1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is...

27
1 BLUE OAKS PUBLIC ADJUSTING Insured: Nguyen Property: 11350 Ferrara Ln Porter Ranch, CA 91326 Claim Rep.: Scott Jenkins Business: (949) 633-7617 Business: (310) 684-7559 Estimator: David Tyler Business: 224 Sapphire Ave Newport Beach, CA 92662 Claim Number: 3109509 Policy Number: WNG 0643208-00(04) Type of Loss: Water Damage Coverage Deductible Policy Limit Dwelling $0.00 $0.00 Other Structures $0.00 $0.00 Contents $0.00 $0.00 Date of Loss: 1/30/2017 Date Received: Date Inspected: Date Entered: 2/25/2017 11:22 AM Price List: CAFS7X_JAN17 Restoration/Service/Remodel Estimate: 11350_FERRARA The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting (BOPA). The purpose of this estimate is to establish a working scope/estimate for the use by the insured and/or the insureds contractor or the insurance company. All items in this estimate are based on the current conditions at the time of inspection. Any hidden or unforeseen damages are excluded from this estimate unless listed or noted. This estimate is subject to the terms and conditions of the insurance policy in place at the time of the loss. This estimate and report and all its contents are the sole property of Blue Oaks Public Adjusting., and (BOPA) maintains and controls ownership of said estimate and report. Any alterations, additions, omissions or dissemination of this estimate or report without the written consent of Blue Oaks Public Adjusting. is strictly forbidden. Blue Oaks Public Adjusting. shall not be held responsible for the use of, or any changes made to this estimate or report without its written consent.

Transcript of 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is...

Page 1: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

1

BLUE OAKS PUBLIC ADJUSTING

Insured: NguyenProperty: 11350 Ferrara Ln

Porter Ranch, CA 91326

Claim Rep.: Scott Jenkins Business: (949) 633-7617

Business: (310) 684-7559Estimator: David TylerBusiness: 224 Sapphire Ave

Newport Beach, CA 92662

Claim Number: 3109509 Policy Number: WNG 0643208-00(04) Type of Loss: Water Damage

Coverage Deductible Policy Limit

Dwelling $0.00 $0.00

Other Structures $0.00 $0.00

Contents $0.00 $0.00

Date of Loss: 1/30/2017 Date Received:Date Inspected: Date Entered: 2/25/2017 11:22 AM

Price List: CAFS7X_JAN17Restoration/Service/Remodel

Estimate: 11350_FERRARA

The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting (BOPA).

The purpose of this estimate is to establish a working scope/estimate for the use by the insured and/or the insuredscontractor or the insurance company. All items in this estimate are based on the current conditions at the time ofinspection. Any hidden or unforeseen damages are excluded from this estimate unless listed or noted. This estimate issubject to the terms and conditions of the insurance policy in place at the time of the loss.

This estimate and report and all its contents are the sole property of Blue Oaks Public Adjusting., and (BOPA) maintains andcontrols ownership of said estimate and report. Any alterations, additions, omissions or dissemination of this estimate or reportwithout the written consent of Blue Oaks Public Adjusting. is strictly forbidden. Blue Oaks Public Adjusting. shall not be heldresponsible for the use of, or any changes made to this estimate or report without its written consent.

Page 2: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

2

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 2

11350_FERRARA

General Items

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

PERMITS & FEES

1. FEE TIPF Taxes, insurance, permits & fees (Bid item) Based on 1.5% of the sub total cost before O&P

1 1.00 EA 1,077.99[*D] 0/NA Normal 0% AS INCURRED

2. FEE LEAD Lead test fee - full service lead survey

1 1.00 EA 420.00[D] 0/NA Normal 0% BY OTHERS

3. FEE ASBT Asbestos test fee - full service asbestos survey

1 1.00 EA 522.50[D] 0/NA Normal 0% BY OTHERS

4. FEE ENG Engineering fees (Bid item)

1 1.00 EA [D] 0/NA Normal 0% BY OTHERS

5. LAB SUPERR Residential Supervision / Project Management - per hour

1.5*2*5*4*3 180.00 HR 61.43[D] 11,057.40 0/NA Normal 0% (0.00) 11,057.40

Supervision is required by the CSLB license requirements that the licensee or a manager inspect every job site each day until complete. Supervision isnot covered in Xactimates O&P according to Xactimates white pages. The line items includes 2 trips per day for the duration of the repairs. 1.5 hourseach trip, first to allow sub contractors into the site and one trip to return check & secure the site.

"Cal. Admin. Code tit. 16, § 823(a). "Direct supervision andcontrol" "includes any one or any combination of the followingactivities: supervising construction, managing constructionactivities by making technical and administrative decisions,checking jobs for proper workmanship, or direct supervision onconstruction job sites.Section 7068 requires every license to have a qualifier, whichmay be a Sole Owner, Qualified Partner, Responsible ManagingOfficer (RMO), Responsible Managing Employee (RME), ResponsibleManaging Manager or Responsible Managing Member. The qualifieris the person who is listed in the Contractor State LicenseBoards’ (CSLB) personnel of record, has demonstrated his/herknowledge and experience though the CSLB’s licensing process,and holds one or more license classifications.UPDATE: CSLB, CSLB to Get Tough on RMO Abuses (Summer 2014) Starting on January 1, 2014, amended Section 7068.1 of California’sContractors State License Law, Bus. & Prof. Code §§ 7200 et seq., requires licensees’ qualifiers toexercise direct supervision and control over the licensees’operations to ensure compliance with California’s ContractorsState License Law. The amended lawcontemplates activeinvolvement by the qualifier, and makes aviolation of Section 7068.1 grounds for disciplinary action anda misdemeanor punishable by imprisonment in a county jail and/ora fine.Direct supervision is required by the HOA as this is a gated private community.

DEMOLITION

6. DMO DUMP Dumpster load - Approx. 20 yards, 4 tons of debris

1 1.00 EA 497.00[D] 497.00 0/NA Normal 0% (0.00) 497.00

7. DMO PU Haul debris - per pickup truck load - including dump fees

3+1 4.00 EA 128.13 512.52 0/NA Normal 0% (0.00) 512.52

Page 3: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

3

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 3

CONTINUED - General Items

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

Small truck for progressive/course of construction debris removal 1 per month and 1 for final cleaning.

TEMPORARY REPAIRS

8. TMP TLT Temporary toilet (per month)

3 3.00 MO 161.50[D] 484.50 0/NA Normal 0% (0.00) 484.50

9. TMP POW Temporary power usage (per month)

3 3.00 MO 279.76[D] 839.28 0/NA Normal 0% (0.00) 839.28

PLUMBING

10. PLM LAB Plumber - per hour

6 6.00 HR 95.98[D] 575.88 0/NA Normal 0% (0.00) 575.88

Labot to perform a gas air test.

HVAC

11. HVC FRCLN Furnace - check, clean, replace filters and service

1 1.00 EA 126.84 126.84 0/NA Normal 0% (0.00) 126.84

12. CLN DCTV Clean ductwork - Interior (PER REGISTER)

15 15.00 EA 31.38 470.70 0/NA Normal 0% (0.00) 470.70

CLEANING

13. CLN LAB Cleaning Technician - per hour

16 16.00 HR 36.19[D] 579.04 0/NA Normal 0% (0.00) 579.04

Progressive/course of construction cleaning required by CALOSHA and the building department. This also accounts for the common areas.

14. CLN FINALR Final cleaning - construction - Residential

1691. 3,019.92 SF 0.29 875.78 0/NA Normal 0% (0.00) 875.7825+1328.67

Final Cleaning.

NOTES

Code improvements are not included unless listed in estimate.( Open Item )

Mold testing/remediation if needed ( by others ).

Hazardous waste testing or removal ( not included ).

Structural/Electrical/Mechanical/Title 24/Engineering if required. ( By Others )

This estimate was produced with out the benefit of approved plans & could be subject to change. (Open Item)

Totals: General Items 16,018.94 0.00 16,018.94

Exterior

Page 4: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

4

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 4

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

The stucco was opened during the EMS work and will be patched. The stucco is color coated and will need to be recolor coated in uniformity. The HOAhas very strict regulations that govern the appearance of the exterior of the house. Due to the age of the color coat, matching will not be an option.

15. STU PATCH Stucco patch / small repair - ready for color

1 1.00 EA 166.11 166.11 0/100 yrs Normal 0% (0.00) 166.11

16. CLN SB Sandblasting

3146.99 3,146.99 SF 1.00 3,146.99 0/NA Normal 0% (0.00) 3,146.99

Sandblast the finish coat of the stucco.

17. STU COLOR Stucco color coat (Redash) - sand texture

3146.99 3,146.99 SF 2.49 7,836.01 0/100 yrs Normal 0% (0.00) 7,836.01

18. SCF BIDITM Scaffolding (Per SF of the wall area)

3146.99 3,146.99 EA 1.25[D] 3,933.74 0/NA Normal 0% (0.00) 3,933.74

19. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

198.33 198.33 LF 1.08 214.20 0/15 yrs Normal 0% (0.00) 214.20

Totals: Exterior 15,297.05 0.00 15,297.05

1st Floor

Kitchen Height: 9'

334.72 SF Walls

513.34 SF Walls & Ceiling

19.85 SY Flooring

39.25 LF Ceil. Perimeter

178.62 SF Ceiling

178.62 SF Floor

39.25 LF Floor Perimeter

Missing Wall 12' 3" X 9' Opens into FAMILY_ROOM

Missing Wall 2' 4" X 9' Opens into FAMILY_ROOM

Window 3' 10" X 4' 10" Opens into Exterior

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

20. INS BT4+ Batt insulation - 4" - R13 - unfaced batt

2*14,7+3*9 56.17 SF 0.69 38.76 0/150 yrs Normal 0% (0.00) 38.76

21. INS BT6 Batt insulation - 6" - R19 - unfaced batt

3*3 9.00 SF 0.92 8.28 0/150 yrs Normal 0% (0.00) 8.28

22. DRY LF5/8 5/8" - drywall per LF - up to 2' tall

14,7+7 21.58 LF 7.16 154.51 0/150 yrs Normal 0% (0.00) 154.51

23. DRY 5/8- 5/8" drywall - hung, taped, ready for texture

3*9+3*3 36.00 SF 1.60 57.60 0/150 yrs Normal 0% (0.00) 57.60

Page 5: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

5

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 5

CONTINUED - Kitchen

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

24. DRY TEX++ Texture drywall - smooth / skim coat

WC 513.34 SF 0.95 487.67 0/150 yrs Normal 0% (0.00) 487.67

25. PNT P2 Paint the walls and ceiling - two coats

WC 513.34 SF 0.76 390.14 0/15 yrs Normal 0% (0.00) 390.14

26. CAB CUB++ Custom cabinets - base units - Island

CABCUB_4. 4.00 LF 605.69 2,422.76 0/50 yrs Normal 0% (0.00) 2,422.76LL

27. CAB CUB Custom cabinets - base units

CABCUB_1. 22.76 LF 214.69 4,886.34 0/50 yrs Normal 0% (0.00) 4,886.34LL+CABCUB_0.LL+CABCUB_2.LL+CABCUB_3.LL

28. APP DW (Install) Dishwasher

APPDW_0. 1.00 EA 102.38 102.38 0/9 yrs Normal 0% (0.00) 102.38EA

29. APP GD (Install) Garbage disposer

1 1.00 EA 88.27 88.27 0/12 yrs Normal 0% (0.00) 88.27

30. PLM STOP R&R Angle stop valve

2 2.00 EA 32.68 65.36 0/100 yrs Normal 0% (0.00) 65.36

31. PLM PTRAP P-trap assembly - ABS (plastic)

1 1.00 EA 48.80 48.80 0/25 yrs Normal 0% (0.00) 48.80

32. PLM RO (Install) Reverse osmosis water treatment system - 30 gpd

1 1.00 EA 245.71 245.71 0/10 yrs Normal 0% (0.00) 245.71

33. CAB CTDK Countertop subdeck - plywood

2*22. 59.52 SF 2.96 176.18 0/150 yrs Normal 0% (0.00) 176.1876+2*2+2,6*4

34. CAB CTGM+ Countertop - Granite or Marble - High grade

59. 101.65 SF 73.30 7,450.95 0/150 yrs Normal 0% (0.00) 7,450.9552+1,6*10+1,6*14,7+1,6*3,6

35. CAB CTGE+ Add on Granite or Marble - edge treatment - High grade

2+8+10,7+2,6 23.08 LF 32.82 757.49 0/150 yrs Normal 0% (0.00) 757.49

36. CAB CTGMSD Add on for undermount sink cutout & polish - double basin

2 2.00 EA 229.77 459.54 0/150 yrs Normal 0% (0.00) 459.54

One for the sink and one for the cooktop.

Page 6: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

6

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 6

CONTINUED - Kitchen

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

37. APP CT (Install) Cooktop - electric

1 1.00 EA 81.50 81.50 0/13 yrs Normal 0% (0.00) 81.50

38. PLM FT1/2C2 Flexible gas supply line connector - 1/2" - up to 24"

1 1.00 EA 35.30 35.30 0/36 yrs Normal 0% (0.00) 35.30

39. PLM SNKD (Install) Sink - double

1 1.00 EA 91.41 91.41 0/50 yrs Normal 0% (0.00) 91.41

40. PLM FAU (Install) Sink faucet - Kitchen

1 1.00 EA 61.43 61.43 0/15 yrs Normal 0% (0.00) 61.43

41. APP HDSS (Install) Range hood - stainless steel

1 1.00 EA 90.76 90.76 0/14 yrs Normal 0% (0.00) 90.76

42. APP OVBID+ Detach & Reset Built-in double oven - High grade

1 1.00 EA 174.80 174.80 0/15 yrs Normal 0% (0.00) 174.80

43. APP RFBI>+ Detach & Reset Built-in refrigerator - 42" - High grade

1 1.00 EA 547.06 547.06 0/13 yrs Normal 0% (0.00) 547.06

44. CAB CUFH R&R Custom cabinets - full height units

CABCUFH_ 4.69 LF 312.86 1,467.31 0/50 yrs Normal 0% (0.00) 1,467.310.LL+CABCUFH_1.LL

45. CAB CUW36 R&R Custom cabinets - wall units - 36" tall

CABCUW36_ 18.09 LF 165.04 2,985.57 0/50 yrs Normal 0% (0.00) 2,985.570.LL+CABCUW36_2.LL+CABCUW36_1.LL+CABCUW36_3.LL+CABCUW36_4.LL

46. CAB CUW24 R&R Custom cabinets - wall units - up to 24" tall

CABCUW24_ 6.74 LF 148.78 1,002.78 0/50 yrs Normal 0% (0.00) 1,002.780.LL+CABCUW24_1.LL

47. LIT FL Detach & Reset Fluorescent light fixture

8 8.00 EA 63.35 506.80 0/20 yrs Normal 0% (0.00) 506.80

Under cabinet lights.

48. FNC CWN6 Remove Crown molding - 5 3/8" to 6"

.5PC 19.63 LF 0.56 10.99 0/150 yrs Normal 0% (0.00) 10.99

Page 7: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

7

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 7

CONTINUED - Kitchen

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

49. FNC CWN6 Crown molding - 5 3/8" to 6"

PC 39.25 LF 5.22 204.89 0/150 yrs Normal 0% (0.00) 204.89

50. PNT CWN>2 Paint crown molding, oversized - two coats

PC 39.25 LF 1.22 47.89 0/15 yrs Normal 0% (0.00) 47.89

51. LIT RCTRS Recessed light fixture - Detach & reset trim only

7 7.00 EA 3.03 21.21 0/NA Normal 0% (0.00) 21.21

52. HVC REGRS Heat/AC register - Mechanically attached - Detach & reset

1 1.00 EA 13.01 13.01 0/NA Normal 0% (0.00) 13.01

53. FRM SH1/2F (Material Only) Sheathing - plywood - 1/2" Struct-1

3*9 27.00 SF 1.30 35.10 0/150 yrs Normal 0% (0.00) 35.10

54. FRM LAB Carpenter - General Framer - per hour

2*8 16.00 HR 72.30[D] 1,156.80 0/NA Normal 0% (0.00) 1,156.80

55. WDT BLNDRS Window blind - horizontal or vertical - Detach & reset

1 1.00 EA 35.05 35.05 0/NA Normal 0% (0.00) 35.05

56. FNC B4 Baseboard - 4 1/4"

PF 39.25 LF 3.73 146.40 0/150 yrs Normal 0% (0.00) 146.40

57. PNT B2 Paint baseboard - two coats

PF 39.25 LF 1.12 43.96 0/15 yrs Normal 0% (0.00) 43.96

58. FNC SHOE+ Base shoe - stain grade

PF 39.25 LF 1.35 52.99 0/150 yrs Normal 0% (0.00) 52.99

59. PNT BS Stain & finish baseboard

PF 39.25 LF 1.24 48.67 0/15 yrs Normal 0% (0.00) 48.67

60. FCW AVPF Remove Pre-finished solid wood flooring

.25F 44.65 SF 1.93 86.17 0/150 yrs Normal 0% (0.00) 86.17

61. FCW AVPF Pre-finished solid wood flooring

F-59.52 119.10 SF 8.52 1,014.73 0/150 yrs Normal 0% (0.00) 1,014.73

62. FCW GADDC Add for glued down application over concrete substrate

F-59.52 119.10 SF 1.05 125.06 0/150 yrs Normal 0% (0.00) 125.06

63. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 39.25 LF 1.08 42.39 0/15 yrs Normal 0% (0.00) 42.39

Totals: Kitchen 27,970.77 0.00 27,970.77

Page 8: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

8

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 8

Family Room Height: 9'

359.21 SF Walls

637.25 SF Walls & Ceiling

30.89 SY Flooring

56.67 LF Ceil. Perimeter

278.04 SF Ceiling

278.04 SF Floor

47.17 LF Floor Perimeter

Missing Wall 12' 3" X 9' Opens into KITCHEN

Missing Wall 2' 8" X 9' Opens into KITCHEN

Door 6' X 6' 8" Opens into Exterior

Window 7' 10" X 5' 10" Opens into Exterior

Window 2' 10" X 4' 10" Opens into LIVING_ROOM

Window 2' 10" X 4' 10" Opens into LIVING_ROOM

Window 2' 10" X 4' 10" Opens into LIVING_ROOM

Missing Wall - Goes to Floor 3' 6" X 8' Opens into OFFSET

Subroom: FH (1) Height: 9'

66.75 SF Walls

73.01 SF Walls & Ceiling

0.70 SY Flooring

7.42 LF Ceil. Perimeter

6.26 SF Ceiling

6.26 SF Floor

7.42 LF Floor Perimeter

Missing Wall 3' 5" X 9' Opens into FAMILY_ROOM

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

64. FCW GADDC Add for glued down application over concrete substrate

F 284.31 SF 2.29 651.07 0/150 yrs Normal 0% (0.00) 651.07

65. FCW AVPF R&R Pre-finished solid wood flooring

F 284.31 SF 10.45 2,971.04 0/150 yrs Normal 0% (0.00) 2,971.04

66. FNC B4 R&R Baseboard - 4 1/4"

PF 54.58 LF 4.11 224.32 0/150 yrs Normal 0% (0.00) 224.32

67. PNT B2 Paint baseboard - two coats

PF 54.58 LF 1.12 61.13 0/15 yrs Normal 0% (0.00) 61.13

68. FNC SHOE+ R&R Base shoe - stain grade

PF 54.58 LF 1.49 81.32 0/150 yrs Normal 0% (0.00) 81.32

69. PNT BS Stain & finish baseboard

PF 54.58 LF 1.24 67.68 0/15 yrs Normal 0% (0.00) 67.68

70. PNT P2 Paint the walls and ceiling - two coats

WC 710.27 SF 0.76 539.81 0/15 yrs Normal 0% (0.00) 539.81

Page 9: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

9

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 9

CONTINUED - Family Room

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

71. FNC CWN6 R&R Crown molding - 5 3/8" to 6"

PC 64.08 LF 5.78 370.38 0/150 yrs Normal 0% (0.00) 370.38

72. PNT CWN>2 Paint crown molding, oversized - two coats

PC 64.08 LF 1.22 78.18 0/15 yrs Normal 0% (0.00) 78.18

73. LIT TRK Detach & Reset Track lighting - track only

10 10.00 LF 8.45 84.50 0/20 yrs Normal 0% (0.00) 84.50

74. LIT TRKCN Detach & Reset Fixture (can) for track lighting

4 4.00 EA 13.60 54.40 0/20 yrs Normal 0% (0.00) 54.40

75. FNH TVW Detach & Reset TV Brackets - Wall mounted

1 1.00 EA 85.77 85.77 0/50 yrs Normal 0% (0.00) 85.77

76. HVC REGRS Heat/AC register - Mechanically attached - Detach & reset

1 1.00 EA 13.01 13.01 0/NA Normal 0% (0.00) 13.01

77. WDT BLNDRS Window blind - horizontal or vertical - Detach & reset

2 2.00 EA 35.05 70.10 0/NA Normal 0% (0.00) 70.10

78. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 64.08 LF 1.08 69.21 0/15 yrs Normal 0% (0.00) 69.21

Totals: Family Room 5,421.92 0.00 5,421.92

Fireplace Height: 9'

157.50 SF Walls

169.31 SF Walls & Ceiling

1.31 SY Flooring

17.50 LF Ceil. Perimeter

11.81 SF Ceiling

11.81 SF Floor

17.50 LF Floor Perimeter

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

For the purpose of the sketch

Totals: Fireplace 0.00 0.00 0.00

Page 10: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

10

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 10

Dining Room Height: 9'

304.06 SF Walls

451.07 SF Walls & Ceiling

16.33 SY Flooring

36.92 LF Ceil. Perimeter

147.01 SF Ceiling

147.01 SF Floor

36.92 LF Floor Perimeter

Missing Wall 12' 1" X 9' Opens into OFFSET

Window 5' 10" X 4' 10" Opens into Exterior

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

79. FCW GADDC Add for glued down application over concrete substrate

F 147.01 SF 2.29 336.65 0/150 yrs Normal 0% (0.00) 336.65

80. FCW AVPF R&R Pre-finished solid wood flooring

F 147.01 SF 10.45 1,536.26 0/150 yrs Normal 0% (0.00) 1,536.26

81. FNC B4 R&R Baseboard - 4 1/4"

PF 36.92 LF 4.11 151.74 0/150 yrs Normal 0% (0.00) 151.74

82. PNT B2 Paint baseboard - two coats

PF 36.92 LF 1.12 41.35 0/15 yrs Normal 0% (0.00) 41.35

83. FNC SHOE+ R&R Base shoe - stain grade

PF 36.92 LF 1.49 55.01 0/150 yrs Normal 0% (0.00) 55.01

84. PNT BS Stain & finish baseboard

PF 36.92 LF 1.24 45.78 0/15 yrs Normal 0% (0.00) 45.78

85. PNT P2 Paint the walls - two coats

W 304.06 SF 0.76 231.09 0/15 yrs Normal 0% (0.00) 231.09

86. HVC REGRS Heat/AC register - Mechanically attached - Detach & reset

1 1.00 EA 13.01 13.01 0/NA Normal 0% (0.00) 13.01

87. WDT BLNDRS Window blind - horizontal or vertical - Detach & reset

1 1.00 EA 35.05 35.05 0/NA Normal 0% (0.00) 35.05

88. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 36.92 LF 1.08 39.87 0/15 yrs Normal 0% (0.00) 39.87

Totals: Dining Room 2,485.81 0.00 2,485.81

Page 11: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

11

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 11

Living Room Height: 18' 1"

859.08 SF Walls

1,114.82 SF Walls & Ceiling

28.42 SY Flooring

66.66 LF Ceil. Perimeter

255.74 SF Ceiling

255.74 SF Floor

63.66 LF Floor Perimeter

Window 2' 10" X 4' 10" Opens into FAMILY_ROOM

Window 2' 10" X 4' 10" Opens into FAMILY_ROOM

Window 2' 10" X 4' 10" Opens into FAMILY_ROOM

Window 3' 10" X 4' 10" Opens into Exterior

Window 3' 10" X 4' 10" Opens into Exterior

Window 3' 10" X 4' 10" Opens into Exterior

Window 3' 10" X 4' 10" Opens into Exterior

Window 2' 10" X 4' 10" Opens into Exterior

Window 2' 10" X 4' 10" Opens into Exterior

Door 3' X 6' 8" Opens into Exterior

Window 1' 11 15/16" X 3' Opens into Exterior

Window 1' 6" X 4' 10" Opens into Exterior

Missing Wall - Goes to Ceiling 8' 11 1/16" X 13' 1" Opens into VOID

Subroom: Offset (1) Height: 9'

214.85 SF Walls

295.64 SF Walls & Ceiling

8.98 SY Flooring

31.50 LF Ceil. Perimeter

80.79 SF Ceiling

80.79 SF Floor

22.75 LF Floor Perimeter

Missing Wall - Goes to Floor 3' 6" X 8' Opens into FAMILY_ROOM

Missing Wall 3' 3" X 9' Opens into VOID

Missing Wall 2' 6" X 9' Opens into HALLWAY_2

Missing Wall 2' 9" X 9' Opens into HALLWAY_1

Missing Wall 12' 1" X 9' Opens into DINING_ROOM

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

89. FCW GADDC Add for glued down application over concrete substrate

F 336.53 SF 2.29 770.66 0/150 yrs Normal 0% (0.00) 770.66

90. FCW AVPF R&R Pre-finished solid wood flooring

F 336.53 SF 10.45 3,516.74 0/150 yrs Normal 0% (0.00) 3,516.74

91. FNC B4 R&R Baseboard - 4 1/4"

PF 86.41 LF 4.11 355.15 0/150 yrs Normal 0% (0.00) 355.15

Page 12: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

12

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 12

CONTINUED - Living Room

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

92. PNT B2 Paint baseboard - two coats

PF 86.41 LF 1.12 96.78 0/15 yrs Normal 0% (0.00) 96.78

93. FNC SHOE+ R&R Base shoe - stain grade

PF 86.41 LF 1.49 128.75 0/150 yrs Normal 0% (0.00) 128.75

94. PNT BS Stain & finish baseboard

PF 86.41 LF 1.24 107.15 0/15 yrs Normal 0% (0.00) 107.15

95. PNT P2 Paint the walls - two coats

W 1,073.92 SF 0.76 816.18 0/15 yrs Normal 0% (0.00) 816.18

96. HVC REGRS Heat/AC register - Mechanically attached - Detach & reset

2 2.00 EA 13.01 26.02 0/NA Normal 0% (0.00) 26.02

97. WDT BLNDRS Window blind - horizontal or vertical - Detach & reset

4 4.00 EA 35.05 140.20 0/NA Normal 0% (0.00) 140.20

98. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 98.16 LF 1.08 106.01 0/15 yrs Normal 0% (0.00) 106.01

Totals: Living Room 6,063.64 0.00 6,063.64

Hallway 1 Height: 8'

84.44 SF Walls

101.44 SF Walls & Ceiling

1.89 SY Flooring

17.33 LF Ceil. Perimeter

17.00 SF Ceiling

17.00 SF Floor

9.75 LF Floor Perimeter

Door 2' 4" X 6' 8" Opens into BATHROOM

Door 2' 6" X 6' 8" Opens into BEDROOM

Missing Wall 2' 9" X 8' Opens into OFFSET

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

99. FCW GADDC Add for glued down application over concrete substrate

F 17.00 SF 2.29 38.93 0/150 yrs Normal 0% (0.00) 38.93

100. FCW AVPF R&R Pre-finished solid wood flooring

F 17.00 SF 10.45 177.65 0/150 yrs Normal 0% (0.00) 177.65

Page 13: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

13

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 13

CONTINUED - Hallway 1

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

101. FNC B4 R&R Baseboard - 4 1/4"

PF 9.75 LF 4.11 40.08 0/150 yrs Normal 0% (0.00) 40.08

102. PNT B2 Paint baseboard - two coats

PF 9.75 LF 1.12 10.92 0/15 yrs Normal 0% (0.00) 10.92

103. FNC SHOE+ R&R Base shoe - stain grade

PF 9.75 LF 1.49 14.53 0/150 yrs Normal 0% (0.00) 14.53

104. PNT BS Stain & finish baseboard

PF 9.75 LF 1.24 12.09 0/15 yrs Normal 0% (0.00) 12.09

105. PNT P2 Paint the walls - two coats

W 84.44 SF 0.76 64.17 0/15 yrs Normal 0% (0.00) 64.17

106. PNT DORT Paint door/window trim & jamb - 2 coats (per side)

2 2.00 EA 24.40 48.80 0/15 yrs Normal 0% (0.00) 48.80

107. PNT DOR Paint door slab only - 2 coats (per side)

2 2.00 EA 29.26 58.52 0/15 yrs Normal 0% (0.00) 58.52

108. FNH DORHRS Door lockset - Detach & reset

1 1.00 EA 23.39 23.39 0/NA Normal 0% (0.00) 23.39

109. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 17.33 LF 1.08 18.72 0/15 yrs Normal 0% (0.00) 18.72

Totals: Hallway 1 507.80 0.00 507.80

Bathroom Height: 9'

232.44 SF Walls

279.67 SF Walls & Ceiling

5.25 SY Flooring

28.00 LF Ceil. Perimeter

47.22 SF Ceiling

47.22 SF Floor

25.67 LF Floor Perimeter

Window 4' X 1' Opens into Exterior

Door 2' 4" X 6' 8" Opens into HALLWAY_1

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

For the purpose of the sketch

Page 14: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

14

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 14

CONTINUED - Bathroom

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

Totals: Bathroom 0.00 0.00 0.00

Bedroom Height: 9'

345.14 SF Walls

459.74 SF Walls & Ceiling

12.73 SY Flooring

43.33 LF Ceil. Perimeter

114.60 SF Ceiling

114.60 SF Floor

40.83 LF Floor Perimeter

Window 5' 10" X 4' 10" Opens into Exterior

Door 2' 6" X 6' 8" Opens into HALLWAY_1

Subroom: Closet (1) Height: 8'

120.00 SF Walls

131.28 SF Walls & Ceiling

1.25 SY Flooring

15.00 LF Ceil. Perimeter

11.28 SF Ceiling

11.28 SF Floor

15.00 LF Floor Perimeter

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

110. FCW GADDC Add for glued down application over concrete substrate

F 125.89 SF 2.29 288.28 0/150 yrs Normal 0% (0.00) 288.28

111. FCW AVPF R&R Pre-finished solid wood flooring

F 125.89 SF 10.45 1,315.55 0/150 yrs Normal 0% (0.00) 1,315.55

112. FNC B4 R&R Baseboard - 4 1/4"

PF 55.83 LF 4.11 229.47 0/150 yrs Normal 0% (0.00) 229.47

113. PNT B2 Paint baseboard - two coats

PF 55.83 LF 1.12 62.53 0/15 yrs Normal 0% (0.00) 62.53

114. FNC SHOE+ R&R Base shoe - stain grade

PF 55.83 LF 1.49 83.19 0/150 yrs Normal 0% (0.00) 83.19

115. PNT BS Stain & finish baseboard

PF 55.83 LF 1.24 69.23 0/15 yrs Normal 0% (0.00) 69.23

Page 15: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

15

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 15

CONTINUED - Bedroom

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

116. PNT P2 Paint the walls - two coats

W 465.14 SF 0.76 353.51 0/15 yrs Normal 0% (0.00) 353.51

117. HVC REGRS Heat/AC register - Mechanically attached - Detach & reset

2 2.00 EA 13.01 26.02 0/NA Normal 0% (0.00) 26.02

118. WDT BLNDRS Window blind - horizontal or vertical - Detach & reset

1 1.00 EA 35.05 35.05 0/NA Normal 0% (0.00) 35.05

119. DOR DORRS Interior door - Detach & reset

1 1.00 EA 75.06 75.06 0/NA Normal 0% (0.00) 75.06

120. PNT DORT Paint door/window trim & jamb - 2 coats (per side)

1 1.00 EA 24.40 24.40 0/15 yrs Normal 0% (0.00) 24.40

121. PNT DOR Paint door slab only - 2 coats (per side)

1 1.00 EA 29.26 29.26 0/15 yrs Normal 0% (0.00) 29.26

122. FNH DORHRS Door lockset - Detach & reset

1 1.00 EA 23.39 23.39 0/NA Normal 0% (0.00) 23.39

123. DOR BPRS Bypass (sliding) door set - slabs only - Detach & reset

1 1.00 EA 28.84 28.84 0/NA Normal 0% (0.00) 28.84

124. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 58.33 LF 1.08 63.00 0/15 yrs Normal 0% (0.00) 63.00

Totals: Bedroom 2,706.78 0.00 2,706.78

Hallway 2 Height: 8'

90.37 SF Walls

108.97 SF Walls & Ceiling

2.07 SY Flooring

17.56 LF Ceil. Perimeter

18.60 SF Ceiling

18.60 SF Floor

10.56 LF Floor Perimeter

Missing Wall 2' 6" X 8' Opens into OFFSET

Door 2' 6" X 6' 8" Opens into LAUNDRY_ROOM

Page 16: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

16

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 16

Subroom: Closet (1) Height: 8'

62.67 SF Walls

67.92 SF Walls & Ceiling

0.58 SY Flooring

9.50 LF Ceil. Perimeter

5.25 SF Ceiling

5.25 SF Floor

7.50 LF Floor Perimeter

Door 2' X 6' 8" Opens into HALLWAY_2

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

125. FCW GADDC Add for glued down application over concrete substrate

F 23.85 SF 2.29 54.61 0/150 yrs Normal 0% (0.00) 54.61

126. FCW AVPF R&R Pre-finished solid wood flooring

F 23.85 SF 10.45 249.23 0/150 yrs Normal 0% (0.00) 249.23

127. FNC B4 R&R Baseboard - 4 1/4"

PF 18.06 LF 4.11 74.22 0/150 yrs Normal 0% (0.00) 74.22

128. PNT B2 Paint baseboard - two coats

PF 18.06 LF 1.12 20.23 0/15 yrs Normal 0% (0.00) 20.23

129. FNC SHOE+ R&R Base shoe - stain grade

PF 18.06 LF 1.49 26.91 0/150 yrs Normal 0% (0.00) 26.91

130. PNT BS Stain & finish baseboard

PF 18.06 LF 1.24 22.39 0/15 yrs Normal 0% (0.00) 22.39

131. PNT P2 Paint the walls - two coats

W 153.03 SF 0.76 116.30 0/15 yrs Normal 0% (0.00) 116.30

132. PNT DORT Paint door/window trim & jamb - 2 coats (per side)

3 3.00 EA 24.40 73.20 0/15 yrs Normal 0% (0.00) 73.20

133. DOR DORRS Interior door - Detach & reset

1 1.00 EA 75.06 75.06 0/NA Normal 0% (0.00) 75.06

134. PNT DOR Paint door slab only - 2 coats (per side)

3 3.00 EA 29.26 87.78 0/15 yrs Normal 0% (0.00) 87.78

135. FNH DORHRS Door lockset - Detach & reset

1 1.00 EA 23.39 23.39 0/NA Normal 0% (0.00) 23.39

136. PNT MASKLF Mask and prep for paint - plastic, paper, tape (per LF)

PC 27.06 LF 1.08 29.22 0/15 yrs Normal 0% (0.00) 29.22

Totals: Hallway 2 852.54 0.00 852.54

Page 17: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

17

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 17

Laundry Room Height: 8'

194.89 SF Walls

240.81 SF Walls & Ceiling

5.10 SY Flooring

28.67 LF Ceil. Perimeter

45.92 SF Ceiling

45.92 SF Floor

23.50 LF Floor Perimeter

Door 2' 6" X 6' 8" Opens into HALLWAY_2

Door 2' 8" X 6' 8" Opens into GARAGE

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

For the purpose of the sketch

Totals: Laundry Room 0.00 0.00 0.00

Garage Height: 9'

605.14 SF Walls

1,048.89 SF Walls & Ceiling

49.31 SY Flooring

84.83 LF Ceil. Perimeter

443.75 SF Ceiling

443.75 SF Floor

62.08 LF Floor Perimeter

Door 2' 8" X 6' 8" Opens into LAUNDRY_ROOM

Door 12' 1" X 7' Opens into Exterior

Door 8' X 7' Opens into Exterior

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

For the purpose of the sketch

Totals: Garage 0.00 0.00 0.00

Page 18: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

18

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 18

Void Height: 18' 1"

227.83 SF Walls

257.17 SF Walls & Ceiling

3.26 SY Flooring

20.56 LF Ceil. Perimeter

29.34 SF Ceiling

29.34 SF Floor

20.56 LF Floor Perimeter

Missing Wall - Goes to Ceiling 8' 11 1/16" X 13' 1" Opens into LIVING_ROOM

Missing Wall 3' 3" X 18' 1" Opens into OFFSET

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

For the purpose of the sketch

Totals: Void 0.00 0.00 0.00

Total: 1st Floor 0.00 46,009.26

2nd Floor

Stairs Height: 17'

40.03 SF Walls & Ceiling

8.52 SY Flooring

40.03 SF Ceiling

76.70 SF Floor

Missing Wall 3' 8" X 17' Opens into Exterior

Missing Wall 11' 1/8" X 17' Opens into Exterior

Missing Wall 3' 4 5/8" X 17' Opens into Exterior

Missing Wall 9' 7 1/4" X 17' Opens into Exterior

Page 19: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

19

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 19

Subroom: Landing (1) Height: 11'

84.91 SF Walls

102.28 SF Walls & Ceiling

1.93 SY Flooring

5.61 LF Ceil. Perimeter

17.37 SF Ceiling

17.37 SF Floor

5.61 LF Floor Perimeter

Missing Wall 3' 6" X 11' Opens into Exterior

Missing Wall 2' 8 5/8" X 11' Opens into UPPER_LANDIN

Missing Wall 3' 6" X 11' Opens into UPPER_STAIRS

Missing Wall 1' 6" X 11' Opens into OFFSET

Subroom: Upper Stairs (2) Height: 8'

12.06 SF Walls & Ceiling

1.34 SY Flooring

12.06 SF Ceiling

12.06 SF Floor

Missing Wall 3' 5 3/8" X 8' Opens into OFFSET

Missing Wall 3' 6" X 8' Opens into LANDING

Missing Wall 3' 5 3/8" X 8' Opens into UPPER_LANDIN

Missing Wall 3' 6" X 8' Opens into UPPER_LANDIN

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

137. PNT P2 Paint the walls - two coats

W 84.91 SF 0.76 64.53 0/15 yrs Normal 0% (0.00) 64.53

As the walls have bullnose edges with no breaking point the walls will be painted to match.

138. CLN FCC Clean and deodorize carpet

F 106.14 SF 0.39 41.39 0/NA Normal 0% (0.00) 41.39

139. PNT MASKFL Floor protection - self-adhesive plastic film

F 106.14 SF 0.52 55.19 0/15 yrs Normal 0% (0.00) 55.19

Totals: Stairs 161.11 0.00 161.11

Page 20: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

20

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 20

Upper Landing Height: 8'

578.28 SF Walls

858.51 SF Walls & Ceiling

31.14 SY Flooring

83.33 LF Ceil. Perimeter

280.24 SF Ceiling

280.24 SF Floor

73.33 LF Floor Perimeter

Door 2' 6" X 6' 8" Opens into UPSTAIRS_ARE

Door 2' 6" X 6' 8" Opens into UPSTAIRS_ARE

Door 2' 6" X 6' 8" Opens into UPSTAIRS_ARE

Window 2' 10" X 3' 10" Opens into Exterior

Window 2' 10" X 3' 10" Opens into Exterior

Missing Wall 2' 8 5/8" X 8' Opens into LANDING

Missing Wall 3' 5 3/8" X 8' Opens into UPPER_STAIRS

Missing Wall 3' 6" X 8' Opens into UPPER_STAIRS

Missing Wall 15' 2" X 8' Opens into Exterior

Door 2' 6" X 6' 8" Opens into UPSTAIRS_ARE

Subroom: Offset (1) Height: 8'

14.83 SF Walls & Ceiling

1.65 SY Flooring

5.54 LF Ceil. Perimeter

14.83 SF Ceiling

14.83 SF Floor

Missing Wall 1' 6" X 8' Opens into LANDING

Missing Wall 5' 3/8" X 8' Opens into Exterior

Missing Wall 5' 2" X 8' Opens into UPPER_LANDIN

Missing Wall 3' 5 3/8" X 8' Opens into UPPER_STAIRS

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

140. PNT P2 Paint the walls - two coats

W 578.28 SF 0.76 439.49 0/15 yrs Normal 0% (0.00) 439.49

As the walls have bullnose edges with no breaking point the walls will be painted to match.

141. CLN FCC Clean and deodorize carpet

F 295.06 SF 0.39 115.07 0/NA Normal 0% (0.00) 115.07

142. CAB CUB R&R Custom cabinets - base units

3,7+3,5 7.00 LF 220.90 1,546.30 0/50 yrs Normal 0% (0.00) 1,546.30

Page 21: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

21

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 21

CONTINUED - Upper Landing

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

The cabinets match the kitchen cabinets and can all be seen in clear sight from the stairs and landing. These items will be replaced due to reasonableuniformity and appearance.

143. CAB CUW36 R&R Custom cabinets - wall units - 36" tall

3,7+3,5 7.00 LF 165.04 1,155.28 0/50 yrs Normal 0% (0.00) 1,155.28

The cabinets match the kitchen cabinets and can all be seen in clear sight from the stairs and landing. These items will be replaced due to reasonableuniformity and appearance.

144. PNT MASKFL Floor protection - self-adhesive plastic film

F 295.06 SF 0.52 153.43 0/15 yrs Normal 0% (0.00) 153.43

Totals: Upper Landing 3,409.57 0.00 3,409.57

Upstairs Area Height: 8'

1,272.82 SF Walls

2,200.29 SF Walls & Ceiling

103.05 SY Flooring

183.83 LF Ceil. Perimeter

927.47 SF Ceiling

927.47 SF Floor

173.83 LF Floor Perimeter

Window 2' 10" X 3' 10" Opens into Exterior

Window 2' X 3' Opens into Exterior

Window 5' 10" X 4' 10" Opens into Exterior

Window 2' 10" X 3' 10" Opens into Exterior

Window 2' X 2' Opens into Exterior

Window 2' X 2' Opens into Exterior

Door 2' 6" X 6' 8" Opens into UPPER_LANDIN

Door 2' 6" X 6' 8" Opens into UPPER_LANDIN

Door 2' 6" X 6' 8" Opens into UPPER_LANDIN

Door 2' 6" X 6' 8" Opens into UPPER_LANDIN

Window 5' 10" X 4' 10" Opens into Exterior

Window 5' 10" X 4' 10" Opens into Exterior

Window 2' 10" X 3' 10" Opens into Exterior

CAT SEL ACT DESCRIPTION

CALC QNTY UNIT RCV AGE/LIFE USAGE DEP % DEPREC. ACV

For the purpose of the sketch

Page 22: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

22

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 22

CONTINUED - Upstairs Area

ACT DESCRIPTIONCAT SEL

DEP %CALC DEPREC. ACVUSAGEQNTY RCV AGE/LIFEUNIT

Totals: Upstairs Area 0.00 0.00 0.00

Total: 2nd Floor 0.00 3,570.68

Line Item Totals: 11350_FERRARA 80,895.93 0.00 80,895.93

Grand Total Areas:6,195.08 SF Walls 2,983.25 SF Ceiling 9,178.33 SF Walls and Ceiling

3,019.92 SF Floor 335.55 SY Flooring 702.90 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 799.03 LF Ceil. Perimeter

3,019.92 Floor Area 2,969.39 Total Area 6,195.08 Interior Wall Area

3,146.99 Exterior Wall Area 384.31 Exterior Perimeter of Walls

0.00 Surface Area 0.00 Number of Squares Total Perimeter Length0.000.00 Total Ridge Length 0.00 Total Hip Length

[%] - Indicates that depreciate by percent was used for this item

[M] - Indicates that the depreciation percentage was limited by the maximum allowable depreciation for this item

Page 23: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

23

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 23

Summary for DwellingLine Item Total 80,895.93

Material Sales Tax @ 8.750% 2,547.05

Subtotal 83,442.98Overhead @ 10.0% 8,344.39Profit @ 10.0% 8,344.39

Replacement Cost Value $100,131.76Net Claim $100,131.76

David Tyler

Page 24: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

24

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 24

Recap by Room

Estimate: 11350_FERRARAGeneral Items 16,018.94 19.80%Exterior 15,297.05 18.91%

Area: 1st FloorKitchen 27,970.77 34.58%Family Room 5,421.92 6.70%Dining Room 2,485.81 3.07%Living Room 6,063.64 7.50%Hallway 1 507.80 0.63%Bedroom 2,706.78 3.35%Hallway 2 852.54 1.05%

Area Subtotal: 1st Floor 56.87%46,009.26

Area: 2nd FloorStairs 161.11 0.20%Upper Landing 3,409.57 4.21%

Area Subtotal: 2nd Floor 4.41%3,570.68

Subtotal of Areas 100.00%80,895.93

Total 80,895.93 100.00%

Page 25: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

25

BLUE OAKS PUBLIC ADJUSTING

11350_FERRARA 2/27/2017 Page: 25

Recap by Category

O&P Items Total %

APPLIANCES 1,084.77 1.08%CABINETRY 24,034.47 24.00%CLEANING 5,228.97 5.22%GENERAL DEMOLITION 4,525.52 4.52%DOORS 178.96 0.18%DRYWALL 699.78 0.70%FLOOR COVERING - WOOD 10,083.82 10.07%FINISH CARPENTRY / TRIMWORK 2,067.44 2.06%FINISH HARDWARE 155.94 0.16%FRAMING & ROUGH CARPENTRY 1,191.90 1.19%HEAT, VENT & AIR CONDITIONING 217.91 0.22%INSULATION 47.04 0.05%LABOR ONLY 11,057.40 11.04%LIGHT FIXTURES 666.91 0.67%PLUMBING 1,115.63 1.11%PAINTING 4,964.38 4.96%SCAFFOLDING 3,933.74 3.93%STUCCO & EXTERIOR PLASTER 8,002.12 7.99%TEMPORARY REPAIRS 1,323.78 1.32%WINDOW TREATMENT 315.45 0.32%

O&P Items Subtotal 80,895.93 80.79%Material Sales Tax @ 8.750% 2,547.05 2.54%Overhead @ 10.0% 8,344.39 8.33%Profit @ 10.0% 8,344.39 8.33%

Total 100,131.76 100.00%

Page 26: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

26

11350_FERRARA 2/27/2017 Page: 26

1st Floor

Page 27: 1 BLUE OAKS PUBLIC ADJUSTING - Pacific Specialty › clmforms3... · The Following Estimate is based upon the Physical Site Inspection by David Tyler of Blue Oaks Public Adjusting

27

11350_FERRARA 2/27/2017 Page: 27

2nd Floor