1

Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region

Michael FarrellDTP

Presentation to theNational Capital Regional Transportation Planning Board

January 21st, 2015

1/21/2015

Page 2: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

2

Background

• Update to the 2010 Plan– Updates Every Four Years

• Advisory to the CLRP– Not financially constrained

• Identifies: – Planned major bicycle and pedestrian

projects through 2040– “Recommended Practices”– Goals and Performance Measures

• From the TPB Vision and from Region Forward

– Trends in policy, mode share, & safety

1/21/2015

Page 3: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

3

Plan Development • Oversight

– Bicycle and Pedestrian Subcommittee of the TPB Technical Committee

• Project listings – Submitted by state and local jurisdictional staffs– On-line database– As of (roughly) June - October 2014

• Criteria for including projects:– Of a size and scope to be regionally significant

• Regional connectivity• Access to transit, pedestrian safety

– Inclusion in jurisdictional/agency plans1/21/2015

Page 4: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

4

2014 Plan Outline• Chapter 1: Planning context of federal, state,

and local bicycle/pedestrian policies and plans

• Chapter 2: Demographic and geographic overview of bicycling and walking in the region

• Chapter 3: Pedestrian and Bicyclist Safety

• Chapter 4: Overview of existing facilities

• Chapter 5: Goals and Indicators

• Chapter 6: Recommended Practices

• Chapter 7: The 2040 Network

1/21/2015

Page 5: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

New Since 2010:

Bigger Plans(Chapter 1)

• Regional Transportation Priorities Plan • MAP-21

• Transportation Alternatives Program

• TIP• B/P funding increased from 1% of total in FY

2010-2015 to 2% of total in FY 2015-2020

• Access to Metrorail• Metrorail Expansion

• Complete Streets• Regional Policy• State and Local Policies

51/21/2015

Page 6: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

More Bicycling(Chapter 2)

6

District of Columbia

Calvert

Charles

Frederick

Montgomery

Prince George's

Arlington

Alexandria

Fairfax

Loudoun

Prince William

Stafford

Juris

dict

ion

0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00% 3.50% 4.00% 4.50%

Chart 2-15: US Census - Percentage of Workers Biking to Work

Bike1990

Bike2000

Bike2012

1/21/2015

Page 7: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

Better Metrorail AccessTable 2-8: Mode of Access to Metrorail - % of Daily Total

2012 2007

AM Peak - 2012

AM Peak - 2007

Bus15.3 15.6 21.9 22.2

 

Auto Driver 12.6 13.7 25.6 29.3

Auto Passenger (drop off)

4.5 5.5 7.8 9.3

Rode with someone who Parked

0.5 0.6 0.9 1

Bike0.7 0.5 1.0 0.7

Walk 62.2 62.1 37.3 33.3

Commuter Rail 1.5 1.7 3.5 3.8

Shuttle 2.5 n/a 2.0 n/a

Taxi 0.2 0.2 0.1 0.2

1/21/2015 7

Page 8: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

Safety: Fewer Fatalities (Chapter 3)

1/21/2015 8

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

50

100

150

200

250

300

350

400

450

500

84 86 74 80 8665

85 84 10378 75 78 80 69 65

7 610 5 1

712 3

7

4 4 8 63 7

233

307

352 342328

332328

326284

249

208 197210

198 200 MotorizedBicyclistPedestrian

Page 9: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

Pedestrian Injuries: Same levels, but higher proportion

1/21/2015 9

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 20120.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

0

500

1000

1500

2000

2500

3000

3500

4000

1895 20222268

20152229 2189 2323 2267 2228 2158 2110 2262

1910 1971

4.1% 4.1%4.3%

4.0%

4.6% 4.6%

5.1% 5.2%

5.6% 5.5% 5.6%

6.2%

5.2% 5.2%

Pedestrian In-juries

Percentage

Page 10: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

Bicyclist Injuries: Higher numbers but lower rates

1/21/2015 10

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 20120.0%

0.5%

1.0%

1.5%

2.0%

2.5%

0

100

200

300

400

500

600

700

800

900

1000

657 695 672624

581643 630

682 653 666 650 687783

902

1.4% 1.4%

1.3% 1.3% 1.2%

1.4% 1.4%

1.6%1.6%

1.7% 1.7%

1.9%

2.1%

2.4%

Bicyclist In-juries

Percentage

Page 11: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

New Bike Facility Types(Chapter 4)

• Protected Bike Lanes– Physical buffer– Attract users of all

ages and abilities

• Green Bike Lanes• Buffered Bike Lanes• Bike Corrals• Metrorail Bike & Ride

Facilities

1/21/2015 11

Page 12: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

New Recommended Practices(Chapter 6)

– NACTO Urban Street Design Guide and Urban Bikeway Design Guide

– EPA School Siting Guidelines

– ITDP Bike Share Planning Guide

121/21/2015

Page 13: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

More Planned Facilities(Chapter 7)

1/21/2015 13

• Roughly $3 billion in new facilities proposed= Approximately 3% of anticipated regional transportation funding based on FY 2015-20 TIP

• Planned facility mileage is 600 miles longer than in the 2010 plan

Table 7-1: Miles of Bicycle/Pedestrian Facilities in the Washington Region

Facility Type Total in 2005

Completed 2006- May 2010

Completed June 2010 May 2014

Planned New Facilities/ Upgrades

Total in 2040

Bicycle Lane 56 35 45 792 928 Shared-Use Path

490 53 52 800 1393

Total 546 88 97 1592 2323

Page 14: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

1/21/2015 14

Page 15: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

15

Some projects built since 2010

1/21/2015

Page 16: 1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.

Follow-On Actions

• On-Line Mapping and Visualization• Maps linked to project database • Other information can be added• More accessible to the public

• Database Updates • Every 2 years

• Plan Updates • Every 4 years