YOUR REF: OUR REF: DA-2015-28
1 April 2015 Ignite Homes Pty Ltd C/- Tim Davies 70 Kitchener Rd ASCOT QLD 4007 Dear Sir/Madam DECISION NOTICE Applicant: Ignite Homes Pty Ltd Proposal: Material Change of Use - Dual Occupancy Application Number: DA-2015-28 Address: 51 Phoenix Crescent, RURAL VIEW QLD 4740 Property Description: Lot 225 on SP264915 Please find enclosed the above Decision Notice with the relevant attachments: Decision Notice Assessment Manager’s Conditions Referral Agencies Conditions Approved Plans Appeal Rights Notice to Commence Use Infrastructure charges are applicable on this approval. A separate Infrastructure Charge Notice accompanies this Decision Notice. If you require any further information, please contact Josephine McCann.
This is a Mackay Regional Council digitally signed document.
Decision Notice
Sustainable Planning Act
Application Number: DA-2015-28
Date of Decision: 31 March 2015
1. APPLICANT/S DETAILS
Name: Ignite Homes Pty Ltd
Postal Address:
C/- Tim Davies
70 Kitchener Rd
ASCOT QLD 4007
2. PROPERTY DETAILS
Property Address: 51 Phoenix Crescent, RURAL VIEW QLD 4740
Property Description: Lot 225 of SP264915
3. PROPOSAL
Material Change of Use - Dual Occupancy 4. DECISION TYPE
DEVELOPMENT DECISION
Material Change of Use Development Permit
Approved in Full Subject to Conditions
This is a Mackay Regional Council digitally signed document.
Decision Notice
Sustainable Planning Act
5. ASSESSMENT MANAGER’S CONDITIONS
The conditions relevant to this decision are attached to this notice. These conditions areclearly identified to indicate whether the assessment manager or a concurrence agencyimposed them.
6. IDAS REFERRAL AGENCIES
Concurrence
Agencies
Dept of State Devel, Infrastructure and Planning
Mackay Isaac Whitsunday Regional Office PO Box 710 MACKAY QLD 4740
7. SUBMISSIONS
There were no properly made submissions received on this application.
8. PLANNING SCHEME
This decision is issued under the Mackay City Planning Scheme including amendments up to24 February 2014.
9. SUPERSEDED PLANNING SCHEME
Not Applicable
10. FURTHER APPROVALS REQUIRED
Minor Works Permit
Invert Crossing and Concrete Driveway
Stormwater Connection
Building Works – Development Permit Plumbing and Drainage Works – Compliance Permit
11. PRELIMINARY APPROVAL OVERRIDING THE PLANNING SCHEME
Not Applicable
12. RELEVANT PERIOD
The standard relevant period states in Section 341 of the Sustainable Planning Act 2009apply to each aspect of development in this approval, if not stated in the conditions ofapproval attached.
This is a Mackay Regional Council digitally signed document.
Decision Notice
Sustainable Planning Act
13. APPEALS
Attached is an extract from the Sustainable Planning Act 2009 which details your appealrights and the appeal rights of any submitters regarding this decision.
14. ASSESSMENT MANAGER SIGNATURE
Name Shane Kleve
Position Acting Manager Development Assessment
Signature Date
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2015-28 Decision Date: 31 March 2015
Page 1 of 5
1. Plan of Development
The approved Material Change of Use – Dual Occupancy development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval.
Title Job No.
Sheet No.
Prepared by Date
Site Plan 5886 4 Stuart Osman Building Designs 26/02/2015 Ground Floor 5886 5 Stuart Osman Building Designs 26/02/2015 Roof Plan 5886 6 Stuart Osman Building Designs 26/02/2015 Elevations 1 & 2 5886 7 Stuart Osman Building Designs 26/02/2015 Elevations 3 & 4 5886 8 Stuart Osman Building Designs 26/02/2015 Landscape Plan 5886 15 Stuart Osman Building Designs 26/02/2015
2. Amended Plans Required
Prior to the issue of a Development Permit for Building Works, amended plans must be submitted for approval. The plans must be amended to comply with the following matters: Provision of 6m3 of storage space for each unit. The storage space may be
provided within the housing envelope or as a rear storage shed. Provision of landscaping across the entire frontage of both units to a minimum
depth of 2m. The amended plans must include a plant species list.
The amended plans must be submitted to Council for approval.
3. Compliance with Conditions All conditions must be complied with prior to the occupancy of the building for the approved use, unless specified in an individual condition.
4. Maintenance of Development The approved development (including landscaping, car parking, driveways and other external spaces) must be maintained in accordance with the approved drawing(s) and/or documents, and any relevant Council engineering or other approval required by the conditions.
5. Conflict between plans and written conditions Where a discrepancy or conflict exists between the written condition(s) of the approval and the approved plans, the requirements of the written condition(s) will prevail.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2015-28 Decision Date: 31 March 2015
Page 2 of 5
6. Notice of Intention to Commence the Use
Prior to the commencement of the use on the site, written notice must be given to Council that the use (development and works) fully complies with the decision notice issued in respect of the use (please see attached notice for your completion).
7. Damage The developer is responsible for the repair of any damage that is caused to Council’s infrastructure as a result of the construction works associated with the proposed development. The developer must make any damage safe and then notify Council immediately. Council will make the decision as to who will carry out the rectification works and the timing for the completion of those works.
8. Compliance with Council Standards All design and construction for the development must be in accordance with Council’s Policies, Engineering Design Guidelines, Standard Drawings and Standard Construction Specifications.
9. Minimum Building Floor Level
The minimum habitable floor level of the proposed development must be the higher of: 300mm above the top of kerb 300mm above the crown of the road 225mm above ground level a level which allows the connection of all sanitary fixtures to the designated
sewer connection point by means of sanitary drainage which complies with AS3500
10. Driveway
The proposed internal shared driveway must be widened to minimum area within the lot measuring 5m wide by 6m long to accommodate visitor parking for two vehicles within the lot and taper to match smoothly with the existing invert crossing (refer attached SKETCH No.1).
11. Stormwater Drainage
Stormwater from the site (including roofwater) shall be collected within the property boundaries and discharged via an underground system to Council’s stormwater system. The stormwater discharge points are the existing kerb adaptors in the Phoenix Crescent kerb and channel.
12. Ponding and Diversion of Stormwater
Ponding of stormwater resulting from the development must not occur on adjacent
sites and stormwater formerly flowing onto the site must not be diverted onto other sites. The site shall be graded so that it is free draining.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2015-28 Decision Date: 31 March 2015
Page 3 of 5
13. Connection to Sewer Services a. The sanitary drainage system for unit 1 must discharge to the existing
discharge point shown on the attached SKETCH No. 1. b. The sanitary drainage system for unit 2 must discharge to a new house
connection branch to be provided at the location shown on attached SKETCH No. 1
14. Connection to Water Services
a. Unit 1 must connect to the existing water service located at the south east front corner of the lot.
b. A new 32mm diameter water service must be provided to service Unit 2. 15. Water Metering
Separate water meters must be provided for each dwelling. 16. Live Connections
Council’s Water and Waste Services Department is to carry out all water connection
and live sewer work at the developer’s expense.
17. Electricity and Telecommunications Services Each dwelling of the approved development must be provided with separate and independent electricity and telecommunications infrastructure.
18. Waste Storage Area The waste storage area for each dwelling must comply with the following: Contain an impervious surface; and Contain sufficient storage space for the storage of one (1) 240 litre refuse and
one (1) 240 litre recycling bin; and Be screened so as not to be visible from Phoenix Crescent.
19. Visual Screen Fence Visual screen fencing must be constructed in accordance with the Site and Landscaping Plan. The screen fence must be a minimum height of 1.8 metres. Furthermore, the fence must be tapered to a height of 1.2metres within 6 metres of the front alignment. The total cost of this fencing to be met by the Developer.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2015-28 Decision Date: 31 March 2015
Page 4 of 5
ASSESSMENT MANAGER’S ADVICE 1. Local Laws
The approved development must also comply with Council’s current Local Laws under the Local Government Act 2009.
2. Hours of Work It is the applicant/owner’s responsibility to ensure compliance with Section 440R of the Environmental Protection Act 1994, which prohibits any construction, building and earthworks activities likely to cause audible noise (including the entry and departure of heavy vehicles) between the hours of 6:30pm and 6:30am from Monday to Saturday and at all times on Sundays or Public Holidays.
3. Dust Control It is the applicant/owner’s responsibility to ensure compliance with Section 319 General Environmental Duty of the Environmental Protection Act 1994, which prohibits unlawful environmental nuisance caused by dust, ash, fumes, light, odour or smoke beyond the boundaries of the property during all stages of the development including earthworks and construction.
4. Sedimentation Control It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3C of the Environmental Protection Act 1994 to prevent soil erosion and contamination of the stormwater drainage system and waterways.
5. Noise during Construction and Noise in General It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3B of the Environmental Protection Act 1994.
6. General Safety of Public during Construction It is the principal contractor’s responsibility to ensure compliance with Section 19 (2) of the Work Health and Safety Act 2011. Section 19 (2) states that a person conducting a business or undertaking must ensure that the health and safety of other persons is not put at risk from work carried out as part of the conduct of the business or undertaking. It is the responsibility of the person in control of the workplace to ensure compliance with Section 20 (2) of the Work Health and Safety Act 2011. Sections 20 (2) states that the person in control of the workplace is obliged to ensure that the means of entering and exiting the workplace and anything arising from the workplace are without risks to the health and safety of any person.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2015-28 Decision Date: 31 March 2015
Page 5 of 5
7. Contaminated Land It is strictly the applicant/owner’s responsibility to source information regarding contaminated land from the Department of Environment and Heritage Protection, Contaminated Land Section as Council has not conducted detailed studies and does not hold detailed information pertaining to contaminated land.
8. Infrastructure Charges Notice Pursuant to the Sustainable Planning Act 2009 and the State Planning Regulatory Provision (adopted charges) an Infrastructure Charges Notice relates to this Development Permit, and accompanies this notice.
9. Future Subdivision of the Development If it is intended to create separate Standard Format lots (with no common property) for each of the approved dwellings, separate independent connections for all infrastructure (e.g. power and telecommunications) will be required to service each lot and premises.
This is a Mackay Regional Council digitally signed document.
Mackay Isaac Whitsunday Regional OfficeLevel 4, 44 Nelson Street
PO Box710Mackay QLD 4740
Our reference: SDA-0315-018835Your reference: DA-2015-28
10 March 2015
Chief Executive OfficerMackay Regional CouncilPO Box 41Mackay QLD 4740
Attention: Josephine McCann
Dear Ms McCann
Concurrence agency response—with conditions given under section 285 of the Sustainable Planning Act 2009 for Material Change of Use (Dual Occupancy) over Lot 225 on SP264915 at 51 Phoenix Crescent, Rural View QLD 4740
The referral agency material for the development application described below was received by the Department of State Development, Infrastructure and Planning under section 272 of the Sustainable Planning Act 2009 on 6 March 2015
Applicant details
Applicant name: Ignite Homes Pty Ltd
Applicant contact details: c/- Tim Davies
70 Kitchener Road
Ascot QLD 4007
Site details
Street address: 51 Phoenix Crescent, Rural View QLD 4740
Real property description: Lot 225 on SP264915
Application detailsProposed development: Material Change of Use for Dual Occupancy
This is a Mackay Regional Council digitally signed document.
SDA-0315-018835
Department of State Development, Infrastructure and Planning Page 2
Referral triggers
The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 3, Item 1 – State controlled roads (Fast Track Assessment)
ConditionsUnder section 287(1)(a) of the Sustainable Planning Act 2009, the department requires that the conditions set out in Attachment 1 attach to any development approval.
Reasons for decision to impose conditionsUnder section 289(1) of the Sustainable Planning Act 2009, the department is required to set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Approved plans and specificationsThe department requires that the following plans and specifications set out below and in Attachment 3 attach to any development approval.
Drawing or document Reference no. Version DateSite Plan – Ground Floor 5886, Sheet 4 of 19 A 26/02/2015
A copy of this response has been sent to the applicant for their information.
If you require any further information, please contact Felicity Laub, Senior Planning Officer, Mackay Isaac Whitsunday Regional Office on (07) 4898 6814 or via email [email protected] who will be pleased to assist.
Yours sincerely
Patrick RuettjesManager (Planning) – Mackay Isaac Whitsunday Regional Office
cc: Ignite Homes Pty Ltd, [email protected]
enc: Attachment 1—Conditions to be imposedAttachment 2—Reasons for decision to impose conditionsAttachment 3—Approved Plans and Specifications
This is a Mackay Regional Council digitally signed document.
SDA-0315-018835
Department of State Development, Infrastructure and Planning Page 3
Our reference: SDA-0315-018835Your reference: DA-2015-28
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
State controlled roads
Sustainable Planning Regulation 2009, Schedule 7, Table 3, Item 1—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Sustainable Planning Act 2009 nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s):
1. The development must be carried out generally in accordance with the following plans:
'Site Plan – Ground Floor’ prepared by Ignite Homes PtyLtd, dated 26 February 2015, and given the reference 5886, revision A (page 4 of 19).
At all times.
T13
This is a Mackay Regional Council digitally signed document.
SDA-0315-018835
Department of State Development, Infrastructure and Planning Page 4
Our reference: SDA-0315-018835Your reference: DA-2015-28
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are: To ensure the development is carried out generally in accordance with the plans of development
submitted with the application.
T13
This is a Mackay Regional Council digitally signed document.
SDA-0315-018835
Department of State Development, Infrastructure and Planning Page 5
Our reference: SDA-0315-018835Your reference: DA-2015-28
Attachment 3—Approved plans and specifications
T13
This is a Mackay Regional Council digitally signed document.
Phone (07) 55 203 022Fax (07) 55 203 033
PO Box 2845 Burleigh Heads DC Qld 4220Address: 2/71 Township Drive, West Burleigh, QLD 4219
ABN 73 097 995 616BSA License No: 1129687Email: [email protected]
© Copyright reserved in part or whole. Writtendimensions take preference.Contractor to verify dimensions.Notify designers of discrepancies.
Failure to do so shall voidthe designers responsibilities.
TH
IS D
ES
IGN
IS
TH
E E
XC
LU
SIV
E P
RO
PE
RT
Y O
F S
TU
AR
T O
SM
AN
BU
ILD
ING
DE
SIG
NS
N.B
ALL
WR
ITT
EN
DIM
EN
SIO
NS
TA
KE
PR
EC
ED
EN
CE
OV
ER
SC
ALE
D S
IZE
S
BE
WA
RN
ED
: S
UB
ST
ITU
TIO
N O
F A
NY
ST
RU
CT
UR
AL M
EM
BE
RS
, A
ND
OR
AN
Y V
AR
IAT
ION
TO
AN
Y P
AR
T O
F T
HE
DE
SIG
N W
ILL V
OID
AN
Y
RE
SP
ON
SIB
ILIT
IES
OF
ST
UA
RT
OS
MA
N B
UIL
DIN
G D
ES
IGN
S F
OR
TH
E S
TR
UC
TU
RA
L IN
TE
GR
ITY
AN
D P
ER
FO
RM
AN
CE
OF
TH
E B
UIL
DIN
G
PROJECT
JOB NUMBER
BUILDER
DRAWN BY CHECKED BY
DESIGN
DATE
SCALES AMENDMENTS
SHEET NUMBERof
CHARTERED
MEMBER OF
PROPOSED DUPLEX
LOT 225
PHOENIX CRESCENTRURAL VIEW
5886
CV
A 26/02/15
*******
SO
THE NEW GEORGIA -
MKIII HERITAGE
1:100 @ A3
4 19
building designersassociation of
queensland inc.
IGNITE HOMES PTY LTDA.B.N 52128355466QBCC - 1173465PO BOX 1159
TOOMBUL QLD 401207 3630 2924
820
820
820 720
820
720
820
820
820
820
720
720720
820
21-1
5asw
21-2
4 pa
nelif
t doo
r06-18asw
12-0
9asw
21-2
1SD
06-18asw
21-21SD
06-1
8asw
21-2
4 pa
nelif
t doo
r
21-0
6aaw
21-0
6aaw
21-06aaw
21-21SD
15-15asw 15-15asw
06-1
8asw
21-1
8S
D
141° 37' 20" 34.5
231°
37' 20"
16.6
7
51°
37' 20"
16.6
7
141° 37' 20"
3
141° 37' 20"
3
141° 37' 20" 34.5
231°
37' 20"
1.0
9
231°
37' 20"
15.5
8
(37.5)
(37.5)
(16.6
7)
EM
T C
B
To Fascia
To WallTo Wall
To Fascia
To Fascia
To Wall
To Wall
To Fascia
Building Exclusion Zone
To
Fa
scia
To
Wa
ll
To
Fa
scia
To
Wa
ll
PH
OE
NIX
C
RE
SC
EN
T
5150
5640
7190
7680
1500
1540
1500
1540
11670
12160
11670
12160
11250
1400mm x 800mmRubbish bin slab
600mm x 600mm Hotwater system slab
2400mm x 1600mmClothes line slab, clothesline to be bolted to wall
1200mm x600mm A/C slab
1800mm high treatedgood neighbour fencing
2400mm x 1600mmClothes line slab, clothesline to be bolted to wall
600mm x 600mm Hotwater system slab
1400mm x 800mmRubbish bin slab
1200mm x600mm A/C slab
Letter Box
Letter Box
PROPOSED SINGLE STOREY
2x UNIT DEVELOPMENTLot No. 225
SITE AREA - 625Sq.mSITE COVERAGE - 38.34%
PADRL - T.B.C
FFLRL - T.B.C
SewerConnection point
A/C
A/C
A/C
A/C
A/C
A/C
A/CA/C
Lot 225A300Sq.m
GardenBed
GardenBed
Lot 225B325Sq.m
SE
WE
R L
INE
SW
WA
TE
R
D.P
D.P
D.P
D.P
D.P
D.PD.P
D.P
SW
Stormwater Line
Stormwater Line
SITE PLAN - GROUND FLOOR
SCALE 1:200 SHEET 4 OF 19 JOB NUMBER - 5886
** 1:5 MAX DRIVEWAY SLOPE TO LOCAL GOVERNMENTREQUIREMENTS AND STANDARDS **
................................
................................
................................
................................
00.000CUT
00.000
-----F.L
FILL
GL 00.000G.L
approx.
NOTES:* Discharge waste to connection point* Provide sediment control to site where req'd* Discharge stormwater to TANK, where possible,all other stormwater & overflow to kerb & channel* Meter box position T.B.C on site* All retaining walls by owner
**NOTE** ALL STORMWATER & DRAINAGE TO BE IN COMPLIANCE WITH NCC PARTS 3.1.2. & 3.5.2. ASWELL AS ASNZS3500* GUTTERS TO BE 125MM D-SECTION COLORBOND GUTTERS* 2 DOWNPIPES MAX. TO EACH 100mm STORMWATER PIPE, SUBSURFACE PIPES TO BE 100mmDIAMETER, ANY UNDERSLAB PIPING TO HAVE AN INSPECTION OPENING AT UPPER END, THEN TO
BE 100mm SEWER GRADE PIPING WITH NO JOINS UNDER SLAB.
This is a Mackay Regional Council digitally signed document.
Phone (07) 55 203 022Fax (07) 55 203 033
PO Box 2845 Burleigh Heads DC Qld 4220Address: 2/71 Township Drive, West Burleigh, QLD 4219
ABN 73 097 995 616BSA License No: 1129687Email: [email protected]
© Copyright reserved in part or whole. Writtendimensions take preference.Contractor to verify dimensions.Notify designers of discrepancies.
Failure to do so shall voidthe designers responsibilities.
TH
IS D
ES
IGN
IS
TH
E E
XC
LU
SIV
E P
RO
PE
RT
Y O
F S
TU
AR
T O
SM
AN
BU
ILD
ING
DE
SIG
NS
N.B
ALL
WR
ITT
EN
DIM
EN
SIO
NS
TA
KE
PR
EC
ED
EN
CE
OV
ER
SC
ALE
D S
IZE
S
BE
WA
RN
ED
: S
UB
ST
ITU
TIO
N O
F A
NY
ST
RU
CT
UR
AL M
EM
BE
RS
, A
ND
OR
AN
Y V
AR
IAT
ION
TO
AN
Y P
AR
T O
F T
HE
DE
SIG
N W
ILL V
OID
AN
Y
RE
SP
ON
SIB
ILIT
IES
OF
ST
UA
RT
OS
MA
N B
UIL
DIN
G D
ES
IGN
S F
OR
TH
E S
TR
UC
TU
RA
L IN
TE
GR
ITY
AN
D P
ER
FO
RM
AN
CE
OF
TH
E B
UIL
DIN
G
PROJECT
JOB NUMBER
BUILDER
DRAWN BY CHECKED BY
DESIGN
DATE
SCALES AMENDMENTS
SHEET NUMBERof
CHARTERED
MEMBER OF
PROPOSED DUPLEX
LOT 225
PHOENIX CRESCENTRURAL VIEW
5886
CV
A 26/02/15
*******
SO
THE NEW GEORGIA -
MKIII HERITAGE
1:100 @ A3
5 19
building designersassociation of
queensland inc.
IGNITE HOMES PTY LTDA.B.N 52128355466QBCC - 1173465PO BOX 1159
TOOMBUL QLD 401207 3630 2924
820
820
820 720
820
720
820
820
820
820
720
720720
820
21-15asw
21-24 panelift door
06-18asw
12-09asw
21-21SD
06-18asw
21-21SD
06-18asw
21-24 panelift door
21-06aaw
21-06aaw
21-06aaw
21-21SD
15-15asw 15-15asw
06-18asw
21-18SD
W.M.
PROV
W.M.
PROV
REF.
DWPROV
REF.
DWPROV
20150
2040 230 2070 230 5100 230 1230 230 4730 230 3150 230 450
2040 230 6000 70530 70
1100 2000 70 90070
965 70 5355 230 450
2040 230 6600 70 3100 70 2940 70530
70 3750 230 450
3130 90 610
13
59
0
450
23
09
30
70
200
07
06
61
02
30
293
07
0
450
230
300
07
03
11
02
30
40
230
300
02
30
291
09
0
45
023
034
10
70
530
70
21
00
230
40 2
30
19
30
70
10
00
70
30
90
70
68
034
10
70
27
00
23
040
23
019
30
70
58
070
35
10
70
20150
70 6170 70 4000 230 8930 230380
70
70 3600 70530
70 1900 70 4000 230 6000 70 2860 70540
70
90 1950 230 13780 70 3350 230 450
2040 230 6000 70530 70
1100 2000 70 150070
137070
930 70 3350 230
230 6600 70 3100 70 1500 70 2370 70 3350 230 450
13
59
0
70
27
00
70
75
20
23
029
30
70
70
16
70
70
96
070
95
070
30
00
23
040
23
030
00
70
30
90
70
26
10
23
095
070
13
30
70
16
00
27
023
016
00
70
13
30
70
30
90
70
26
10
23
014
20
90
011
00
60
023
040 2
30 60
011
50
90
021
80
23
011
70
28
40
93
090
30
0
B
12
B
12
Bulkhead
90x90 Timber post
90x90Timber post
Bulkhead
Mech. VentilationReqd
Mech. VentilationReqd
ubo
Pantry
RO
BE
RO
BE
RO
BE
LINENL
INE
NL
INE
N
BRM
FW
FW
FWubo
Pantry
BED 2
BED 1
BED 3
GARAGE
GARAGE
LIVING DINING PATIO
BED 1
W.I.R
DININGLIVING
KITCHEN
PORCH ENTRY
PATIO
KITCHEN
300mm B/bar
300mm B/bar
2x/sl/dr
2x/sl/dr
2x/sl/dr
2x/sl/dr
2x/sl/dr
2x/sl/dr
UNIT 1
UNIT 2
A/C
A/C
A/C
A/C
A/C
A/C
A/CA/C
C
12
C
12
D
13
D
13
E
13
E
13
D.P
D.P
D.P
D.P
D.P
D.PD.P
D.P
A
12
A
12
NOTES:* Lift off hinges to WC door, as per N.C.C 3.8.3* Provide GPO & cold water provisions to DW space* ALL External and Internal doors & windows to bemeasured on site and confirmed by builder* Sarking to external walls* Insulation to ceiling (living only) R2.5 batts* All windows & SGD to be tinted* Mechanically vent rooms without natural ventilation* All shower roses to be AAA rated* Maximum water supply pressure not to exceed 500kpaat any outlet* Hot water system shall be heat pump, solar or gas*Water supply outlets to have WELs rating* Toilet cisterns to have dual flush. 6/3 Litre* ALL handrails to be 1000mm above finished floor level* Bedroom windows w. 2m fall height from FL to groundbelow must comply with N.C.C 3.9.2.5. To be fitted withnon-removable screens or restricted to 125mm opening* If more than one smoke alarm is required they must beinterconnected as per N.C.C 3.7.2
FLOOR AREAS
UNIT 1LOWER LIVING AREA:GARAGE:ALFRESCO:PORCH:TOTAL:
UNIT 2LOWER LIVING AREA:GARAGE:ALFRESCO:PORCH:TOTAL:
TOTAL:
PERIMETER
96.30 sq.m21.36 sq.m10.44 sq.m2.69 sq.m
130.79 sq.m
74.07 sq.m21.89 sq.m11.49 sq.m1.44 sq.m
108.89 sq.m
239.68 sq.m25.79 sqs74.140LM
GROUND FLOOR PLAN
SCALE 1:100
ELEVATIONS
4
3
2
1
This is a Mackay Regional Council digitally signed document.
Phone (07) 55 203 022Fax (07) 55 203 033
PO Box 2845 Burleigh Heads DC Qld 4220Address: 2/71 Township Drive, West Burleigh, QLD 4219
ABN 73 097 995 616BSA License No: 1129687Email: [email protected]
© Copyright reserved in part or whole. Writtendimensions take preference.Contractor to verify dimensions.Notify designers of discrepancies.
Failure to do so shall voidthe designers responsibilities.
TH
IS D
ES
IGN
IS
TH
E E
XC
LU
SIV
E P
RO
PE
RT
Y O
F S
TU
AR
T O
SM
AN
BU
ILD
ING
DE
SIG
NS
N.B
ALL
WR
ITT
EN
DIM
EN
SIO
NS
TA
KE
PR
EC
ED
EN
CE
OV
ER
SC
ALE
D S
IZE
S
BE
WA
RN
ED
: S
UB
ST
ITU
TIO
N O
F A
NY
ST
RU
CT
UR
AL M
EM
BE
RS
, A
ND
OR
AN
Y V
AR
IAT
ION
TO
AN
Y P
AR
T O
F T
HE
DE
SIG
N W
ILL V
OID
AN
Y
RE
SP
ON
SIB
ILIT
IES
OF
ST
UA
RT
OS
MA
N B
UIL
DIN
G D
ES
IGN
S F
OR
TH
E S
TR
UC
TU
RA
L IN
TE
GR
ITY
AN
D P
ER
FO
RM
AN
CE
OF
TH
E B
UIL
DIN
G
PROJECT
JOB NUMBER
BUILDER
DRAWN BY CHECKED BY
DESIGN
DATE
SCALES AMENDMENTS
SHEET NUMBERof
CHARTERED
MEMBER OF
PROPOSED DUPLEX
LOT 225
PHOENIX CRESCENTRURAL VIEW
5886
CV
A 26/02/15
*******
SO
THE NEW GEORGIA -
MKIII HERITAGE
1:100 @ A3
6 19
building designersassociation of
queensland inc.
IGNITE HOMES PTY LTDA.B.N 52128355466QBCC - 1173465PO BOX 1159
TOOMBUL QLD 401207 3630 2924
B
12
B
12
22.5 degree Colorbond custom orb roof sheeting withceiling insulation
Colorbond fascias,gutters & downpipes
roof fall
roof fall
roof fall
roof fall
roof fall
roof fall
roof fall
C
12
C
12
D
13
D
13
E
13
E
13
D.P
D.P
D.P
D.P
D.P
D.PD.P
D.P
A
12
A
12
NOTES:* Lift off hinges to WC door, as per N.C.C 3.8.3* Provide GPO & cold water provisions to DW space* ALL External and Internal doors & windows to bemeasured on site and confirmed by builder* Sarking to external walls* Insulation to ceiling (living only) R2.5 batts* All windows & SGD to be tinted* Mechanically vent rooms without natural ventilation* All shower roses to be AAA rated* Maximum water supply pressure not to exceed 500kpaat any outlet* Hot water system shall be heat pump, solar or gas*Water supply outlets to have WELs rating* Toilet cisterns to have dual flush. 6/3 Litre* ALL handrails to be 1000mm above finished floor level* Bedroom windows w. 2m fall height from FL to groundbelow must comply with N.C.C 3.9.2.5. To be fitted withnon-removable screens or restricted to 125mm opening* If more than one smoke alarm is required they must beinterconnected as per N.C.C 3.7.2
ROOF PLAN
SCALE 1:100
ELEVATIONS
4
3
2
1
This is a Mackay Regional Council digitally signed document.
Phone (07) 55 203 022Fax (07) 55 203 033
PO Box 2845 Burleigh Heads DC Qld 4220Address: 2/71 Township Drive, West Burleigh, QLD 4219
ABN 73 097 995 616BSA License No: 1129687Email: [email protected]
© Copyright reserved in part or whole. Writtendimensions take preference.Contractor to verify dimensions.Notify designers of discrepancies.
Failure to do so shall voidthe designers responsibilities.
TH
IS D
ES
IGN
IS
TH
E E
XC
LU
SIV
E P
RO
PE
RT
Y O
F S
TU
AR
T O
SM
AN
BU
ILD
ING
DE
SIG
NS
N.B
ALL
WR
ITT
EN
DIM
EN
SIO
NS
TA
KE
PR
EC
ED
EN
CE
OV
ER
SC
ALE
D S
IZE
S
BE
WA
RN
ED
: S
UB
ST
ITU
TIO
N O
F A
NY
ST
RU
CT
UR
AL M
EM
BE
RS
, A
ND
OR
AN
Y V
AR
IAT
ION
TO
AN
Y P
AR
T O
F T
HE
DE
SIG
N W
ILL V
OID
AN
Y
RE
SP
ON
SIB
ILIT
IES
OF
ST
UA
RT
OS
MA
N B
UIL
DIN
G D
ES
IGN
S F
OR
TH
E S
TR
UC
TU
RA
L IN
TE
GR
ITY
AN
D P
ER
FO
RM
AN
CE
OF
TH
E B
UIL
DIN
G
PROJECT
JOB NUMBER
BUILDER
DRAWN BY CHECKED BY
DESIGN
DATE
SCALES AMENDMENTS
SHEET NUMBERof
CHARTERED
MEMBER OF
PROPOSED DUPLEX
LOT 225
PHOENIX CRESCENTRURAL VIEW
5886
CV
A 26/02/15
*******
SO
THE NEW GEORGIA -
MKIII HERITAGE
1:100 @ A3
7 19
building designersassociation of
queensland inc.
IGNITE HOMES PTY LTDA.B.N 52128355466QBCC - 1173465PO BOX 1159
TOOMBUL QLD 401207 3630 2924
24
40
490490
22.5 degree Colorbond custom orb roof sheeting with ceiling insulation
Colorbond fascias,gutters & downpipes
Rendered brickworkSelected paintedcladding
FL FL
CL CL
incl. 40 fascia incl. 40 fascia
ELEVATION 1 1:100
24
40
490
22.5 degree Colorbond custom orb roof sheeting with ceiling insulation
Colorbond fascias,gutters & downpipes
Rendered brickworkSelected paintedcladding
FL FL
CL CL
incl. 40 fascia
ELEVATION 2 1:100
NOTES:* Lift off hinges to WC door, as per N.C.C 3.8.3* Provide GPO & cold water provisions to DW space* ALL External and Internal doors & windows to bemeasured on site and confirmed by builder* Sarking to external walls* Insulation to ceiling (living only) R2.5 batts* All windows & SGD to be tinted* Mechanically vent rooms without natural ventilation* All shower roses to be AAA rated* Maximum water supply pressure not to exceed 500kpaat any outlet* Hot water system shall be heat pump, solar or gas*Water supply outlets to have WELs rating* Toilet cisterns to have dual flush. 6/3 Litre* ALL handrails to be 1000mm above finished floor level* Bedroom windows w. 2m fall height from FL to groundbelow must comply with N.C.C 3.9.2.5. To be fitted withnon-removable screens or restricted to 125mm opening* If more than one smoke alarm is required they must beinterconnected as per N.C.C 3.7.2
This is a Mackay Regional Council digitally signed document.
Phone (07) 55 203 022Fax (07) 55 203 033
PO Box 2845 Burleigh Heads DC Qld 4220Address: 2/71 Township Drive, West Burleigh, QLD 4219
ABN 73 097 995 616BSA License No: 1129687Email: [email protected]
© Copyright reserved in part or whole. Writtendimensions take preference.Contractor to verify dimensions.Notify designers of discrepancies.
Failure to do so shall voidthe designers responsibilities.
TH
IS D
ES
IGN
IS
TH
E E
XC
LU
SIV
E P
RO
PE
RT
Y O
F S
TU
AR
T O
SM
AN
BU
ILD
ING
DE
SIG
NS
N.B
ALL
WR
ITT
EN
DIM
EN
SIO
NS
TA
KE
PR
EC
ED
EN
CE
OV
ER
SC
ALE
D S
IZE
S
BE
WA
RN
ED
: S
UB
ST
ITU
TIO
N O
F A
NY
ST
RU
CT
UR
AL M
EM
BE
RS
, A
ND
OR
AN
Y V
AR
IAT
ION
TO
AN
Y P
AR
T O
F T
HE
DE
SIG
N W
ILL V
OID
AN
Y
RE
SP
ON
SIB
ILIT
IES
OF
ST
UA
RT
OS
MA
N B
UIL
DIN
G D
ES
IGN
S F
OR
TH
E S
TR
UC
TU
RA
L IN
TE
GR
ITY
AN
D P
ER
FO
RM
AN
CE
OF
TH
E B
UIL
DIN
G
PROJECT
JOB NUMBER
BUILDER
DRAWN BY CHECKED BY
DESIGN
DATE
SCALES AMENDMENTS
SHEET NUMBERof
CHARTERED
MEMBER OF
PROPOSED DUPLEX
LOT 225
PHOENIX CRESCENTRURAL VIEW
5886
CV
A 26/02/15
*******
SO
THE NEW GEORGIA -
MKIII HERITAGE
1:100 @ A3
8 19
building designersassociation of
queensland inc.
IGNITE HOMES PTY LTDA.B.N 52128355466QBCC - 1173465PO BOX 1159
TOOMBUL QLD 401207 3630 2924
24
40
490490490
490
22.5 degree Colorbond custom orb roof sheeting with ceiling insulation
Colorbond fascias,gutters & downpipes
Rendered brickworkSelected paintedcladding
FL FL
CL CL
incl. 40 fascia
incl. 40 fascia incl. 40 fascia incl. 40 fascia
ELEVATION 3 1:100
24
40
650490
22.5 degree Colorbond custom orb roof sheeting with ceiling insulation
Colorbond fascias,gutters & downpipes
Rendered brickworkSelected paintedcladding
90x90 Timber posts
FL FL
CL CL
incl. 40 fasciaincl. 40 fascia
ELEVATION 4 1:100
NOTES:* Lift off hinges to WC door, as per N.C.C 3.8.3* Provide GPO & cold water provisions to DW space* ALL External and Internal doors & windows to bemeasured on site and confirmed by builder* Sarking to external walls* Insulation to ceiling (living only) R2.5 batts* All windows & SGD to be tinted* Mechanically vent rooms without natural ventilation* All shower roses to be AAA rated* Maximum water supply pressure not to exceed 500kpaat any outlet* Hot water system shall be heat pump, solar or gas*Water supply outlets to have WELs rating* Toilet cisterns to have dual flush. 6/3 Litre* ALL handrails to be 1000mm above finished floor level* Bedroom windows w. 2m fall height from FL to groundbelow must comply with N.C.C 3.9.2.5. To be fitted withnon-removable screens or restricted to 125mm opening* If more than one smoke alarm is required they must beinterconnected as per N.C.C 3.7.2
This is a Mackay Regional Council digitally signed document.
Phone (07) 55 203 022Fax (07) 55 203 033
PO Box 2845 Burleigh Heads DC Qld 4220Address: 2/71 Township Drive, West Burleigh, QLD 4219
ABN 73 097 995 616BSA License No: 1129687Email: [email protected]
© Copyright reserved in part or whole. Writtendimensions take preference.Contractor to verify dimensions.Notify designers of discrepancies.
Failure to do so shall voidthe designers responsibilities.
TH
IS D
ES
IGN
IS
TH
E E
XC
LU
SIV
E P
RO
PE
RT
Y O
F S
TU
AR
T O
SM
AN
BU
ILD
ING
DE
SIG
NS
N.B
ALL
WR
ITT
EN
DIM
EN
SIO
NS
TA
KE
PR
EC
ED
EN
CE
OV
ER
SC
ALE
D S
IZE
S
BE
WA
RN
ED
: S
UB
ST
ITU
TIO
N O
F A
NY
ST
RU
CT
UR
AL M
EM
BE
RS
, A
ND
OR
AN
Y V
AR
IAT
ION
TO
AN
Y P
AR
T O
F T
HE
DE
SIG
N W
ILL V
OID
AN
Y
RE
SP
ON
SIB
ILIT
IES
OF
ST
UA
RT
OS
MA
N B
UIL
DIN
G D
ES
IGN
S F
OR
TH
E S
TR
UC
TU
RA
L IN
TE
GR
ITY
AN
D P
ER
FO
RM
AN
CE
OF
TH
E B
UIL
DIN
G
PROJECT
JOB NUMBER
BUILDER
DRAWN BY CHECKED BY
DESIGN
DATE
SCALES AMENDMENTS
SHEET NUMBERof
CHARTERED
MEMBER OF
PROPOSED DUPLEX
LOT 225
PHOENIX CRESCENTRURAL VIEW
5886
CV
A 26/02/15
*******
SO
THE NEW GEORGIA -
MKIII HERITAGE
1:100 @ A3
15 19
building designersassociation of
queensland inc.
IGNITE HOMES PTY LTDA.B.N 52128355466QBCC - 1173465PO BOX 1159
TOOMBUL QLD 401207 3630 2924
141° 37' 20" 34.5
231°
37' 20"
16.6
7
51°
37' 20"
16.6
7
141° 37' 20"
3
141° 37' 20"
3
141° 37' 20" 34.5
231°
37' 20"
1.0
9
231°
37' 20"
15.5
8
(37.5)
(37.5)
(16.6
7)
EM
T C
B
PH
OE
NIX
C
RE
SC
EN
T
1800mm hightimber fencing
Garden bed with shade treeshrubs and ground cover,
100mm organic mulch over
topsoil
Private Open Space
1800mm high fence withexposed timber posts as feature
Letterbox
Private Open Space
Letterbox- turf over topsoil
- garden bed
- exposed agg. concrete
- grey concrete
- 1800mm treated timber fencing
SYMBOL BOTANICAL NAME
PLANTING SCHEDULE
CORDYLINE
CROTON
STRELITZIA
POT SIZEmm QUANTITY
140mm 4
140mm 4
140mm 4
TUCKEROO 145 litre
TUCKEROO CORDYLINE CROTON STRELITZIA
BUILDING ENVELOPE
BUILDING ENVELOPE
This is a Mackay Regional Council digitally signed document.
This is a Mackay Regional Council digitally signed document.
Decision Notice
Sustainable Planning Act
Sustainable Planning Act Appeals Chapter 7 Part 1 Planning and Environment Court: Division 8 – Appeals to court relating to development applications 461 Appeals by Applicants 1) An applicant for a development application may appeal to the court against any of the following - (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c), or (d) must be started within 20 business days (the applicant’s appeal period) after- (a) if a decision notice or negotiated decision notice is given-the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise-the day a decision notice was required to be given to the applicant. 462 Appeals by submitters – General (1) A submitter for a development application may appeal to the court only against- (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327 (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following- (a) the giving of a development approval; (b) any provision of the approval including- (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter- (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii) (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.
This is a Mackay Regional Council digitally signed document.
Decision Notice
Sustainable Planning Act
463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to- (a) if the prescribed concurrence agency is the chief executive (fisheries)-development that is- (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment- (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2) 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about- (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.
This is a Mackay Regional Council digitally signed document.
Decision Notice
Sustainable Planning Act
NOTICE OF INTENTION TO COMMENCE USE
Planning Approval DA-2015-28
Date of Approval 31 March 2015
Approved Material Change of Use - Dual Occupancy
Location 51 Phoenix Crescent, RURAL VIEW QLD 4740
Property Description Lot 225 on SP264915 I am hereby notifying you of my intention to commence the approved use on ______________________________ (insert date). I have read the conditions of the above Decision Notice and believe that all the applicable conditions have been complied with. Applicant: Ignite Homes Pty Ltd Address: C/- Tim Davies 70 Kitchener Rd ASCOT QLD 4007
_________________________________________ Signature of Applicant Date: ______________
This is a Mackay Regional Council digitally signed document.