1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE...

6
1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012 61 th CIGRE Technical Committee meeting Trondheim Norway, 17-18 April 2013 7 th informal CIGRE Technical Committee meeting Charlotte, USA, 30-31 October 2013 62 nd CIGRE Technical Committee meeting Lima/Cuzco Peru, 26-28 March 2014 CIGRE Technical Committee Information CIGRE AG.01 meeting, Delft, Netherlands,12 th March, 2014 Confidentiality of TC documents No communication of the minutes, including attached documents or drafts, to parties outside the TC is permitted. SC Chairmen can report on the results on the discussions at their SC meeting, but are requested NOT to distribute the documents. A3-14(AG01)004 IW

Transcript of 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE...

Page 1: 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.

1

60th CIGRE Technical Committee meetingParis France, 1 September 2012

6th informal CIGRE Technical Committee meetingMontreal Canada, 3-4 October 2012

61th CIGRE Technical Committee meetingTrondheim Norway, 17-18 April 2013

7th informal CIGRE Technical Committee meetingCharlotte, USA, 30-31 October 2013

62nd CIGRE Technical Committee meetingLima/Cuzco Peru, 26-28 March 2014

CIGRE Technical Committee Information

CIGRE AG.01 meeting, Delft, Netherlands,12th March, 2014

Confidentiality of TC documents No communication of the minutes, including attached documents or drafts, to parties outside the TC is permitted. SC Chairmen can report on the results on the discussions at their SC meeting, but are requested NOT to distribute the documents.

A3-14(AG01)004 IWD

Page 2: 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.

2

A2 Transformers

A3 High voltage equipment

B4 HVDC and Power electronics

A1 Rotating electrical machines B1 Insulated cables

B2 Overhead lines

B3 Substations

B5 Protection and Automation

C1 System development & economics

C2 System operation & control

C3 System environmental performance

C4 System technical performance

C5 Electricity markets & regulations

C6 Distribution systems & dispersed generation

D 1 Materials and emerging test technique D 2 Information systems and telecommunication

CIGRE Technical Committee/ 16 Study Committees

A: Equipment B: Sub-system C: System

D: Common technology

Disseminate new technology and Promote international standardization

Perform studies on topical issues of electric power system and Facilitate the exchange of information

E. Figueiredo (Brazil) /N. Smith (S. Africa)

C. Rajotte (Canada)_Extended

H. Ito (Japan)

P. Argaut (France)_Extended

K. Papailiou (Switzerland)_Extended

T. Krieg (Australia)

B. Anderson (UK) /M. Rashwan (Canada)

I. Patriota de Siqueira (Brazil)

P. Southwell (Australia) /K. Staschus (Germany)

J. Vanzetta (Germany)_Extended

F. Parada (Portugal)

P. Pourbeik (USA)

O. Fosso (Norway) /A. Ott (USA)

N. Hatziagyriou (Greese)/ B. Buchholz (Germany)

J. Kindersberger (Germany)_Extended C. Samitier (Spain)_Extended

Technical committee Chairman: M. Waldron (UK) Secretary: Y. Maugain (France)

Secretary General: Vacancy

Page 3: 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.

3

SD1: Prepare the “strong and smart” power system of the futureThis future power system will have to wheel over long distances bulk power from non carbon sources; it will interconnect the local grid, to compensate for the geographical/temporal variability or lack of flexibility of these sources. It will interface local energy networks (microgrids) which allow the optimized operation of dispersed generation, intelligent loads, storage.. This future Power system will rely massively on new techniques, UHV, DC and Power Electronics, ICT...

SD2: Make the best use of the existing equipment and systemUse better the full built-in capacity, operate the system nearer to its limits; operate the assets up to the end useful life, assess their condition, maintain, refurbish, extend their life, replace...

SD3: Answer the environment concernsDevelop environment friendly materials, less intrusive techniques (cables); use efficiently the assets; reduce carbon footprint of electricity…

SD4: Develop knowledge and informationTechnical expertise, cooperation of worldwide experts and access to information are keys for the success of this evolution.

CIGRE Technical Committee Strategic Directions (SD)

Page 4: 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.

4

Secretary GeneralA job specification was published to get a new Secretary General. Philippe Adam (former TC secretary) is supporting the Central Office on a basis of 3 half days per week. No specific crisis.

TC AwardsTC awards will move from an annual basis to a biennial one.SC chairman will deliver the Awards during the CIGRE Paris session.

CIGRE Web siteThe status and current problems are clarified. The web site should be adapted to CIGRE rules. Update of the password on line is requested.

CIGRE Green bookReference Books are in good progress for SC B1 and B2. SC B3 starts.

CIGRE symposiumToo many papers were cancelled and led to a late reorganization of the Session. Lisbon: 33/124=27%, Auckland: 25/119=21%

CIGRE Technical Committee information

Page 5: 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.

5

Based on TC strategic directions, several TC projects on emerging problems in power system have been promoted.

Network of the futureTC report on 10 technical issues was completed and the main activities are shifted to WGs. TC continues to review their progress. The information on renewable energy challenges will be added.

HVDC gridsTC project will be established when B4 is ready to consider a wider information of other SCs.

Disaster recovery / responseC1 chairman presented the paper on how TSO should train to be able to cope with a fast recovery after a disaster affecting the network.

UHVTC project was disbanded since UHV standardization progressed at IEC based on technical background information collected in CIGRE.

CIGRE Technical Committee Projects

Page 6: 1 60 th CIGRE Technical Committee meeting Paris France, 1 September 2012 6 th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.

6

Rural electrificationC6 is the only SC concerned. Due to a lack of expertise in this area, joint work with organizations such as CIRED or IEEE is needed.

SustainabilityTC project is launched with C3 leader with C6, C1, B2, which would cover economical, social and environmental aspects. The project will greatly contribute to the Strategic direction 3.

Transition of the electricity systemC2 chairman will prepare new draft on this topic.

ENTSO-E standardNew European grid code will become law for all customers connected the European networks. CIGRE should send a position paper to ENTSO-E. TC chairman proposed to wait for the work of WG A1.29.

CIGRE Technical Committee Projects