Existing Staffing and Supervisory Arrangements for Implementation of

S.S.A. Civil Works

Presentation by S.S.A. Bihar

Page 2: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

2

CIVIL WORKS UNDER SSA BIHAR

Civil Works is a tool to provide access, retention and quality education to all the children of age group 6-14 years upto elementary level (class I to VIII) as per national norms.

Access• Additional Class Rooms (ACR).

• New School Buildings (NSB).

• Model Cluster Schools under national programme for education of girls at elementary level (NPEGEL).

• Kasturba Gandhi Balika Vidyalaya (KGBV).

Page 3: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

3

Retention• Toilets (particularly girls toilets), Hand pump,

Kitchen shed, Electrification and child friendly elements (Slide, See-Saw, Swing and Acrobatic bar etc).

Quality Education• A Block Resource Centre (BRC) in every Block

for training of teachers.• Cluster Resource Centre (CRC) for 1 day

recurring meeting in every month for every teacher.

CIVIL WORKS UNDER SSA BIHAR

Page 4: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

4

IMPLEMENTATION OF SSA IN BIHAR

All the civil construction works except BRC and KGBV is carried out by VIDYALAYA SHIKSHA SAMITI (V.S.S.).

The VSS is provided technical training and manuals before start of construction work.

BRC construction is carried out by BRC construction committee.

Page 5: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

5

State Level Civil Works Management Structure is headed by Civil Works Manager (CWM).

CWM is assisted by one experienced Architect, one Assistant Engineer with additional support of State Resource Group Architect/Engineer Members.

Executive Engineer at district level with two Assistant Engineers and one Junior Engineer at every 50 Panchayat with additional support of District Resource Group Architect/Engineer members.

Existing Staffing and Supervisory Arrangements

Page 6: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

6

At sub-district level there is a team of Junior Engineers and Technical Supervisors.

The District Magistrate (D.M.) is Chairman of SSA in the district.

The additional support of Engineers (other than SSA) have also been provided by D.M. for SSA civil works.

One Technical Supervisor is engaged for each 20 construction sites.

Existing Staffing and Supervisory Arrangements

Page 7: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

At present 11 Executive engineers, 28 Assistant Engineers and 79 Junior Engineers are employed in all the districts.

The vacant post of A.Es. and J.Es. are in final stage of recruitment process.

In the second phase the vacant post of E.Es would be filled up.

At present 882 Technical Supervisors are engaged on per site Honorarium basis.

7

Existing Staffing and Supervisory Arrangements

Page 8: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

8

The work distribution for district engineering team have been prepared as per Administrative & Geographical condition of the district.

Recurrent trainings have been imparted to district engineers at state level.

Recurrent training have also been imparted to all the Technical supervisors at district level.

Existing Staffing and Supervisory Arrangements

Page 9: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

225 nos. of applications were received for the vacant posts of A.Es. and 680 nos of applications received for the vacant post of J.Es.

The received applications for the post of A.Es and J.Es have been shortlisted.

The state Executive committee held on 07.08.2009 decided to conduct written test for selection of A.Es and J.Es in September October, 2009.

The vacant posts of A.Es and J.Es. would be filled up very shortly.

9

Existing Staffing and Supervisory Arrangements

Page 10: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

To impart training to V.S.S./Ad hoc Committee members regarding all aspects construction work such as drawings and estimates etc.

To acquaint VSS/Ad hoc Committee members regarding purchase of quality building materials.

To ensure the maintenance of Cash Book, Muster roll, Stock Book, Receipt and Expenditure Register, Site Order Book etc, by V.S.S. 10

Role of Technical Supervisory for implementation of S.S.A. Civil Works

Page 11: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

Entry of technical observations during construction work in site order book and its compliance by V.S.S. /Ad hoc committee.

To impart training to V.S.S./Ad hoc Committee regarding preparation of Statement of Expenditure (SOE) for expenditure incurred on building construction works

To enter measurement of the work done in Measurement Books.

11

Role of Technical Supervisory for implementation of S.S.A. Civil Works

Page 12: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

12

Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works

The national level tender published for Third Party Evaluation works.

Out of 9 agencies who applied for 27 district, 6 agencies have technically and financially qualified for 21 districts.

6 agencies have been engaged for Third Party supervision, monitoring and quality evaluation in the 21 districts of Bihar for construction works under AWP&B 2008-09 and 2009 -10.

The Third Party Evaluators have started submitting site visit reports.

Page 13: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

13

S.N.

Group Name of Consultancy Firm/Organization/Company

1 Tirhut- II (East Champaran)Group No- 05

M/s. Geo-Chem Laboratories Pvt. Ltd (17/19)

2 Patna-I (Patna-U, Patna-R, & Nalanda)Group No- 01

M/s. Nirmal Dev Construction (05/19)

3 Purnea-II (Araria & Kishanganj)Group-09

M/s. Agricultral Finance Corporation Ltd.(06/19)

4 Munger-II (Khagaria & Begusarai)Group No.-20

M/s. Agricultral Finance Corporation Ltd.(07/19)

5 Purnea-I (Purnea & Katihar)Group No- 08

M/s. Geo-Chem Laboratories Pvt. Ltd (15/19)

Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works

Page 14: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

14

S.N.

Group Name of Consultancy Firm/Organization/Company

6 Koshi-I (Saharasa & Supaul)Group-13

M/s. N.C.C. National Construction & Consultant (09/19)

7 Magadh –I (Gaya & Nawadha) Group-17

M/s. Geo-Chem Laboratories Pvt. Ltd (12/19)

8 Darbhanga-I (Darbhnaga)Group No- 10

M/s. Nirmal Dev Construction (19/19)

9 Darbhanga- III (Samastipur)Group No- 12

M/s. Geo-Chem Laboratories Pvt. Ltd (14/19)

10 Patna-II (Bojpur & Buxar)Group No- 02

M/s. Geo-Chem Laboratories Pvt. Ltd (16/19)

Page 15: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

15

S.N.

Group Name of Consultancy Firm/Organization/Company

11 Patna-III (Rohtas & Kaimur)Group No- 03

M/s. AAkar Abinav Consultants Pvt. Ltd. (18/19)

12 Saran-II (Siwan) Group No.-16

M/s. Shree Shree Engineering and Financial Consultancy Pvt. Ltd. (04/19)

Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works

Page 16: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

16

The technical training of all E.E. /A.E. , BEPC (SSA) at SLO, Patna Inauguration by Sri Rajesh Bhushan, I.A.S., SPD, BEPC, Patna

Sl.No. Programme Officer / Technical Expert Subject

1. Sri S. N. Pandey, CWM, Civil Works Quality Control Works and good Construction practices.

2. Sri Pankaj Kumar, Architect, Civil Works Discussion on drawing under SSA.

3. Prof. Yogendra Prasad, Rtd. HOD, NIT, Patna

(i) Structural Design Aspect(ii) Holistic Approach towards School Building Construction(iii) Quality Control Works and good Construction

4. Prof. Nirmal Kumar, Professor, MIT, Muzaffarpur

5. Sri K. N. Gupta, Rtd. Chief Engineer, PHED School Toilet-Water Supply

6. Sri Ashok Kumar Tiwary, SRP, AIE Vidyalaya Shiksha Samiti

7. Smt. Shweta Sandilya & Smt. Priyanka Singh, SSHE, UNICEF, Patna

BaLA & School Toilet

8. Sri U. K. Verma, CAO, Acctts. Section Accounts related to Civil Works

9. Sri Mahendra Paswan, KGBV & NPEGEL K.G.B.V. & N.P.E.G.E.L. (MCS)

10. Sri Rameshwar Pandey, IED & EFE. Basic Knowledge of I.E.D. & E.F.E.

11 Sri Rajesh Thadani, MGT. Management

12 Sri Ravi Shankar Singh, MIS M.I.S. related to Civil Works

13 Sri A.K. Pandeya, AIE & Media Basic Knowledge of A.I.E.

Page 17: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

17

The technical training of all Technical Supervisors /J.E., BEPC at District Level Office Inauguration by D.M. of district

Sl. No.

Component In-charge/ Technical Expert Subject

1 DSE-cum-DPC Role of VSS in building construction.

2 Sri S.N. Pandey, CWM/ Sri Pankaj Kumar, Architect/Sri Rajesh Kumar Singh, A.E., SLO

Quality Control Works and good construction practices & Discussion on drawing under SSA.

3. Prof. Yogendra Prasad, Rtd. HOD, NIT, Patna / Prof. Nirmal Kumar, Professor, MIT, Muzaffarpur

(i) Structural Design Aspect(ii) Holistic Approach towards School Building Construction(iii) Quality Control Works and good construction

4 Sri K. N. Gupta, Rtd. Chief Engineer, PHED

School Toilet-Water Supply

5 Executive Engineer (civil) / Assistant Engineer (civil)

BaLA , School Sanitation & all Civil Works of SSA, Civil Works under 12th Finance Commission, KGBC, NPEGEL (MCS).

6 Accounts Officer Accounts related to civil works

Page 18: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

The Technical Training of all Bhawan Nirman Samitee (Part of V.S.S. Members) BEPC (SSA) at Block Level Office Inauguration by DSE-cum-DPC. of District

Sl.No.

Component In-charge/ Technical Expert

Subject

1 Block Education Extension Officer (BEEO)

Role of BNS and VSS in building construction.

2 Assistant Engineers (Block Level) (i) Structural Design Aspect(ii) Quality Control Works and good construction practices & Discussion on drawing under SSA.

3 Junior Engineers (Block Level) (i) Holistic Approach towards School Building Construction(ii) Quality Control Works and good construction

4 District coordinator (TSC) School Toilet-Water Supply

5 Technical Supervisor BaLA , School Sanitation & all Civil Works of SSA, Civil Works under 12th Finance Commission, KGBC, NPEGEL (MCS).

6 Accounts Officer Accounts related to civil works

Page 19: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

19

Photograph of School Building under Construction

M.S. Sansariya, Nautan Block,W. Champaran (4Room ACR)

Page 20: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

20M.S. Madhubani District(4Room ACR)

Photograph of School Building under Construction

Page 21: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

21

Photograph of BRC Constructed

Block Resource Centre at Muzafarpur

Page 22: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

22

Cluster Resource Centre at Bhagalpur District

Photograph of CRC Constructed

Page 23: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

23M.S. Parvati Girls, Ram nagar Block, W. Champaran (3 Room ACR)

Photograph of Constructed School Building under SSA

Page 24: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

24

Photographs of Constructed Kitchen Shed

Kit. Shed at M.S. Parvati Girls, Ram nagar Block

Kit. Shed at M.S.Segari Bahuari, Ram nagar Block

Page 25: 1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.