0b750a55

download 0b750a55

of 15

Transcript of 0b750a55

  • 8/10/2019 0b750a55

    1/15

    HYUNDAI ALUMINUM VINASHAREHOLDING COMPANY

    Version 5.0 (2012.07.30)

  • 8/10/2019 0b750a55

    2/15

    Address: B2 Road, B Section, Pho NoiA Industrial Zone, Van Lam District,

    Hung Yen, Vietnam Legal Representative: Park Suk Bong Position: ChairmanGeneral Director Mobile No: 0914 804 000 Email: [email protected] Tel: (0321) 396 7771~5 Fax: (0321) 396 7770 Bank Name: Vietcombank

    Hung Yen Branch Account No: 059-100-158-8919 (+VND) Account Holder: Mr. Park Suk Bong

    Address: 25 th floor, 70 Building, Plot E6,Pham Hung Road, Cau Giay, Hanoi

    Tel: (04) 3787 7247Fax: (04) 3787 7249Contact Person: Mr. Jeong Ji BeomPosition: Director Mobile No: 0916 107 812Email: [email protected]

    FACTORY & HEAD OFFICE HANOI OFFICE

    BASIC INFORMATION

  • 8/10/2019 0b750a55

    3/15

    BUSINESS LICENSE (Page 1 & 2)

  • 8/10/2019 0b750a55

    4/15

    BUSINESS LICENSE (Page 3 & 4)

  • 8/10/2019 0b750a55

    5/15

    TAX AND COMPANY CHOP REGISTRATION

  • 8/10/2019 0b750a55

    6/15

    Environmentally Friendly, Light-weight & Multi-functional Aluminum Extrusion Product

    Part of Train LCD Frames

    1.BUSINESS PORTFOLIO (1/2)

    Solar Frames Structures Marine parts

    INDUSTRIALFIELD

  • 8/10/2019 0b750a55

    7/15

  • 8/10/2019 0b750a55

    8/15

    2. COMPANY HISTORY - VIETNAM

    Hyundai Aluminum Co. (Korea,Seoul) : 142 persons (142 / 0 )

    Hyundai Aluminum Co. (Korea,Ulsan) : 174 persons ( 27 / 147)Hyundai Aluminum Co. (Korea,Daejeon) : 308 persons (109 / 199)

    1978. 03 Established as a Subsidiary Company of Hyundai Group.1980. 03 Set up the technical cooperation with ALCAN in Canada and started the production of anodizing.

    1982. 11 Set up the technical cooperation with AWA in U.S.A and automatic paint line.

    1988. 03 Awarded Fluoropolymer Extrusion Coating Applicator certificate PPG industries

    1995. 12 Awarded ISO 9001 certificate

    1999. 02 Awarded ISO 14001 certificate (Environment management system)

    2005. 08 Launched as Dongyang Gangchul Group

    2006. 10 Established Hyundai Aluminum Vina in Vietnam

    2008. 01 Equipped & Operated full production line (Dies, Billet, Extrusion, CNC Fabrication, Painting & Assembly)

    2010. 08 Awarded TCVN 5838: 1994 (ISO 6362/1:5:1986:1991)

    2011. 06 Awarded TCVN ISO 9001:2008 / ISO 9001:2008

    2011. 11 Awarded TCVN ISO 14001:2010 / ISO 14001:2004/Cor.1:2009

    Chairman : Mr. Park Suk Bong Hyundai Aluminum Vina (Vietnam) : 910 persons (110 / 800)

  • 8/10/2019 0b750a55

    9/15

    3. OWNED PRODUCTION FACTORY

    Extrusion Process

    Extrusion

    Stretching

    Cutting

    Ageing

    Chromate

    Primer Coat

    Top Coat

    Baking

    Working Plan

    N/c Program

    Bar Cutting

    Drilling, etc

    Final Check, Packing Process

    Final Check

    Products List

    Wrap, Packing

    Loading

    Assembly Process

    Working Order

    Material check

    Assembling

    Size checking

    Billet Casting Painting/Finishing Process

    Fabrication Process

    melting

    casting

    Homogenizing

  • 8/10/2019 0b750a55

    10/15

    Site :100,048m 2 / Bldg : 57,577 m 2Use : Shop A Casting/Extrusion (14,256 m 2)

    Shop B Anodizing/Fabrication(18,044m2

    )Shop C Paint, LCD (10,260 m 2)Shop D Special Assembly (14,256m2) -EOffice 761 m2

    4. GENERAL VIEW OF FACTORY - VIETNAM

    A

    C

    B

    D

    Location :75km from Haiphong Port32km from center of Hanoi

    Human ResourcesTotal : 910

  • 8/10/2019 0b750a55

    11/15

    9. QUALITY CONTROL & ASSURANCE - GENERAL

    TCVN Certificates(838 -5842 : 1994 ISO6362/1-5:1986-1991)

    ISO Certificates(ISO 14001:2004/Cor.1:2009 and ISO 9001: 2008)

  • 8/10/2019 0b750a55

    12/15

    1. PURPOSE

    The purpose of this method statements is to ensure integral quality control of during curtain wall

    work for the projects. This report describes quality control method each phase to comply with

    ASTM, ANSI, AAMA, BS, TCVN, KS, JIS, AS & International Standards.

    Items that were developed during the performance mock-up test would be controlled by the

    substantial QC/QA plan.

    2. SUMMARY

    Curtain wall contractors are control their product quality by applying quality control/quality assurance

    program to each manufacturer during conducting construction. Material manufacturers should

    inspect after they are provided required items, and provide a report showing the results of

    inspection. This report is reviewed by quality controller periodically and is filed up to the end of the

    completion point in order to carry out smooth progress of construction.

    9. QUALITY CONTROL & ASSURANCE - GENERAL

  • 8/10/2019 0b750a55

    13/15

    ISO CERTIFICATION (ISO 14001:2004/Cor.1:2009 and ISO 9001: 2008)

  • 8/10/2019 0b750a55

    14/15

    TCVN(838 -5842 : 1994 ISO6362/1-5:1986-1991)

  • 8/10/2019 0b750a55

    15/15