0b750a55
Transcript of 0b750a55
-
8/10/2019 0b750a55
1/15
HYUNDAI ALUMINUM VINASHAREHOLDING COMPANY
Version 5.0 (2012.07.30)
-
8/10/2019 0b750a55
2/15
Address: B2 Road, B Section, Pho NoiA Industrial Zone, Van Lam District,
Hung Yen, Vietnam Legal Representative: Park Suk Bong Position: ChairmanGeneral Director Mobile No: 0914 804 000 Email: [email protected] Tel: (0321) 396 7771~5 Fax: (0321) 396 7770 Bank Name: Vietcombank
Hung Yen Branch Account No: 059-100-158-8919 (+VND) Account Holder: Mr. Park Suk Bong
Address: 25 th floor, 70 Building, Plot E6,Pham Hung Road, Cau Giay, Hanoi
Tel: (04) 3787 7247Fax: (04) 3787 7249Contact Person: Mr. Jeong Ji BeomPosition: Director Mobile No: 0916 107 812Email: [email protected]
FACTORY & HEAD OFFICE HANOI OFFICE
BASIC INFORMATION
-
8/10/2019 0b750a55
3/15
BUSINESS LICENSE (Page 1 & 2)
-
8/10/2019 0b750a55
4/15
BUSINESS LICENSE (Page 3 & 4)
-
8/10/2019 0b750a55
5/15
TAX AND COMPANY CHOP REGISTRATION
-
8/10/2019 0b750a55
6/15
Environmentally Friendly, Light-weight & Multi-functional Aluminum Extrusion Product
Part of Train LCD Frames
1.BUSINESS PORTFOLIO (1/2)
Solar Frames Structures Marine parts
INDUSTRIALFIELD
-
8/10/2019 0b750a55
7/15
-
8/10/2019 0b750a55
8/15
2. COMPANY HISTORY - VIETNAM
Hyundai Aluminum Co. (Korea,Seoul) : 142 persons (142 / 0 )
Hyundai Aluminum Co. (Korea,Ulsan) : 174 persons ( 27 / 147)Hyundai Aluminum Co. (Korea,Daejeon) : 308 persons (109 / 199)
1978. 03 Established as a Subsidiary Company of Hyundai Group.1980. 03 Set up the technical cooperation with ALCAN in Canada and started the production of anodizing.
1982. 11 Set up the technical cooperation with AWA in U.S.A and automatic paint line.
1988. 03 Awarded Fluoropolymer Extrusion Coating Applicator certificate PPG industries
1995. 12 Awarded ISO 9001 certificate
1999. 02 Awarded ISO 14001 certificate (Environment management system)
2005. 08 Launched as Dongyang Gangchul Group
2006. 10 Established Hyundai Aluminum Vina in Vietnam
2008. 01 Equipped & Operated full production line (Dies, Billet, Extrusion, CNC Fabrication, Painting & Assembly)
2010. 08 Awarded TCVN 5838: 1994 (ISO 6362/1:5:1986:1991)
2011. 06 Awarded TCVN ISO 9001:2008 / ISO 9001:2008
2011. 11 Awarded TCVN ISO 14001:2010 / ISO 14001:2004/Cor.1:2009
Chairman : Mr. Park Suk Bong Hyundai Aluminum Vina (Vietnam) : 910 persons (110 / 800)
-
8/10/2019 0b750a55
9/15
3. OWNED PRODUCTION FACTORY
Extrusion Process
Extrusion
Stretching
Cutting
Ageing
Chromate
Primer Coat
Top Coat
Baking
Working Plan
N/c Program
Bar Cutting
Drilling, etc
Final Check, Packing Process
Final Check
Products List
Wrap, Packing
Loading
Assembly Process
Working Order
Material check
Assembling
Size checking
Billet Casting Painting/Finishing Process
Fabrication Process
melting
casting
Homogenizing
-
8/10/2019 0b750a55
10/15
Site :100,048m 2 / Bldg : 57,577 m 2Use : Shop A Casting/Extrusion (14,256 m 2)
Shop B Anodizing/Fabrication(18,044m2
)Shop C Paint, LCD (10,260 m 2)Shop D Special Assembly (14,256m2) -EOffice 761 m2
4. GENERAL VIEW OF FACTORY - VIETNAM
A
C
B
D
Location :75km from Haiphong Port32km from center of Hanoi
Human ResourcesTotal : 910
-
8/10/2019 0b750a55
11/15
9. QUALITY CONTROL & ASSURANCE - GENERAL
TCVN Certificates(838 -5842 : 1994 ISO6362/1-5:1986-1991)
ISO Certificates(ISO 14001:2004/Cor.1:2009 and ISO 9001: 2008)
-
8/10/2019 0b750a55
12/15
1. PURPOSE
The purpose of this method statements is to ensure integral quality control of during curtain wall
work for the projects. This report describes quality control method each phase to comply with
ASTM, ANSI, AAMA, BS, TCVN, KS, JIS, AS & International Standards.
Items that were developed during the performance mock-up test would be controlled by the
substantial QC/QA plan.
2. SUMMARY
Curtain wall contractors are control their product quality by applying quality control/quality assurance
program to each manufacturer during conducting construction. Material manufacturers should
inspect after they are provided required items, and provide a report showing the results of
inspection. This report is reviewed by quality controller periodically and is filed up to the end of the
completion point in order to carry out smooth progress of construction.
9. QUALITY CONTROL & ASSURANCE - GENERAL
-
8/10/2019 0b750a55
13/15
ISO CERTIFICATION (ISO 14001:2004/Cor.1:2009 and ISO 9001: 2008)
-
8/10/2019 0b750a55
14/15
TCVN(838 -5842 : 1994 ISO6362/1-5:1986-1991)
-
8/10/2019 0b750a55
15/15