![Page 1: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/1.jpg)
1
Bilateral Interconnection Agreement Model
Presented to HAPUA Working Group 5 (ESI Services), Project 6
ByPower Purchase Agreement Division
Electricity Generating Authority of Thailand (EGAT)
February 25, 2009 Jakarta, Indonesia
![Page 2: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/2.jpg)
2
Contents
1. Introduction
2. Assumptions of the Model
3. Bilateral Interconnection
Agreement (BIA) Model
4. Summary
![Page 3: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/3.jpg)
3
1. Introduction• Interconnected power system means
system connection of two (or more) utilities (or group of utilities) that control
their own generators and/or transmissions to regulate their own system frequency.
• Goals of interconnection are:(i) continuity of the service and;
(ii) economy of power production.
• We are looking forward to Asian Power Grid.
![Page 4: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/4.jpg)
4
2. Assumptions of the Model
• There are three assumptions used in creating the BIA model.
- Both Control Areas agreed to connect their own power system together.
- Load control center was established in each Control Area.
- Tie transmission line(s) was constructed and commissioning phase was already completed.
-
![Page 5: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/5.jpg)
5
2. Assumptions of the Model
Technical Assumptions
This is minimum Requirements for interconnected Power Systems.
It does not depend on your Electric Supply Industries (ESI) scheme.
![Page 6: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/6.jpg)
6
3. BIA ModelDefinitions and Interpretation
Term
Coordinating Committee
Interconnections
Interconnected Utility Responsibility
Miscellaneous Provisions
Sale and Purchase of Electrical Energy Billing and Payments
Tax and Tariff
Metering
Default and Termination
BIAConditions Precedent
![Page 7: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/7.jpg)
7
Definitions and Interpretation
• This clause defines meaning of necessary words used in the Bilateral Interconnection
Agreement (BIA) which shall remain in effect during the Term of the Agreement
but may be amended from time to time as agreed in writing by the Parties.
![Page 8: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/8.jpg)
8
Term• This Clause specifies the day when the Agreement
shall be effective and expired. It also provides means to extend the term of Agreement or to terminate the Agreement prior to the specified
expiration date. Provisions of survival of rights on termination should also be presented.
• Items to be incorporated :-- Term of Agreement
- Commencement Date
- Extension of the Term
- Expiration of the Term
- Survival of Rights on Termination
![Page 9: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/9.jpg)
9
Conditions Precedent
• This Clause specifies conditions to be fulfilled by the Parties before the Agreement
shall take effect. Generally, they are the approval and ratification of the Agreement by the Approval Authorities of both Parties and also the readiness of the system for
commercial operation.
![Page 10: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/10.jpg)
10
Coordinating Committee
• This Clause specifies the establishment of the Coordinating Committee, together with its obligation and responsibility concerning technical issues. Procedures for the appeal
in case any matters cannot be resolved within its jurisdiction is also required.
![Page 11: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/11.jpg)
11
Interconnections
• This Clause explains the transmission line(s) that connect two electrical systems.
Description of the Interconnection Facilities, diagram of the transmission line
and specifications of the conductors, towers, insulators, and others necessary information related to the transmission
facilities should be provided in this Clause and the Attachment.
![Page 12: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/12.jpg)
12
Interconnected Utility Responsibility• This clause describes responsibility of the
Transmission System Operators (TSOs) of both Parties in order to maintain
instantaneous and continuous operation of the interconnected power system.
• Items to be incorporated are :-
- General Obligation of the TSOs
- Control Area Responsibility
- Reserve Capacity
- Responsibility for Operating Reserve
- System Protection Coordination and Load Shedding
- Reactive Power and Voltage Responsibility
![Page 13: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/13.jpg)
13
Sale and Purchase of Electrical Energy
• This clause describes the principle of “as and when available” basis for the energy sale and purchase under the specified transfer limitation. The arrangement and issuance of Price Quotation, Day Ahead Schedules including how to manage and pay the “Commercial Energy” that transacted following the Day Ahead Schedules in various cases will be explained in details.
![Page 14: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/14.jpg)
14
Metering
• This clause specifies metering system and obligation of each party in maintain metering system. Locations of revenue metering system which measure electrical energy are also specified herein. Process and resolution of meter inaccuracy are presented which will lead to adjustment and correction of invoices and payments.
![Page 15: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/15.jpg)
15
Billing and Payments
• This clause provides billing and payment process and its duration. Currency, means of payment and interest rate for late payment are also specified. In case there is a dispute on the billing, process of handling the disputed amount and referring such dispute for dispute resolution will be provided.
![Page 16: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/16.jpg)
16
Tax and Tariff • This Clause stipulates the responsibility of each
party in any taxes that may occur due to the electricity transaction. Usually, in bilateral
Agreement, each party shall bare the cost of taxes occurs in its own territory.
• Tax and other tariff to be imposed are as follows:
- Value Added Tax (VAT)
- Import and Export Tax
- Tariffs
![Page 17: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/17.jpg)
17
Default and Termination
• This Clause specifies events which shall be considered an Event of Default e.g. default
in the payment of any amount due and payable, process to cure such event of default and eventually to terminate the
Agreement.
![Page 18: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/18.jpg)
18
Miscellaneous Provisions • Items to be incorporated are :
- Force Majeure
- Liability for Damages
- Assignment of Rights and Obligation
- Dispute Resolution
- Modification Due to Change in Circumstances
- Confidential Information
- Severability
- Notices
- Modification of the Agreement
![Page 19: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/19.jpg)
19
Attachments
- The Attachment provides necessary information of the tie transmission line and one line diagram including important parameters.
- Form of the Day Ahead Schedule.
- Energy Price or Tariff
![Page 20: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/20.jpg)
20
4. Summary• The BIA model provides necessary provisions for bilateral interconnected
power system which concern technical, commercial and legal obligations, tax
and other tariffs.
• This BIA model is expected to be a benchmark Bilateral Interconnection Agreement for “Subsystem A” and
other Subsystems.
![Page 21: 1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.](https://reader036.fdocuments.in/reader036/viewer/2022062408/56649ec75503460f94bd36dd/html5/thumbnails/21.jpg)
21
Thank you very much for
your kind attention.