EUDET Kick-off Meeting
Summary and Outlook
Where are we now andwhere do we go from here?
Joachim MnichDESY
17.02.2006
2
Formal Status of the Project
EUDET officially started 1.1.2006
Final contract available
1) to be signed by DESY and EC defines entry into force important for some partner to hire personnel & spend money
2) accession forms to be signed by all partners underwayAfter that all formalities done!
Expect first instalment soon Now we must fully concenrate on scientific part of the project
Complete management structure in place
3
EUDET
Network Transnational Access Joint Research Activities
Management
Detector R&D Network
Access to DESY Test Beam
Access to Detector R&D Infrastructures
Test Beam Infrastructures
Tracking Detectors
Calorimeter
Structure of EUDET:
Scientific Status of the Project
Detector R&D Network: Information exchange and intensified collaboration Common simulation and analysis framework Validation of simulation Deep submicron radiation-tolerant electronics
Test Beam Infrastrucuture Large bore magnet Pixel beam telescope
Tracking Detectors Large TPC prototype Silicon TPC readout Silicon tracking
Calorimeter ECAL HCAL Very Forward Calorimeter FE Electronics and Data Acquistion System
Activities split up into several tasks:
4
Status of Tasks
Web based information system:
well advanced framework for eudet.org existing please start using it JRAs should take care of their part assign responsible person(s)
development of framework not finished: papers, meetings, outreach, … new demands will pop up
On next slides: Typical examples, no claim of completenessEmphasis on items to be achieved soon
5
Testbeam Infrastructure
Magnet (PCMAG)
Magnet existing at KEK
Magnet to be used by several other devices (TPC, Si detectors, calorimeter?)Point were close inter-JRA collaboration and communication is needed
Infrastructure Areas of work identified
Transport to DESY August 2006
6
Testbeam Infrastructure
Pixel Telescope
Simulation σ ≈ 2µm
2007: Demonstrator based on existing CMOS chip limited speed but useful beam telescope
DAQ important issue beyond beam telescope
→ DAQ workshop at this workshop
7
Detailed working plan establised
Testbeam Infrastructure
8
Tracking
TPC
fieldcage design based on light small prototype TPC
prototype electronics - FADC based on ALTRO - TDC type readout important: well defined interfaces to readout planes - mechanics - electronics
Design of readout planes will be complexNeed input now from all potential users
60 cm length80 cm diam.
TDC scheme
9
Si-TPC
Going from MediPix to TimePix
clock distribution scheme under discussion - local oscillator per pixel - distributed clock
final pixel schematics in ≈ 1 month chip submission in summer 1st TimePix operational 1/2007
10
Silicon Tracking
FE electronicsMechanicsCoolingAlignment
Incorporated into SILC
Example: FE chips in 130 nmSubmission in April
Potential application of NA2 access to rad. hard micro-electronics
11
Study, design and construction Study, design and construction of an half module of an half module
160cm160cm
36 cm36 cm
Study, design and construction Study, design and construction of an half module of an half module
160cm160cm
36 cm36 cm
Calorimeter
ECAL
The EUDET Module:- 2006 R&D and design e.g. radiator material
HCAL design:Input from testbeam
12
Very Forward Calorimeter
Laser-based positioning system Test system linearity/homogeneity
First ideas:
Positioning system Readout: high linearity at large dynamic range
13
Electronics for Calorimeter
C h a n n e l 0
C h a n n e l 1
C h a n n e l 2
C h a n n e l 3
C h a n n e l 6 2
C h a n n e l 6 3
T h r e sh o ld 0
T h r e sh o ld 1
T h r e sh o ld 2
T h r e sh o ld 3
T h r e sh o ld 6 2
T h r e sh o ld 6 3
>
B unc h c ro s s ing ID
Dig
ital m
emor
y[ 6
4 bi t s
(da
t a)
+ 12
bi ts
(B
CID
)]*d
e pht
mem
ory write
D a ta o u t
an a lo g u e f r o n t- en d
DHCAL TECH1 layout
FE chip (1mm)Wafer (500µm)PCB (600µm)
Common readout architecture Several key innovative features (power pulsing, digitsation,…) Key issue for ILC calorimeter concept
ECAL:Reduce thickness to minimum
14
Data Acquisition
DAQ has been identified as key issue of EUDET
part of the infrastructures easy-to-use for users cross-JRA issue combined testbeam run of several sub-detectors
relations to software framework (→ NA2)
DAQ is an important issuse for ILC detectors EUDET is not going to design/build anything close to the final ILC DAQ system but we must stay connected to the international R&D efforts to go into the same direction
15
Transnational Access
TA1 2006 → 2009 DESY TestbeamTA2 2008 → 2009 Access to infrastructure
Eligible user: - European user groups, i.e. the speaker of the group must be affiliated to a European institute - but not from the same country, e.g. non-German for TA1 - EUDET or extra-EUDET Eligible projects: - ILC related or any other HEP or non-HEP project
Procedure: - write a short proposal for typically 2-3 weeks testbeam usage - to be evaluated by our Selection Board
Your potential profit: - travel money
More details soon on eudet.org
16
The Near Future
2006 2007 2008 2009
EUDET time profile:
2006 is already a very important year!
Reminder:What do we have to achieve until the end of the year?2006 milestones and deliverables
17
Milestones 2006
JRA1: Testbeam Infrastructure September: Prototype 1 of small digital chip December: Magnet available
NA2: Detector R&D Network October: 1st stage computing network October: Annual Scientific Workhop December: 1st version of electronic information system
NA1: management: February: Kick-off Meeting done October: Annual Meeting (IB, SC)
18
JRA3: Calorimeters September: HCAL VME test stand October: Concept review of all tasks December: ECAL mechanics concept December: TECH1 December: ASIC prototype DHCAL
Milestones 2006
JRA2: Tracking Detectors December: TPC preamp prototype board December: TimePix operational
19
Deliverables 2006
20
Next Steps
Lot of work to be accomplished already in 2006
Consolidate plans Advertise positions quickly and start to hire personnel Start to spend money (where reasonable) Remember: we should try to stick to our spending profile
Continue bi-weekly meetings of SC
Plan for full review of status in summer - scientific and financial aspects - coordinators, tasks leaders
Annual Workshop Meeting in October - similar layout and duration as Kick-off Meeting - preparation of Annual Report - date and venue being discussed
21
EUDET in the ILC Universe
Relation to developments in Americas and Asia talks by Andy White and Tohru Takeshita with very positive reactions towards EUDET
22
Fully incorporated in the ILC detector R&D- Make optimal use of EUDET resources on international scale- Avoid unnecessary duplication structures
Special attention:
- EUDET is a contract between you and the EC with well defined milestones and deliverables some only months away- Need for some independent structures managements, meetings,.. - Find delicate equilibrium between these exigencies
EUDET in the ILC Universe
23
EUDET in the ILC Universe
My personal view on EUDET and the relation to other ILC activities(in the language of particle physicists) consider EUDET as sort of (large) virtual institute
which is part of an even larger collaboration the ILC detector R&D
EUDET provides resources to and takes responsibilities in the collaboration which must be carefully synchronised with the other collaborators
e.g. with collaborations as CALICE, FCAL, SILC, LCTPC
yet, even as virtual institute EUDET is responsible towards its funding agency (European Union) requires an adequate internal structure and management
This meeting was an important and successful step towards our goals
24
Acknowledgements
Many thanks to all of you for coming to DESY and participating in this Kick-off Meeting (approximately 100 participants) Many thanks to our Advisory Board for following the meeting
As well as to Stefano Fontana (EU) for his visit and his talk
For the organisation of the workshop many thanks to Ramona Matthes & Adrian Vogel
See you all at our Annual Workshop end of this year!