1
June 2007 EMFACT Project UpdateJune 2007 EMFACT Project Update
Terri Goldberg Northeast Waste Management Officials’ Association
3
EMFACT Objectives
• A fully developed easy-to-use well-documented energy, materials, & chemicals use & associated costs tracking tool
• Well-developed training support materials & user’s guide to support the implementation of the tool
• Online downloadable free access to the software application as well as the training materials & user’s guide
4
EMFACT Expectations
• EHS & other staff & managers using & implementing the tool in their businesses, institutions, & agencies; experiencing more informed & effective decision-making concerning energy, materials, & chemical use
• Well-trained assistance providers in the public & private sector able to effectively evaluate energy, materials, & chemicals use & releases & their associated costs, & potential financial return on investment from prevention & sustainability activities
• Environmental efficiency results by users
Contractor
NEWMOA contracted with SYS Technologies to undertake the following :• Develop the first version of the
EMFACT software tool; a users’ guide, including a data dictionary & training support materials, which will be made available in a downloadable form for free online
• Work with NEWMOA & MA OTA to support the testing of a beta version of the EMFACT tool & fix any bugs or problems & make modifications to ensure that the tool works properly 5
Contractor (cont.)
• Support NEWMOA in uploading the tool to its website
• Direct support for three pilot training workshops on the use of the tool, including development of training support materials
6
7
EMFACT Team
• NEWMOA: – Terri Goldberg
• MASS OTA: – Bill McGowan, Phil Milmoe, Rick Reibstein
• SYS Technologies • EMARIC (Deb Savage, Ph.D.)
• Advisory Group
Project Stages
8
• Stage 1: Design of the EMFACT Tool
• Stage 2: Development of the Tool
• Stage 3: Formal testing of the Beta Version of EMFACT
• Stage 4: Modify the Beta EMFACT & deliver Version 1.0
• March 2008: Kickoff
Current Status
• Wrapping up the System Requirements Specification (SRS) & the System Design Specification (SDS) (Stage 1)
• Have begun transition from EHSdesk™ core software modules:– Substance Tracking System (STS)– STS Fuel Burn (FB)– Site Information Management (SIM) Lite– Planning & Calendar Manager (PACmgr)
• Will begin formal EMFACT product development when SRS & SDS are finalized in June
9
Current Status (cont.)
• Developing Proposed Dash Board
• Team holding weekly conference calls
• Planning early demos for TURPs & others to get initial feedback
• On target for beta version testing starting in September
10
Proposed Reports
• Reports on lists of equipment & lists of chemicals
• SEARCH window that enables searching by a variety of fields based upon what is selected; output can be printed or saved to Excel
14
Proposed Reports (cont.)
• Materials Use (i.e., water, fuel, chemicals, other): entire facility, business unit, equipment, production unit, per unit of product, incorporated into product, incorporated in non-product output
• Non-Product Output (i.e., air emissions, wastewater, solid & hazardous waste): entire facility, business unit, equipment, production unit, unit of product
15