1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field...

32
1 ISM Document and Training Roadmap Plan Principles Systematic Planning Statistical Design Implement Field Implementation Lab Processing Assess Making Decisions Introduction Challenges/ Opportunities Application Part 1 Part 2 Section 2 Section 3 Section 4 Section 5 Section 7 Section 8 Section 6 ISM Document Training Module ISM Opportunities

Transcript of 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field...

Page 1: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

1

ISM Document and Training Roadmap

Plan

Principles

Systematic PlanningStatistical

Design

ImplementField

ImplementationLab

Processing

Assess Making Decisions

Introduction Challenges/Opportunities

Application

Part 1

Part 2

Section 2

Section 3

Section 4

Section 5

Section 7

Section 8

Section 6

ISM DocumentTraining Module

ISMOpportunities

Page 2: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE MAR 2012 2. REPORT TYPE

3. DATES COVERED 00-00-2012 to 00-00-2012

4. TITLE AND SUBTITLE ISM Document and Training Roadmap: Field Implementation Learning Objectives

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Interstate Technology and Regulatory Council (ITRC),50 F Street NWSte 350,Washington,DC,20001

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES Presented at the 9th Annual DoD Environmental Monitoring and Data Quality (EDMQ) Workshop Held26-29 March 2012 in La Jolla, CA. U.S. Government or Federal Rights License

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

31

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

2 Field Implementation Learning Objectives

Learn how to: Collect an ISM sample

• Understand the similarities and differences between surface and subsurface ISM sampling

ITRC, ISM-1, Section 5

• Consider issues specific to non-volatile and volatile ISM sampling

• Implement and collect ISM replicate samples

Page 4: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

3

Key Presentation Topics

Sampling design Sampling tools ISM surface/subsurface sampling

• Cores and subsampling Specific contaminant of

concern (COC) considerations• Non-volatile and volatile

ISM replicates

Page 5: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

4

ISM Field Sampling Implementation

ITRC, ISM-1, Section 5.1, Figure 5-1

Separate Sample Contai ner for %

Moisture Determ ination

ISM Field Sampling Implementation

v .....

Subsampling on-site Determine Number &

Mass of Soi l

Yes

No

Processing inField?

No

Sample Containerized, Packaged and Shipped to Lab

Yes

Hand Operated Coring Devices

Yes

No DHp Sample or Subsurface ISM

Sampling Collection Methods Needed

Page 6: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

5

Sample Collection Components

Decision Unit (DU) sampling design • Simple random sampling• Random sampling within a grid • Systematic random sampling

Sampling tools• Core shaped• Adequate diameter

Mass• Increment mass• Sample mass

ITRC, ISM-1, Section 4.3.4.2

Page 7: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

6

Sampling Designs

Simple Random Random within Grids

Systematic Random

Increments

ITRC, ISM-1, Section 4.3.4.2 & Section 5.3.1, Appendix A1

Page 8: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

7 Florida Case Study: Decision Unit (DU) Identification

Identify DU in the field• Use typical environmental site investigation procedures• Examples

Survey GPS Swing ties

ITRC, ISM-1, Section 9.3 & Appendix C, Section C.3

Decision Unit(~1/4 acre)

Page 9: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

8

Increment Locations

Identify increment locations in field• Utilize similar site investigation tools

ITRC, ISM-1, Section 5.3.1

Page 10: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

9 Florida Case Study: Increment Field Determination

c:::::::;.

Page 11: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

10

Sampling Tool Considerations

Criteria - shape• Cylindrical or core shaped increments • Minimum diameter required – based on particle

size (soil fraction) of interest

e.g., core diameter >16 mm

ITRC, ISM-1, Section 5.2

Page 12: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

11

Additional Considerations

Decontamination• Not necessary within DU (including replicates)

Sampling tool• Appropriate for matrix and contaminant of interest

ITRC, ISM-1, Section 5.2

Page 13: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

12

Sampling Tool Examples

Soft Surface Soil

Source: Courtesy http://www.jmcsoil.com/index.htmlhttp://fieldenvironmental.com/evc-incremental-sampler.php

Page 14: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

13

Alternate Sampling Tools

Hard Surface Soil

ITRC, ISM-1, Section 5.2; Figure 5-2b

Page 15: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

14 Florida Case Study:Field Sampling

Page 16: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

15 Florida Case Study:“Low Tech” Sampling Tools

Page 17: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

16

Adequate Sample Mass

Criteria – mass (non-volatile)• Recommended mass per increment: 20-60 grams• Final ISM samples: generally 600-2,500 grams

Ms = • n • Ds • • (q / 2)2

Ms – targeted mass of sample (g)Ds – increment length (cm)n – number of increments - soil or sediment density (g/cm3)q - diameter of sample core (cm)

ITRC, ISM-1, Section 5.3.1

Page 18: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

17

Individual core samples combined to prepare an ISM sample for each DU

Subsurface Decision Units (DU)

-1.5’

-0.5’

-3.0’

-5.0’

-10’

DU-1

DU-2

DU-3

DU-4

30 Borings (minimum recommended)Core Increments

not to scale

Page 19: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

18

Preferred increment – entire core interval Core subsampling alternatives

1. Core wedge2. Core slice

Subsurface Sampling Considerations

ITRC, ISM-1, Section 5.3.2

Page 20: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

19

Core Wedge

Continuous wedge removed from entire length of targeted DU interval for 100% coverage

ITRC, ISM-1, Section 5.3.2.1

e.g., wedge width >16 mm

Page 21: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

20

Core Slice

Core Slice removed from randomly selected interval length of targeted DU depth

ITRC, ISM-1, Section 5.3.2.1

Page 22: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

21

Field Processing for Non-Volatiles

ISM sample processing in a controlled laboratory environment is recommended to reduce error

Field processing may be applicable if project specific DQOs can be met

ITRC, ISM-1, Section 5.4.1

Page 23: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

22 Florida Case Study: Non-Volatile ISM Sample Logistics

Final ISM samples: typically 600-2,500 grams or more• Containers, storage, shipping

Laboratory• Facilities and equipment for correct

processing and subsampling

Page 24: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

23

ISM Volatile Sampling Tools

Core type sampler Typical for VOC soil sampling per SW846 5035A

ITRC, ISM-1, Section 5.4.2 Source: Courtesy www.ennovativetech.com

Page 25: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

24

ISM Volatile Samples – Subsurface

Numerous increments collected across core/depth interval

Page 26: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

25

Methanol

Soil

VOC preservation and analysis• Increments are extruded from sampler directly into

volume of appropriate container with predetermined methanol

• Methanol preserved sample submitted to laboratory

• Note shipping restrictions/ requirements

ISM Volatile Sample Logistics

ITRC, ISM-1, Section 5.4.2, Figure 5-11

Page 27: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

26

Replicates Recommended

Increments collected from alternate random locations• Independent samples, not “splits”

Minimum 3 replicate set for statistical evaluations Additional replicates may be necessary

depending on contaminant heterogeneity and project specific DQOs

ITRC, ISM-1, Section 5.3.5

Page 28: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

27

Replicate Spacing and Collection

Decision Unit

Replicate Increment Spacing

Decision Unit

Sample Collection

R1 R2 R3Replicate 1Replicate 2Replicate 3ITRC, ISM-1, Section 5.3.5

Page 29: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

28

Field Replicates – Simple Example

Replicate 3

Replicate 2

Replicate 1

Collecting the Samples

Page 30: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

29

Replicate/Sampling Reminders

Replicates • What type• How many• Where/when will they be collected• How will they be evaluated

“Homogenizing” or mixing not necessary• Laboratory processing and subsampling (following

module) designed to attain representative analytical sample

Page 31: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

30

Field Implementation Summary

Determined during Systematic Planning• Sampling design• Adequate sampling tools• ISM surface/subsurface sampling logistics

Subsurface cores and subsampling

• Specific contaminant of concern (COC) considerations

• Non-volatile and volatile

• ISM replicates

Page 32: 1 ISM Document and Training Roadmap · 2013-01-24 · ISM Document and Training Roadmap: Field Implementation Learning Objectives 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

31

ISM Document and Training Roadmap

Plan

Principles

Systematic PlanningStatistical

Design

ImplementField

ImplementationLab

Processing

Assess Making Decisions

Introduction Challenges/Opportunities

Application

Part 1

Part 2

Section 2

Section 3

Section 4

Section 5

Section 7

Section 8

Section 6

ISM DocumentTraining Module

ISMOpportunities