Evaluacin econmica de proyectos de inversin en infraestructurasGins de Rus
Universidad de Las Palmas de Gran CanariaUniversidad Carlos III de MadridFEDEAMster Universitario en Gestin Portuaria y Logstica Universidad de Cdiz, 2015
-
*IntroduccinPrecio
Coste
Valor
-
Please Circle the Best Answer to the Following Question: You won a free ticket to see an Eric Clapton concert (which has no resale value). Bob Dylan is performing on the same night and is your next-best alternative activity. Tickets to see Dylan cost $40. On any given day, you would be willing to pay up to $50 to see Dylan. Assume there are no other costs of seeing either performer. Based on this information, what is the opportunity cost of seeing Eric Clapton?
A. $0 B. $10 C. $40 D. $50
-
Do Economists Recognize an Opportunity Cost When They See One? A Dismal Performance from the Dismal Science Paul J. Ferraro and Laura O. Taylor Contributions to Economic Analysis &Policy Volume 4, Issue 1 2005 Article 7
-
*IntroduccinEl modelo y la economa real
Los individuos buscan maximizar su utilidad
El gobierno decide sobre la asignacin de recursos en nombre de los individuos
-
*Informacin e incentivos
No existe informacin perfecta
Informacin incompleta (demanda)
Informacin asimtricaRiesgo moral (garanta de ingresos, contratos-programa)Seleccin adversa (regulacin de la seguridad area)
-
*La intervencin pblica
El planificador benevolente
La paradoja del cambio de objetivo
La teora de la captura y de los grupos de inters
Racionalidad individual y racionalidad colectiva
-
Three Gorges
-
Que tienen en comn las fotografas anteriores?
-
Caractersticas de las infraestructuras
Larga vidaInversiones costosasCostes irrecuperablesUtilizan recursos naturales Incertidumbre de demanda Los gobiernos deciden Las decisiones son irreversibles
-
Infraestructuras y crecimiento
La inversin en infraestructuras:son condicin necesaria pero no suficientetienen un elevado coste de oportunidad deben ser evaluadas previamente: el efecto keynesiano es irrelevante
-
Distancia en km
-
Pasajeros anuales (millones)
-
El puerto de Arinaga
-
Infraestructuras y economa
La perspectiva microeconmica:Anlisis coste-beneficioEstudios de impacto
-
Pensar antes de medirQue queremos medir?:
el concepto de valor econmico
-
Orgenes de la evaluacin econmica Jules Dupuit 1804-1866
-
Orgenes de la evaluacin econmicaJules Dupuit: On the utility of public works (1844)Costes y beneficios de la construccin de un puente
Introduccin del concepto de excedente del consumidor
-
Valor total y marginal, precio, ingresos y beneficiospreciocantidad3124
-
Precio y valorpreciocantidadq*p*Valor para la empresa
-
Si p = 0, cul es el valor del bien?preciocantidadqmaxP* = 0Valor total para la sociedad
-
y cuando p>0?preciocantidadqP* Excedente del productorExcedente del consumidorValor total para la sociedad
-
Los costespreciocantidadqP* Excedente del productorExcedente del consumidorExcedente totalc
-
cantidadpreciocantidadq*p*preciocantidadq*p*Anlisis financiero (FNPV)Anlisis coste-beneficio (ENPV)+efectos externos
+ efectos indirectos
+efectos distributivosc c
-
Harold Hotelling 1895-1973
-
Evaluacin econmica y tarificacin
Hay que cobrar por el uso de las infraestructuras?
Harold Hotelling The efficient way to operate a bridge is to make it free to the public, so long at least as the use of it does not increase to a state of overcrowding The general welfare in relation to problems of taxation and of railway and utility rates (Econometrica, 1938)
-
Gua ACB y bienestarDeclaraciones imprecisas afirmando que el proyecto promueve el desarrollo econmico o el bienestar social no es un objetivo medible
Guide to CBA DG Regional Policy
-
Gua ACB y bienestarLo ms importante: Podemos afirmar que el aumento agregado de bienestar derivado del proyecto es mayor que los costes para conseguirlo?
Guide to CBA DG Regional Policy
-
Proyecto (inversin, tarificacin, etc.) Perturbacin en la economa:
n individuosm mercadosT periodos
U0: bienestar individual (utilidad) sin proyecto
U1: bienestar individual (utilidad) con proyecto
-
La sociedad: quin cuenta?Consumidores
ProductoresPropietarios de los factores: capital, trabajo y suelo
Contribuyentes
Resto sociedad (efectos externos)
-
Cmo afecta a la sociedad?
U1 > U0 para los n individuos
U1 < U0 para los n individuos
U1 > U0 para algunos y U1 < U0 para otros: como comparar?
-
Aprobar o rechazar el proyecto?Criterios de decisin social
IndividuosBeneficiosCostesBeneficios netosA707B28-6C34-1D91 8E16-5
-
Compensacin potencialLos ganadores de un proyecto podran compensar a los perdedores y todava seguir ganando.
Se trata de una compensacin hipottica
-
Cambios en el bienestar (utilidad) individual
-
Qu queremos medir?Si el individuo mejora
No basta con saber que mejora, necesitamos la magnitud de dicha mejora:
-
Qu podemos medir?
-
Medidas monetarias de cambios en la utilidad
Disposicin a pagar o disposicin a aceptar
Preferencias reveladas
Preferencias declaradas
-
Etapas en el ACBDefinir el proyecto:The project must be clearly identified as a self-sufficient unit of analysis D.G. Regio
Valoracin de las distintas alternativas:El caso base: do nothing vs do minimum
Identificacin y cuantificacin de los beneficios y costesAgregacin de los beneficios y costesInterpretacin de los resultados y criterios de decisinRentabilidad econmica y viabilidad financieraAnlisis de riesgo
-
Gua ACB de la Comisin Europea
-
Manual de evaluacin
www.evaluaciondeproyectos.es
-
VAN social
-
Financiacin e incentivosDos niveles de gobiernosupranacional-nacional (nacional-regional)
El caso de la Comisin Europea y la financiacin de inversiones
-
El modelo bsico: criterios de decisin sin incertidumbre
****