PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 12 OCT 11 OPT Brief.
1 BEST, U-LAN, and C-LAN Program Brief OVERVIEW UNCLASSIFIED.
-
Upload
polly-thornton -
Category
Documents
-
view
212 -
download
0
Transcript of 1 BEST, U-LAN, and C-LAN Program Brief OVERVIEW UNCLASSIFIED.
1
BEST, U-LAN, and C-LANProgram Brief
OVERVIEW
UNCLASSIFIED
2
BEST/INMARSATBandwidth Efficient Satellite System
• Functional Connectivity Requirement– BEST functionality to be relocated to the
New Comm Shelter.– Provide Primary SIPRNET Connectivity. – Provide Backup NIPRNET Connectivity.– SMIS (MSC) U-LAN and C-LAN.
Connectivity to be relocated to New Comm Shelter.
– BEST Bandwidth will be used for Exercise.
3
BESTBandwidth Efficient Satellite System
• SIM– Relocate BEST/LAN rack from
Communications/Radio Room to Comm Shelter.
• ISS– Power up BEST rack.
– SOVT BEST rack to include NIPRNET and SIPRNET connectivity.
– Provide Training for BEST Operation.
4
U-LAN• ISS
– Relocate Marine COT SMIS NIPRNET workstation to Shelter.
– Relocate Marine Communications/Radio Room SMIS NIPRNET workstation to Shelter.
– Configure SMIS NIPRNET Network
– Test all SMIS NIPRNET workstations using the new connections on NIPRNET in the Shelter.
– Install KVM switches on the two (2) SMIS NIPRNET workstations in the Marine Admin. Space for NTCSS Compatibility/Backup.
5
C-LAN• SIM
– Install SMIS C-LAN Fiber Backbone.– Install Eight (8) C-LAN Wyse terminals (4 in hold 6, 1 in
Marine Admin, 1 in Marine COT, 2 in Comm Shelter).– Install dedicated C-LAN printer for C-LAN server in
Shelter.
• ISS– Relocate the SMIS C-LAN workstation from the Marine
Communications/Radio Room to the Shelter.– Configure SMIS C-LAN server.– Configure SMIS C-LAN Wyse terminals.– SOVT C-LAN.– Configure C-LAN client accounts.– Train C-LAN administrator and users.
6
7
POA&M
• BEST and NIPRNET SOVT – Two (2) days once Bandwidth is established.
• C-LAN and SIPRNET Configuration/ SOVT – Five (5) days from end of C-LAN HM&E.
• Possible delays – Availability of BEST Bandwidth and SIM
HM&E.
8
Issues
– Determine SMIS SIPRNET workstation requirement for in the Marine Communications/Radio Room to the Shelter.
– Validate SMIS U-LAN Workstation Requirements.– Validate SMIS C-LAN Workstation Requirements.
• Need to Coordinate the Thin-client Workstation Installation for Designated Containers.
– Validate SMIS SIPRNET Email Account Requirements.– Provide Personnel List for Training for BEST/U-LAN/
C-LAN and Availability for Training.– Need to Address all IA Issues.
– Bandwidth Limitation is an Issue. Limited to what is available at time of Exercise.
9
Points of Contact
– MSC• Gary Davis, PM3 Program Office, 202-685-5077
• Ken Toy, N62 C4I Systems, 202-685-5317
• Dave Chapman, ISS Project Mgr, 202-685-5055
• Ron Boustedt, ISS LAN, 757-321-9120
– SPAWAR• Dennis Scherf, MSC Rep, 757-558-5321
• Ron Puett, WSC-6 Engineer, 757-558-6857
• Dwayne Hardman, SIM, 757-410-0746
10
QUESTIONS?