1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

17
1 - Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut

Transcript of 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

Page 1: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

1 - Classification: Internal 2011-01-19

Gullfakslandsbyen 2011

Knut

Page 2: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

2 - Classification: Internal 2011-01-19

Challenge 2. Drilling of a long reach water injector

• A new water injection well to the Beta ridge is being planned from the Gullfaks B platform. Planning the well is ongoing.

• A good well project is often “drilled on the paper” before initiated offshore. Describe a possible route from “drilling the well on paper”.

• The drilling industry has the last 5 years established remote expert team onshore.

• Describe how the Statoil should perform the expert team solution. Make a recommendation about which measures Statoil need to take in order to be able to drill these wells to Gullfaks Sør Statfjord.

• Statoil advisor: Johan Eck-Olsen

Page 3: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

3 - Classification: Internal 2011-01-19

Specific requirements to planning

• Organizing the detailed planning phase

• Work process description

• Project schedule

• Peer Assist and Peer Review

• Detailed 15 minutes plan

• Decision and task log

• Risk Assessment

• Check list

• Decision trees and contingency plan

• Detailed drilling and well program

• Best Practice

Page 4: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

4 - Classification: Internal 2011-01-19

Evaluated in Peer Assist and Peer Review

• Project plans

• Statoil relevant governing documentation

• Authorities rules and regulations

• Budget, based on uncertainty simulations

• Score board

• Programs

• Procedures

• Risk identification log

• Decission trees

• Pros and cons for different scenarioes and cases

Page 5: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

5 - Classification: Internal 2011-01-19

DWB WIB - Well Interventions Bergen

Well Interventions Manager

DWB WIB

Torstein Haugland

Bergen

Gullfaks 1

DWB WIB WG1

Knut Müller

Bergen

Gullfaks 2

DWB WIB WG2

Njål Grønnerød

Bergen

Oseberg

DWB WIB WOO

Hans Morten Koldal

Bergen

North Sea 1

DWB WIB NS

Gunnar Halle Daae

Bergen

North Sea 2

DWB WIB NS2

Stephen Stragiotti

Bergen

DWB WIB PI

Well Interv. Plan Dep.

Jens M. Wennesland

Bergen

Page 6: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

6 - Classification: Internal 2011-01-19

D&W DWB WIB, Activity 2010 pr 31.12

694

650 655655

673

344

304 300304

269

222

280 282270 244

205

245

165 185

287

0

100

200

300

400

500

600

700

Op

erat

ion

day

s

Gullfaks Oseberg North Sea 1 North Sea 2

2009 Plan 2010 YTD 2010 Prognosis Plan 2011

Operations: 65

Operations: 20

Operations: 31

Operations: 32

Page 7: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

7 - Classification: Internal 2011-01-19

Page 8: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

8 - Classification: Internal 2011-01-19

Page 9: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

9 - Classification: Internal 2011-01-19

Coiled Tubing

Page 10: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

10 - Classification: Internal 2011-01-19

Stimulation Vessel

Page 11: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

11 - Classification: Internal 2011-01-19

Mechanical WL/ Electrical WL/Traktor

Page 12: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

12 - Classification: Internal 2011-01-19

Challenge 3a. PLT in Gulltopp

• Gulltopp is a 10 km well drilled from Gullfaks A platform. The well had water breakthrough after two years of production and it is now desirable to find out from which zone the water is coming.

• Explain the PLT technology and how a Production logging tool (PLT) can improve the oil recovery at Gulltopp.

• Plan a detailed PLT job for Gulltopp. (This includes simulations and detailed PLT procedure)

• Make a cost estimate based on information from vendors, and show economics before tax including Net Present Value.

• Statoil advisor: Knut Müller

Page 13: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

13 - Classification: Internal 2011-01-19

Page 14: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

14 - Classification: Internal 2011-01-19

Challenge 3b. WL operations bellow the rig on GF.

• The three Gullfaks platforms have two shafts with wells. Well operations and drilling can then work independent. When production wells has to be shut in due to barrier problems on the same shaft as drilling is doing their work, it would be beneficial to secure this well properly without stopping drilling operation.

• Explain equipment for rigging up WL bellow the rig.

• What are the main issues for running WL bellow the rig?

• What are the financial benefits of running WL bellow the rig?

• Statoil advisor: Knut Müller.

Page 15: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

15 - Classification: Internal 2011-01-19

Wells on GFA

Page 16: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

16 - Classification: Internal 2011-01-19

Page 17: 1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

17 - Classification: Internal 2011-01-19

Presentation title

Presenters name

Presenters title

E-mail address, tel: +00 00 00 00

www.statoil.com

Thank you