1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368...

19
1 envenuti nei LNF

Transcript of 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368...

Page 1: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

1Benvenuti nei LNF

Page 2: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.
Page 3: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

Frascati National Labs (LNF)

Lab footprint

135000 m2

Total Staff

368

Researchers

98

Technologist/

Engineers62

Technicians

167

Administration/ Services

41

External Users 323

Italian 252

Foreigners71

Visitors3200

Stages170

Page 4: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

1) Attività di ricerca sperimentale e teorica

2) Elementary particle physics

3) Nuclear Physics

4) Atomic physics

5) Accelerator Physics

6) Synchrotron light IR, UV, X

7) FEL

8) Cryogenic antennas

9) High Intensity Lasers

10) Medical applications

11) Electron and photon beams

INFN-LNF

Page 5: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

Gli Acceleratori dei LNF

L= 1.4 1032 cm-2 s-1

Page 6: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

l’antimateria!!

si usa per la ricerca scientifica

DAFNEe+

e-

Page 7: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

Esperimento KLOE

Page 8: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

FINUDA

Studio dei nuclei con mesoni K

Page 9: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

Studio degli Atomi con mesoni K

Page 10: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

Under INFN responsibility

SPARC 3D CAD model

Under ENEAresponsibility

Collaborations

Sorgente Pulsata e Amplificata di Radiazione Coerente

Page 11: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

Free Electron LaserFree Electron LaserSelf-Amplified-Spontaneous-EmissionSelf-Amplified-Spontaneous-Emission(No Mirrors - Tunability - Harmonics)(No Mirrors - Tunability - Harmonics)

Page 12: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

CNAO

Compact delivery lines

GSI RFQ+linac

Scanning and monitoring stations

Centro Nazionale di Adroterapia Oncologica

Page 13: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

fast slow

horizontalscanning

verticalscanning

Energy variationfrom the

synchrotron

Totalthickness

Patient

Scanning system

Target volume

Field 22E22

Field 4E4

[www.psi.ch]

Page 14: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

La collaborazione LNF al progetto CTF3 realizza il

Delay Loop e la linea di trasferimento con il sistema stretcher/compressor

Nuove Tecniche di Accelerazioneal

CERN

Page 15: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

C L I CC L I C

151/24/01R. Corsini - CTF3 Meeting

CTF3 conceptual lay-outCTF3 conceptual lay-out

X 5 Combiner Ring

84 m

X 2Delay42 m

Drive Beam Injector

Main Beam Injector

30 GHz - 150 MV/m - 140 ns

Drive/Main Beam Modules

10 Modulators/Klystrons with LIPS (x 2.3) 3 GHz - 30 MW - 6.7 s

Drive Beam Accelerator 20 Accelerating Structures 3 GHz -7.0 MV/m - 1.3 m

~ 15 m 3.5 A - 2100 b of 2.33 nC 184 MeV - 1.4 s

35 A - 184 MeV140 ns

High PowerTest Stand

CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10

CTF3 (CLIC Test Facility 3)

Page 16: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

X-ray Absorption Near Edge Spectroscopyof low Z elements (Mg, Al, P, S, Cl, K, Ca) and transition metals (up to Cd)

The Soft X-ray beamline at DANE:Fixed exit monochromator with double Si(111) or Quartz(1010) crystalsIon Chamber detectors for appling XAS in transmission on thin samplesEnergy range from 1 up to 4 keV

2.466 2.468 2.470 2.472 2.474 2.476 2.478 2.480 2.482 2.484 2.486

0.0

0.5

1.0

1.5

2.0

2.5

3.0

GSH (reduced)one sulfur atom

GSSG (oxidized)one disulfur bond

Ab

s [

a.u

.]

E [keV]

Sulfur redox state in proteins

X-ray spectroscopy of

S in Glutathione (mM)

2.13 2.14 2.15 2.16 2.17 2.18

0.0

0.2

0.4

0.6

0.8

1.0

P4 red E=1/4 eV

280pts & 1sec/pt

A [

a.u

.]E [keV]

Phosphorus K edge

Gianfelice Cinque

Page 17: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

ATTIVITA’ in LABORATORI ESTERI

ATLAS@CERN LHCb @ CERN

DIRAC @ CERN LVD @ LNGS

BABAR @ SLAC OPERA @ CNGS

CDF @ FNAL BTeV @ FNAL

HERMES @ DESY VIRGO @ Cascina

AIACE @ TJNAF WIZARD @ Satellites

Page 18: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

What about the future ?

DAFNE upgrade in luminosity AND energy

Page 19: 1 Benvenuti nei LNF. Frascati National Labs (LNF) Lab footprint 135000 m 2 Total Staff 368 Researchers 98 Technologist/ Engineers 62 Technicians 167.

I LNF sono un centro culturale :

Conferenze, seminari , riunioni dei gruppi sperimentali

Centro di calcolo a disposizione di tutto l’INFN

Visite guidate per Scuole, Associazioni ecc

Convegni per Insegnanti di Fisica e Matematica

Organizzazione di Corsi post-Universitari (master)

Biblioteca Aperta