CPAC MBA Collaboration Project
Matt Hallingstad Ejike Anih Siddharth Sureka
mini-update02.23.2011
![Page 2: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/2.jpg)
2
Background
Inefficiencies at the CPAC:
• Sample collection from PIs
• Communication with PIs
• Data transfer
• Administrative laboratory management
![Page 3: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/3.jpg)
3
Recommendations
Short term:
• Implement effective website communication
• Improve consultation form• Hire Administrative Assistant
Long term:
• Implement IT System to help manage the process
![Page 4: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/4.jpg)
4
Short Term Recommendations
Implement effective website communication:
•Website improvements will clearly present CPAC’s value proposition and better manage PI expectations (incl. turn-around times).
![Page 5: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/5.jpg)
5
Sample Website Improvement
IMPROVED:Quantification of Compounds; Development Of Quantification Methods CPAC performs quantification of drugs and metabolites with three state-of-the-art instruments:
Applied Biosystems API 3200 LC/MS/MS;Applied Biosystems API 4000 LC/MS/MS; andThermo Scientific HPLC/MS/MS.
In addition to the HPLC/MS/MS’s, CPAC has access to HPLC systems equipped with UV, fluorescence, and other detectors that may be used for routine analyses.
ORIGINAL:Access to state-of-the-art instrumentation for quantification of drugs and metabolites is an invaluable resource for all cancer investigators in the IUSCC. The core has two of these instruments (HPLC-MS/MS; API 4000 and API 3200) for drug quantification. In addition to the two HPLC-MS/MS’s, the core facilities have access to additional HPLC systems (equipped with UV, fluorescent, or other detectors) that may be used for routine analyses.
![Page 6: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/6.jpg)
6
Short Term Recommendations
Improve consultation form:
• The improved consultation form will capture key parameters required for efficient sample intake, and will convey information regarding expected turnaround times.
![Page 7: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/7.jpg)
7
Short Term Recommendations
Hire Administrative Assistant:
•Part-time laboratory manager will facilitate intake of samples, coordinate communication with PIs, manage supplies and ordering, thereby allowing lab technicians to focus on core responsibilities.
![Page 8: 1 CPAC MBA Collaboration Project Matt Hallingstad Ejike Anih Siddharth Sureka mini-update 02.23.2011.](https://reader036.fdocuments.in/reader036/viewer/2022082909/5a4d1b747f8b9ab0599b68ad/html5/thumbnails/8.jpg)
8
Long Term Recommendations
Implement IT System to help manage the process:
• A comprehensive IT system will minimize process and operational inefficiencies by providing easy-to-use interface. It will also facilitate timely communication with PIs, reinforcing CPAC’s position as a state-of-the-art pharmacokinetic Core.