1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003...

24
1 Karnataka Power Corporation Limited

Transcript of 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003...

Page 1: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

1

Karnataka Power Corporation Limited

Page 2: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

2

Hydro-thermal mixALL INDIA – 106111 MW as on 1.4.2003

KARNATAKA 6539 MW

1.4.2003

(KPCL+VVNL+IPP+CGS)Hydel, 26443 MW,

24.92%

Nuclear, 2860 MW,

2.70%

Wind, 1507 MW,

1.42%

Thermal 75301 MW,

70.96%

Thermal, 3215 MW,

49.17%

Wind, 96.7 MW,

1.48%

Hydel, 3227 MW,

49.35%

Page 3: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

3

Installed Capacity of Karnataka

Private - 999 MW15.28%

VVNL - 349 MW

5.34%

KPCL - 4350.505

MW66.54%

Central - 840 MW12.85%

Thermal - 1470 MW33.79%

Hydel-2875.95 MW

66.11%

Wind -4.555 MW

0.10%

Installed Capacity of Karnataka-6539mw

Hydro-Thermal Mix of KPCL--Total capacity 4350.505mw

4

Page 4: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

4

INSTALLED CAPACITY

Thermal

Hydel

Wind

Total

KPCL

1470

2875.95

4.55

4350.50

VVNL

128

221

-

349

Central

840

-

-

840

Private

776.90

130.02

92.20

999.12

Total

3215

3227

97

6539

Total non-conventional : 440 MW

(wind+mini hydel+biomass+cogeneration)

Page 5: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

5

Growth in Installed Capacity - KPCL

924.20

1519.20

2916.153126.15

1470

1260

1260

1260

1050

840

630

420

420

210

2880

.51

2862

.98

2607

.98

1789

.20

1889

.20

2019

.00

2286

.15

2286

.15

2567

.98

2682

.98

2439.00

746.00

3617.98

3942.98 4122.983867.98

4350.505

1999.202309.20

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

Inst

alle

d ca

paci

ty in

meg

a w

atts

Thermal

Hydel (including windfarm of 4.555 MW)Total

Page 6: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

6

Performance of KPCL Stations Apr - Sep (2003 - 04)

2003- 04 2002-03

Total Generation (MU) 8912 8400

Thermal (MU) 5434 5041

Hydel (MU) 3467 3352

Wind Farm (MU) 10.883 7.081

RTPS PLF 84.16 % 91.09%

Page 7: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

7

List of projects executed (MW)RTPS - 7X210 = 1470 THERMALSharavathy-10x 103.5 = 1035

Linganamakki-2x27.5 = 55

Nagjhari-3x150+3x135 = 855

Supa-2x50 = 100

Varahi-2x115 = 230

Mani Dam-2x4.5 = 9

Ghataprabha-2x16 = 32 HYDEL

Mallapur-2x4.5 = 9

Mini hydel = 1.75

Bhadra = 39.2

Kadra 3x50 = 150

Kodasalli 3x 40 = 120

Gerusoppa 4 x 60 = 240

Total hydel = 2875.95Kappatagudda - = 4.555 WIND

Grand total = 4350.505

Page 8: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

8

Particulars 97-98 98-99 99-00 00-01 01-02 02-03 03-04

(30.9.03)

Generation 5538 6013 7762 8904 8954 10292 5433

(MU)

P L F (%) 75.26 81.72 81.52 80.67 81.12 90.39 84.16

Av. Factor 88.60 90.44 87.41 87.63 84.78 92.39 86.47

Aux. Cons % 8.26 8.21 8.00 8.15 8.53 8.50 8.68

Sp.Coal Cons. 0.711 0.706 0.713 0.678 0.637 0.642 0.66(kg/kwh)Station heat rate 2720 2589 2544 2486 2498 2504 Sp. Oil Cons. 0.771 1.09 1.237 1.546 1.084 0.668 0.7

(ml/kwh)

PLF - National average - 72% CEA norms for 210 MW units, aux. consumption - 9.5%

spec. oil consumption - 3.5 ml/kwh

Performance of RTPS

Page 9: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

9

Particulars 97-98 98-99 99-00 00-01 01-02 02-03 03-04

(30.9.03)

Generation

( Million Units) 10350 9858 11711 10544 9268* 6846** 3469

Total inflows (TMC) 341 282 323 307 208 192 182

Av. Factor % 89.12 89.95 89.16 92.64 87.34# 85.35# 86.38

Aux. Cons % 1.22 1.07 1.10 1.06 0.94 1.19 --

Performance of Hydro stations

* due to poor monsoon; ** due to worst monsoon # units under R&M

Page 10: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

10

Employees positionCapacity

in mwsCorporate

in Nos.Workmen

in Nos.Total

in Nos.

Hydro 2881 2604 3785 3785

Thermal 1470 808 1582 2390

Corporate office

-- 435 251 686

Total 6811

Page 11: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

11

DETAILS OF O&M EXPENDITURE, AND ESTABLISHMENT EXPENSES (IN RS CRORES)

Year O&M expenditureEstablishment

expenses

  Hydro RTPS Total  

93-94 9.80 9.81 19.61 60.66

94-95 6.03 6.41 12.44 71.29

95-96 8.42 18.77 27.19 96.90

96-97 9.08 22.85 31.93 114.03

97-98 9.30 27.17 36.47 116.44

98-99 8.93 27.28 36.21 133.55

99-00 13.61 29.60 43.21 194.41

00-01 12.53 32.95 45.48 253.86

01-02 11.37 38.69 50.06 256.88

02-03  12.09 44.46   56.55  231.22

03-04 5.22 22.52 27.74 196.43

Page 12: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

12

Annual availability factor of generating stations in %Hydel Station 96-97 97-98 98-99 99-00 00-01 01-02 02-03

SGS 81.02 90.79 90.28 93.50 93.88 90.92 92.21

LPH 87.90 93.80 92.28 98.51 95.24 99.00 87.35

Bhadra 73.77 74.52 92.44 91.94 90.71 75.47 81.85

NPH 83.36 87.01 88.68 83.61 91.50 81.35 75.20

SPH 96.75 75.37 84.10 87.19 87.03 88.05 94.71

VUGPH 97.42 95.10 92.39 88.52 92.81 90.00 90.00

MDPH 85.00 94.63 84.30 90.39 84.23 86.21 81.23

GDPH 99.46 99.57 95.77 99.07 86.56 81.74 90.31

Kadra   86.42 98.34 83.74 93.85 91.77 86.48

KODASALLI     78.46 91.59 90.75 92.10 94.59

GERUSOPPA           84.10 75.33

AVERAGE HYDRO 84.49 89.12 89.95 89.16 92.48 87.34 85.35

AVERAGE Thermal 85.73 88.21 90.44 87.41 87.63 84.61 92.39

Kappatagudda wind farm

    91.35 88.71 99.38 98.65  

Page 13: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

13

Sharavathi & LinganamakkiO&M cost (Rs Lakhs)

Item 95-96 96-97 97-98 98-99 99-00 00-01 01-02

Employee cost 1371.62 1697.98 1904.84 1862.39 2314.26 2358.90 2516.48

Administrative & Misc. exp 73.81 50.84 92.67 92.74 97.45 126.84 163.19

Operation & Maintenance Expenses 632.55 421.23 409.69 396.22 528.74 415.11 337.26

Corporate Office Exp allocated 436.38 434.01 361.08 540.81 940.94 1798.53 1749.82

TOTAL 2514.36 2604.06 2768.28 2892.16 3881.39 4699.38 4766.75

Page 14: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

14

Nagjhari & Supa- O&M cost

  ITEM 95-96 96-97 97-98 98-99 99-00 00-01 01-02

1 Employee cost 1848.67 2068.66 2262.67 2353.18 2011.74 1953.92 1970.34

2

Administrative & Misc. expenses 114.05 101.43 119.08 136.91 90.38 80.60 85.02

3

Operation & Maintenance Expenses 344.51 333.04 344.68 412.07 215.86 267.46 238.12

4

Corporate Office Expenses allocated 484.52 500.63 408.96 667.50 741.75 1427.23 1330.22

  TOTAL 2791.75 3003.76 3135.39 3569.66 3059.73 3729.21 3623.70

Page 15: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

15

Varahi & Mani Dam Power House - O&M cost

ITEM 95-96 96-97 97-98 98-99 99-00 00-01 01-02

Employee cost 1140.79 1263.38 1238.14 1295.36 1655.83 1664.49 1667.45

Administrative & Misc. exp 79.52 72.98 79.12 94.51 101.46 114.89 113.13

Consumption of Stores & Spares 142.60 177.73 243.77 85.41 166.64 145.24 206.77

Corporate Office Expenses allocated 286.21 302.82 234.15 339.31 615.66 1193.26 1152.66

TOTAL 1649.12 1816.91 1795.18 1814.59 2539.59 3117.88 3140.01

Page 16: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

16

For future plant norms justification can be discussed up-front.

For existing plant :- There is a need to understand Industry as

it exists.- Environment under which it is performing

- Norms shall address enabling provision to pull up performance.While wielding carrot/stick care is needed

as it may danger the Industry.

Salient submission

Page 17: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

17

Tariff norms shall cover methodology of Tariff fixation of existing plants considering a) capacity of the plant b) Vintage/Technologyc) Present level of performanced) Level of redundancy/stock of Insurance sparese) Type of fuel.F) Constraints for improvementsg) Possibility of sustenance of the present level of

performance

Salient submission

Page 18: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

18

Should spell the - Principle guiding fixation of base level of performance for

reward/penalty.

Norms shall be dynamic to absorb improvement

in performance as Industry matures. - Hence provision for review/revision

indicating review period

- Shall cover the basic frame structure of Tariff

setting

Fixed/variable components - Pass through components with reasons

Salient submission

Page 19: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

19

Merit order dispatch: - Present system considers only the variable cost irrespective of

fixed cost. - Hence power with high fixed and low variable cost gets

dispatched on priority. - Care shall be taken while posting ‘Take or pay commitment for fuel’ in fixed comportment.

- Shall provide for risk mitigation such as for: - Coal - Railways

- Monsoon vagaries

Salient submission

Page 20: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

20

Peak & off peak tariff for hydro stationsInsurance of hydel assetsImpact due to poor receivablesImpact of size of hydro plants on:

- Availability- Auxiliary consumption

Impact of the inheritance of chronic problems on plant availability

Salient submission

Page 21: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

21

ROE - 16%(Post tax) - 80 : 20 Debt- equity - Translates to Net ROE 13.33% SHR - 2500 Kcal/Kwh or Actuals whichever is lower for 210MWAC - 9%AVF/PLF - 80%/ 75% No LC rebate after due date

Operating Norms- Thermal

Page 22: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

22

AC - 1% for overground 1.5% for underground AVF - 85%Peak an off peak tariffReview for Design EnergyTwo-part tariff structureIncentives No LC rebate after due date

Operating Norms- Hydro

Page 23: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

23

O & M - Base year 2002-03 (actuals) - Escalation linked to Index - No adjustment factor for

improved productivity

Operating Norms

Page 24: 1 Karnataka Power Corporation Limited. 2 Hydro-thermal mix ALL INDIA – 106111 MW as on 1.4.2003 KARNATAKA 6539 MW 1.4.2003 (KPCL+VVNL+IPP+CGS)

24