S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
1 POWER 1.1 _Solicit stakeholders' input when master plan is to be developed to restore confidence and credibility for government's actions
PPP DONE
1.2 _Lagos State Government to determine energy needs/demand and initiate appropriate strategy
WORK & INFRASTRUCTURE
DONE
Work with relevant Federal Government agencies to achieve the following:_Ensure the development of minimum standards for concessionaries
Ministry of Justice
Done
3
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
_Constitute specific legal penalties for power offenders
Ministry of Justice
Done
_Redefine off-grid legislation to capture new town developments for the provision of captive power generation
Ministry of Justice
Done
_The current regulation on Rural Electrification is not optimal for development and should be decentralized to allow for increased access to electricity
Ministry of Justice
Done
4
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
1.3 _Ensure consumers pay their tariffs as and when due; the current legislation on offences in the Electricity Sector Reform Act 2004 should be amended with specific legal provisions for customers who fail to pay their bills
National Assembly
Ongoing
1.4 Exploitation of other energy sources i.e. wind, solar,etc
Min. Of Science & Technology
Done & Ongoing
5
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
1.5 Federal Government should fully implement the Electric Power Sector Reform Act (EPSRA), including:_Prioritizing review of the Multi Year Tariff Order (MYTO) and applying flexibility in licensing for general and distribution
FGN Done
_Continue privatization/concession of Power Holding Company Nigeria successor companies,and deal with all legacy issues
FGN Work-in-Progress
6
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA) STATUS OF IMPLEMENTATION
_Complete the National Independent Power Projects and transfer to world-class operators
FGN Work-in-Progress
_Rehabilitate and maintain existing electricity generating stations to raise the level of electricity capacity
FGN Done
Transmission_Reduce transmission losses to the barest minimum by acquiring the necessary technology needed.
FGN & Min.Of Rural Development
Done and Ongoing
_Construct more transmission lines
FGN & Min.Of Rural Development
Done and Ongoing
7
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
1.6 _Upgrade distribution infrastructure via the provision of relief transformers
FGN & Min. of Rural Development
Done
1.7 Distribution:_Installation of high capacity of transformers
FGN Done and Ongoing
_Billing must be accurate according to consumption
FGN Done and Ongoing
_Cash collection problems should be solved by the use of prepaid meters
FGN Done and Ongoing
8
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
1.8 Intervene in the current commercial structure by playing a more active role in fast tracking the current stalled privatization process.
FGN/LASG Done
1.9 Establish a Lagos state “power commission” with wide ranging roles from planning to research and monitoring.
FGN/LASG Done
9
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
1.10
_ Take decisive action to ensure the availability of gas supply to the state by acquiring gas supplies close to Lagos and guarantee payment for purchase agreement with owners of such fields.
FGN/LASG Done and Ongoing
1.11
_ Introduce the “doctrine of necessity – the problem of power requires the application of “doctrine of necessity” which allows for emergency implementation of power related challenges.
FGN/LASG Done
10
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
_Ensure uninterrupted power supply; Lagos state should undertake:i.Captive IPP in industrial clusters &for specific projects- short term
FGN/LASG Done and Ongoing
ii. Acquire, Rehabilitate and Improve the Distribution Infrastructure
FGN/LASG Done and Ongoing
Liberalise entry into power generation to allow for phased investment in power generation of 5,000 MW to 20,000 MW between 2010 – 2020 for Lagos State.
FGN/LASG Done and Ongoing
11
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
2 Water & sanitation
2.1 Leverage successful projects for new projects while proper and integrated planning is considered integral to success
LSWC Done
2.2 Aggressively invest in waste management Infrastructure and resources across the State; Investment in the sector shall be government- funded or in collaboration with the private sector
LAWMA Done
2.3 Develop and adopt a Sewage Master Plan (SMP) for co-ordinated development of the sector in the State
Min. of Environment
Done
12
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
2.4 Adopt a sustainable sewage and sanitation strategy for (Y2010-2015) for immediate/short term implementation
Min. of Environment
Done
2.5 Develop the appropriate legal framework for sustainable wastewater management
Min. of Justice
Done
2.6 Complete ongoing establishment of regulatory commission for the water sector
LSWC Done
2.7 Install nodal bulk meters for water audit
LSWC Work-in-Progress
13
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
2.8 Implement the water supply improvement programme largely through PPP contract arrangement across service areas by 2011
LSWC Work-in-Progress
2.9 Make Lagos water corporation a public limited liability company by 2012
LSWC Ongoing
2.10 Create an enabling environment and appropriate incentives for investment in the waste management sector
Ministry of Environment
Done
2.11 Promote investment – friendly policies geared towards increasing collaboration between the public and private sectors
PPP Done
14
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
3 REAL ESTATE
3.1 Remove the usual bureaucratic bottlenecks/red-tape in the following agencies: Lands Bureau, Title Registry, Consent Office
Lands Bureau
Done
3.2 Restructure New Towns Development Authority (NTDA) to make it more aggressive and efficient in development of new estates
NTDA Done
3.3 Improve land use by making it easier to add to or replace existing buildings
MPP & UD
Done
15
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
3.4 Actively encourage and support developers in securing Project Finance for major Real Estate investments in Lagos
Min. of Housing
Done
3.5 Actively encourage and support the deepening of the Mortgage finance industry
Min. of Housing
Done
3.6 Lagos State is advised to have a 10-year development plan that will deliver 40,000 housing units annually for residents
Min. of Housing
Done
16
S/N THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
3.7 _Lagos to address multiple/ excessive charges in land transaction
Lands Bureau
Done
3.8 _Address deficiency of experts and skilled artisans in the real estate sector
LASG Done and Ongoing
4 TOURISM 4.1 Develop tourism using the available natural resources for boating, fishing, sailing, yachting, scuba, e.g. 180km stretch and coconut fringed Atlantic beaches and underdeveloped islands
Ministry Of Tourism & IntergovermentalAffairs
Done and Ongoing
17
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA) STATUS OF IMPLEMENTATION
4.2 Develop a tourist focused integrated transportation system including organised and scheduled tourist bus service
Ministry Of Tourism & IntergovermentalAffairs
Work-in-Progress
4.3 Promote Business Travellers' Tourism (1-3days"add-on" to business travel)
Ministry Of Tourism & IntergovermentalAffairs
Work-in-Progress
4.4 Put in place strategic master plan that details and dates desired accomplishments that leverages on distinct tourism interest of prospective tourists
Ministry Of Tourism & IntergovermentalAffairs
Done
18
S/N THEME RESOLUTION/RECOMMENDATIONS
ACTION BY (MDA) STATUS OF IMPLEMENTATION
4.5 _Promote the development of the skilled personnel to drive tourism in the state
Ministry of Tourism& IntergovernmentalAffairs
Work-in-Progress
5 MANUFACTURING, AGRICULTURE & AGRO ALLIED
5.1 Take action along with other tiers of government to address the following priority issues:_ Infrastructure: Power availability for Industrial Sector, Port Decongestion
FGN/LASG Done and Ongoing
19
S/NO THEME RESOLUTION/RECOMMENDATIONS
ACTION BY (MDA) STATUS OF IMPLEMENTATION
_Redirect Government expenditure on fertilizers and tractors to Infrastructure that would benefit Agriculture
Min. Of Agric & Cooperative
Done
_Invest in the Education, Development and Development of highly Skilled Manpower
Min. of Education &Min. of Estab
Done
20
S/NO THEME RESOLUTION/RECOMMENDATIONS
ACTION BY (MDA) STATUS OF IMPLEMENTATION
_Prioritize Exports, technologically intensive and globally competitive-Heavy Industries to take advantage of the availability of sea and air transportation
FGN & Ministry of Transportation
Done
_Actively encourage and support Small & Medium Scale Enterprises(SME)Manufacturers
Ministry of Commerce,MEPB & LESG
Done
5.2 Take action in collaboration with other tiers of government to address the following priority issues
LASG
21
S/NO THEME RESOLUTION/RECOMMENDATIONS
ACTION BY (MDA) STATUS OF IMPLEMENTATION
i. Finance – constitution of state industrial finance corporation for low cost financing
LASG Done - differently
II. Marketing – review of regulations of LASAA
LASG Done
III. Bureaucracy – single window clearance for setting up industrial units, reduced turnaround time for obtaining clearance/ permits and ease of documentation.
LASG Done
22
S/N THEME RESOLUTION/RECOMMENDATIONS
ACTION BY (MDA)
STATUS OF IMPLEMENTATION
IV. Enabling environment for Agriculture to thrive in order to increase production and end over dependence on oil
LASG Done
VI. Establish Industrial Parks and Clusters utilizing the Public Private Partnership Framework
LASG Done and Ongoing
23
S/N THEME RESOLUTION/RECOMMENDATIONS
ACTION BY (MDA)
STATUS OF IMPLEMENTATION
6. TRANSPORTATION
6.1 Resolve/eliminate differences between State and Federal Agencies in order to increase benefits to the nation
Done and Ongoing
6.2 Encourage the development of transportation as a course of study in higher institutions in the State
Done
24
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
6.3 Identify and prepare PPP project(s) for the following:_Intermodal terminals and stations associated with planned MRT and BRT lines_Bus/danfo/molue stop/shelter program_Rolling stock leasing-rail,buses and ferries
Done
25
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
6.4 Completion of strategic plan for bus corridor concession
PPP, MEPB, Min. of Transportation
Done
6.5 Encourage operators to adopt e-payment platform to ensure sustenance of the public transportation system
PPP, MEPB, Min. of Transportation
Done
26
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
6.6 Provide subsidized mass transit system that caters for the less privileged
LAMATA/LAGBUS
Done
6.7 Provide subsidized mass transit system that caters for the less privileged
LAMATA/LAGBUS
Done
6.8 Enact legislation to promote passenger safety especially in relation to children, mothers, aged and disabled
LAMATA/LAGBUS
Done
27
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
6.8 E- ticketing should be established as a solution that can be used across all transportation system – rail, water, rail
LAMATA/LAGBUS
Work-in-Progress (in pilot)
6.9 Enact legislation on compulsory insurance for the commuters on the Rail, Road and Water
LASG Done
7 BUSINESS ENVIRONMENT & COMPETITIVENESS
7.1 Create a conducive atmosphere that is supportive of business
LASG Done and On-going
28
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
7.2 Lagos should strive to actualise the creation of state police, especially a Sheriff Department
LASG Work-in-Progress
7.3 Establish a politically neutral Lagos Economic Development Board (LEDB) to oversee a long term development of the state and a mandate to sell Lagos as a brand
LASG Unclear Implementation
29
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
7.4 Create a $250 million “Lagos Enterprise Support” venture fund managed independent of the state government
LASG Not done, however Innovation Council and R&D fund established
7.5 LESG to establish policy commissions to follow through on decisions and recommendations of summit
LESG Not Done
30
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
7.6 Lagos should deliver high quality public service goods to create a public support base that drives political stability and engenders foreign direct investment
LASG Done
7.7 Lagos must deliberately seek to attract investment as there is a positive correlation between good governance and investment
LASG Done
31
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
8 GENERAL
8.1 Lagos must consciously harness the potential conferred by its nearness to the international markets and the size of its population which can earn it 6-8% growth in productivity.
LASG Done
8.2 Continue to maintain its policy of addressing infrastructure gap by growing public infrastructure stock through borrowing/deficit expenditure and skewing expenditure in favour of capital stock growth.
LASG Done
32
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
8.3 Ensure efficient public service which actively measures and track public perceptions of its plans, programmes and policies.
LASG Done
8.4 Boost tax revenue while avoiding duplications and multiple taxing.
LASG Done
8.5 Actively undertake planning, coordination and regulation to protect citizens and promote business competitiveness.
LASG Done
33
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
8.6 Develop and strengthen institutional frameworks in governance that promote entrenchment of critical policies and processes.
LASG Done
8.7 Encourage entrepreneurship which is a driver of growth and job creation.
LASG Done
8.8 Deepen the capacity of the State to guaranty the security of life and property
LASG Done
34
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
8.9 Leverage and drive investment in specific areas of competitive advantage such as:
- Financial services- Shipping, Logistics
and distribution- Educational services
and IT- Pharmaceutical and
Healthcare
LASG Done and Ongoing
35
S/NO THEME RESOLUTION/RECOMMENDATIONS ACTION BY (MDA)
STATUS OF IMPLEMENTATION
8.10 Establish an enduring partnership with the people to ensure ther buy-in to various programmes and policies.
LASG Done