1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke –...

26
1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical Specialist Presentation to IAEA Technical Meeting on Human Intrusion and future Human Actions in relation to Disposal of Radioactive Waste Vienna, Austria Human Intrusion scenarios for Human Intrusion scenarios for Radioactive Waste Management Radioactive Waste Management Facilities – Regulatory Guide Facilities – Regulatory Guide and Practices in Canada and Practices in Canada

Transcript of 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke –...

Page 1: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

1

Canadian NuclearSafety Commission

Commission canadiennede sûreté nucléaire

Julie Mecke – Senior Project OfficerShizhong Lei – Geoscience Technical Specialist

Presentation to IAEA Technical Meeting on Human Intrusion and future Human Actions in relation to Disposal of Radioactive WasteVienna, Austria24 -28 September 2012

Human Intrusion scenarios for Human Intrusion scenarios for Radioactive Waste Management Radioactive Waste Management Facilities – Regulatory Guide and Facilities – Regulatory Guide and Practices in CanadaPractices in Canada

Page 2: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

2

Overview

1. Existing Regulatory Guidance on Human Intrusion:Regulatory Guide G-320 (2006) “Assessing the Long-Term Safety of Radioactive Waste Management”

2. Examples of proposed Human Intrusion (HI) scenarios for;• Port Hope Long-term Waste Management Facility

- Surface facility for low-level radioactive waste – licensed, but not constructed

• Deep Geological Repository for low & intermediate-level radioactive waste – undergoing regulatory reviews

• Conceptual Deep Geological Repository for Used Nuclear Fuel (Spent Fuel) – no licence application, looking for site

3. Conclusions

Page 3: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

3

Canadian Nuclear Safety Commission (CNSC) Regulates…

• Uranium mines and mills• Uranium fuel fabricators and processing• Nuclear power plants• Waste management facilities• Nuclear substance processing• Industrial and medical applications• Nuclear research and educational• Export/import control• Radioactive waste management facilities

…From Cradle To Grave

Page 4: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

4

Regulatory Guide G-320: Assessing the Long-Term Safety of Radioactive Waste Management

• Published in December 2006 • Scope:

- Long term care and maintenance considerations; - Setting post-decommissioning objectives; - Establishing assessment criteria; - Assessment strategies and level of detail; - Selecting time frames and defining assessment scenarios; - Identifying receptors and critical groups; and

- Interpretation of assessment results.

Page 5: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

5

Regulatory Guide G-320 on Human Intrusion

1. Scenarios of inadvertent intrusion should estimate the exposure of the intruder not aware

2. Risk Scenarios should be case-specific3. Doses should be predicted

• Both the likelihood and the risk from the intrusion should therefore be reported

4. Reasonable efforts to limit dose from a high-consequence intrusion scenario, and to reduce the probability of intrusion occurring

Page 6: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

6

Example 1 – Port Hope Area Initiative (PHAI)Port Hope Long Term Waste Management Facility (LTWMF)

• Cleanup and safe long-term management of approximately 2 million cubic metres of historic low-level radioactive waste.

• LTWMF Construction expected 2014-2015

Source: AECL, www.phai.ca

Page 7: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

7

PHAI – Port Hope Long-term Waste Management Facility (LTWMF) –Engineered Mound

Page 8: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

8

Port Hope LTWMF – Human Intrusion (HI) Scenario 1

Construction and occupation of residence on Long-term Waste Management Facility (LTWMF)

• Excavate through cover layers to build house foundation on top of MCS;• Occupant spends 75% of the time indoors in the home, with 60% of that time on the main floor and 40% in the basement.

•Pathways: Gamma radiation and radon from radionuclides in MCS or LLRW

Page 9: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

9

Port Hope LTWMF – HI Scenario 1

Construction and occupation of residence on LTWMF

Page 10: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

10

Port Hope LTWMF – HI Scenario 2

Exposure to Marginally Contaminated Soil (MCS) /Low Level Radioactive Waste (LLRW) during excavation

• Cut 4 m x 4 m square area through the cover to the MCS or LLRW • One person on a backhoe and one person watching;• MCS (or LLRW) exposed for 3 hrs; • Backfilled the hole with 1 m of clean soil;• remain for 1 more hour after backfilling.

Page 11: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

11

Port Hope LTWMF – HI Scenario 2

Exposure to MCS/LLRW during excavation

Page 12: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

12

Port Hope LTWMF – HI Scenario 3

Exposure to LLRW removed from LTWMF

- Excavate a bulk sample of LLRW rectangular cube 2.5x2.5x1.6m;- Intruders: a backhoe driver and a spotter (on foot), no shielding, 1m away from waste for 4 hrs and 2m away for 4 hrs.

Principal exposure pathways:External exposure to gamma radiation, and Inhalation of radon gas released to air from the waste deposit.

Page 13: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

13

Port Hope LTWMF – HI Scenario 3

Exposure to LLRW removed from LTWMF

Page 14: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

14

Deep Geological Repository - Ontario Power Generation for its L&ILW (OPG DGR)

• Deep geological repository for OPG’s operating Low- and intermediate-level radioactive waste

Page 15: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

15

OPG DGR

Page 16: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

16

OPG DGR

Source: OPGwww.opg.com

Page 17: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

17

OPG DGR – HI Scenario

Source: OPG

Page 18: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

18

OPG DGR – HI Scenario

Source: OPG

Page 19: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

19

OPG DGR – HI Scenario

Source: OPG

Page 20: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

20

OPG DGR – HI Scenario

Source: OPG

Page 21: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

21

OPG DGR – HI Scenario

Source: OPG

Page 22: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

Conceptual DGR for Canada’s Used Nuclear Fuel – NWMO APM Project

Nuclear Waste Management Organization (NWMO)Established in 2002 in accordance with the Nuclear Fuel Waste Act (NFWA) to assume responsibility for the long-term management of Canada’s used nuclear fuel.

Adaptive Phased Management (APM)•Currently in site selection process •No licence application•Early regulatory involvement

•Review of conceptual design and post-closure safety assessment reports for two hypothetical but realistic sites (crystalline or sedimentary rock)•Presentations to communities, media, municipal forum groups on CNSC’s early role in the APM Project

Page 23: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

23

Example of future HI review – NWMO APM Project

• Site unknown so conducting pre-project conceptual design for sedimentary and crystalline

• Final Crystalline conceptual design to be submitted December 2012 and Sedimentary in April 2013

• CNSC to review for regulatory issues of concern and issue high-level statement

• Any statements do not fetter future licensing decisions

• Requirement for HI scenarios to be included in future licence application

• “Living” Safety Case - HI - If willing and informed site found in suitable rock, the idea would be for the NWMO to use similar methodologies as in pre-project and look at international best practices/ documents

Page 24: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

24

Example of future HI review – NWMO APM ProjectPreliminary review of conceptual design - Crystalline

Preliminary review of draft 2011 “NWMO Interim Pre-Project Report Used Fuel Repository Conceptual Design and Post-closure Safety Assessment in Crystalline Rock”

Proposed Human Intrusion Scenario

• An exploratory borehole is drilled through the geosphere and into the repository. The drill bit is assumed to intersect a used fuel container.

• The drill crew, exposed to contaminated drill slurry spread on the surface around the drill rig and to a core section containing used fuel; and

• A resident at the site, exposed by living nearby and growing food on soil contaminated by drill slurry.

Page 25: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

25

• Human Intrusion is likely one of the scenarios to cause the highest dose to the critical group

• Important topic for stakeholders – asked at outreach meetings

• Current CNSC regulatory guide (G-320, 2006) is high-level

• Development of future regulatory guidance

• International co-operation to develop a guide on developing credible and conservative human intrusion scenarios is very important for the CNSC.

• Support international workshop - long time scales of projects – important to keep knowledge management of this topic and to learn from other countries

Saskatoon, January 2011 25

Concluding Comments

Page 26: 1 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Julie Mecke – Senior Project Officer Shizhong Lei – Geoscience Technical.

26