C.   P.O.b63776 

box 7450 ,Umm Al Quwain

 

, UAE  

 

Page 16: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

 

 

 

 

 Switchgears3766,  F:0676

 L.L.C.   P.O.b63776 

box 7450 ,Umm Al Quwain

 

, UAE  

 

Page 17: 1 Methodology 1.1 Listin g of power demandsclswitchgears.com/pdf/Electrical Installations.pdf · 2015. 6. 12. · the power ibution equ ed from bu of premises ces. ction again ing

City Light P: 067663

 Switchgears3766,  F:0676

 L.L.C.   P.O.b63776 

box 7450 ,Umm Al Quwain

 

, UAE