113 June 2011
ALICE ITS Upgrade Proposal
Work organization
Document scope
Timeline
Editorial board and work organization
Status (next presentations)
Discussion
![Page 2: 1 13 June 2011 ALICE ITS Upgrade Proposal Work organization Document scope Timeline Editorial board and work organization Status (next presentations)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfd21a28abf838cab82c/html5/thumbnails/2.jpg)
213 June 2011
Document Scope (1/2)
Physics motivations for the upgrade • Performance and limitations of current detector• Upgrade scope • Novelty• Competitiveness
Detector functional requirements and specification• Particle density and radiation load for the innermost layer• Number of layers and their geometry • Aceptance, hermeticity, segmentation and alignment • Material budget• Detector efficiency, signal dynamic range and linearity• Event time resolution and readout time• Vertexing and tracking performance• PID performance• Detection time and readout rate• Trigger capabilities
![Page 3: 1 13 June 2011 ALICE ITS Upgrade Proposal Work organization Document scope Timeline Editorial board and work organization Status (next presentations)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfd21a28abf838cab82c/html5/thumbnails/3.jpg)
313 June 2011
Document Scope (2/2)
Detector Technical Implementation
• Technology options and evaluation • Detector design options • R&D plans
Conceptual design for following items
• Detector ladder • Beam pipe and detector integration• Detector ladder mechanical support• Insertion mechanism and installation• Power distribution • Cooling System• Cabling and Service System • Alignment and spatial mapping
![Page 4: 1 13 June 2011 ALICE ITS Upgrade Proposal Work organization Document scope Timeline Editorial board and work organization Status (next presentations)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfd21a28abf838cab82c/html5/thumbnails/4.jpg)
413 June 2011
Document preparation - timeline
Timeline
• Outline and list of figures 20th June
• Draft 0 (abstract for all sections) 27th June
• Draft 1 (draft version of text) 15th July
• Draft 2 (polished text + figures) 26th August (distribute to ITS coll.)
• Comments by ITS collaboration < 12th Setpember
• Draft 3 with comments from ITS 19th Septmeber (distribute to ALICE)
• Comments from ALICE < 10th October
![Page 5: 1 13 June 2011 ALICE ITS Upgrade Proposal Work organization Document scope Timeline Editorial board and work organization Status (next presentations)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfd21a28abf838cab82c/html5/thumbnails/5.jpg)
513 June 2011
Editorial Board
Structure
• Coordinator: Stefan Rossegger
• Editors (explicitly mentioned in the document): all people that are giving a substantial contribution to the activities of the corresponding WGs and/or the preparation of the document.
• Editorial board (EB): G. Usai, A. Dainese, G. Bruno, M. Sitta, P. Riedler, G. Contin,
A. Rivetti, R. Santoro, A. Tauro, V. Manzari, L. Musa
• Document repository in AFS
• WEB page will be set-up by Stefan for the editors