1 Gad Submersible Bridge Padla Jawar Mines Road

1
96.110 99.000 76.80 99.110 83.40 90.00 96.100 57.00 96.150 63.60 97.110 70.20 GENERAL ARRANGEMENT DRAWING OF PROPOSED SUBMERSIBLE BRIDGE ON PADLA - JAWAR MINES ROAD PLAN A1 CHAINAGE IN METER RIVER BED LEVEL 6600 6600 6600 SECTIONAL ELEVATION HIGH FLOOD LEVEL 99.480 M DECK LEVEL 99.975 M A2 6600 6600

description

FF

Transcript of 1 Gad Submersible Bridge Padla Jawar Mines Road

  • 96.110

    99.000

    76.80

    99.110

    83.40

    90.00

    96.100

    57.00

    96.150

    63.60

    97.110

    70.20

    GENERAL ARRANGEMENT DRAWING OF PROPOSED SUBMERSIBLE BRIDGE ON PADLA - JAWAR MINES ROAD

    PLAN

    A1

    CHAINAGEIN METER

    RIVER BEDLEVEL

    66006600

    6600

    SECTIONAL ELEVATION

    HIGH FLOOD LEVEL 99.480 MDECK LEVEL 99.975 MA2

    66006600