1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State...

24
1 Cost Escalation Mitigation Cost Escalation Mitigation Florida DOT Approach Florida DOT Approach Greg Davis Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006 October 20, 2006

Transcript of 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State...

Page 1: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

1

Cost Escalation MitigationCost Escalation MitigationFlorida DOT ApproachFlorida DOT Approach

Greg DavisGreg Davis State Estimates EngineerState Estimates Engineer

October 20, 2006October 20, 2006

Page 2: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

2

Reasons for Cost Escalation

• Material Prices• Bidder Competition• Saturated Construction Market• Labor Shortages• Hurricanes

Page 3: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

4

Earthwork - Statewide

$4.96 $4.38

-11.7%

$7.27

+66.0%

$8.64

+18.8%

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Page 4: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

5

Earthwork

• Borrow Pit Availability

• Hauling Cost

• Real Estate Pressures

Page 5: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

6

Asphalt – Statewide

$53.93 $61.63

+14.3%$77.57

+25.9%

$99.54

+28.3%

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Page 6: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

7

Asphalt

• Oil prices

• Bitumen Prices

• Aggregates

Page 7: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

8

Structural Concrete – Statewide

$549.82 $564.12

+2.6%

$760.89

+34.9%

$868.90

+14.2%

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Page 8: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

9

Structural Concrete

• Global Demand

• Aggregates

Page 9: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

10

Structural Steel – Statewide

$1.06 $1.48

+39.6%

$1.57

+6.1%$1.72

+9.5%

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Page 10: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

11

Structural Steel

• Global Demand for Steel

• Fabrication Backlog

• Transportation Cost

Page 11: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

12

Reinforcing Steel - Statewide

$0.52 $0.75

+44.2%

$0.91

+21.3%

$0.96

+5.5%

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Page 12: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

13

Reinforcing Steel

• Global Demand for Steel

• Production Backlog

• Transportation Costs

Page 13: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

14

SummaryStatewide Weighted Average Prices

Pay Item Pay Item GroupGroup

UnitUnit 20032003 20042004 ChangeChange 20052005 ChangeChange 20062006(Jan-Sept)(Jan-Sept)

ChangeChange

Earthwork CY $4.96 $4.38 -11.7% $7.27 +66.0% $8.64 +18.8%

Asphalt TN $53.93 $61.63 +14.3% $77.57 +25.9% $99.54 +28.3%

Structural Concrete

CY $549.82 $564.12 +2.6% $760.89 +34.9% $868.90 +14.2%

Structural Steel

LB $1.06 $1.48 +39.6% $1.57 +6.1% $1.72 +9.5%

Reinforcing Steel

LB $0.52 $0.75 +44.2% $0.91 +21.3% $0.96 +5.5%

Page 14: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

16

Page 15: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

17

Page 16: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

18

Page 17: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

19

Page 18: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

20

FDOT STRATEGIES

•Deferred Projects– $1.0 Billion in projects (over 3-

years)

•Refine Awards Criteria– Normal Criteria– Additional Criteria– Rejected Contracts

Page 19: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

21

FDOT STRATEGIES

•Revised Inflation Rates

Year Current Past– 1 7.0% 4.5% – 2 4.5% 4.0% – 3 4.0% 3.5% – 4 3.5% 3.3% – 5 3.5% 3.3%

Page 20: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

22

FDOT STRATEGIES

•Alternative Contracting Methods–Bid Alternates–Bid Options

•Bid Maximum Specification

Page 21: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

23

FDOT STRATEGIES

• Comprehensive Price Index

• DOT Borrow Pits

• Temporary/Portable Asphalt Plants

Page 22: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

24

Questions/Comments

Page 23: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

25

CONTACT INFORMATION

Phillip “Greg” Davis, P.E.State Estimates Engineer

[email protected](850) 414-4170

Page 24: 1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.

26