09/0309/03
Page Page 11
FAA AMHS Implementation PlanFAA AMHS Implementation PlanBangkok, ThailandBangkok, Thailand
November 19, 2003November 19, 2003
FAA AMHS Implementation PlanFAA AMHS Implementation PlanBangkok, ThailandBangkok, Thailand
November 19, 2003November 19, 2003
09/0309/03
Page Page 22
Outline
• ATN/AMHS Routing Concept• US and Asia/Pac ATN/AMHS Routing Architecture • FAA ATN/AMHS Service with Alternative Route• Asia/Pacific ATN Router Plan• Relationship between FTI and ATN• Global ATN Internet• FAA Fully Redundant ATN Router• FAA AMHS System• FAA AMHS Interconnection Diagram• FAA ATN Router and AMHS System in Salt Lake City NNCC• FAA ATN/AMHS Network Management Position in Salt Lake City NNCC• FAA NADIN MSN Processor with GPS Time Server• FAA/JCAB ATN/AMHS Addressing and Naming• FAA/JCAB ATN Router Site Acceptance Test• FAA/JCAB ATN/AMHS Site Acceptance Test• ATN BIS Router ICD• ATN/AMHS ICD• FAA AMHS Implementation Plan• Conclusion
09/0309/03
Page Page 33
ATN/AMHS Routing Concept
R D 1
R
R R
R D 3
R D 4
R D n
R D 2
R
R R
ID R P
ID R P
ID R P
R
A M H S E S - IS
E S - IS
IS - IS
IS - IS
A M H S
IS - IS
E S - IS A M H S
IS - IS
IS - IS
ID R P
ID R P
ID R P
ID R P
09/0309/03
Page Page 44
US and Asia/Pac ATN/AMHS/AFTN Routing Architecture
JapanJapan
New ZealandNew ZealandAustraliAustraliaa
FijiFiji
SingaporeSingapore
Hong KongHong Kong
USUS
ATNATN
AFTNAFTN
AFTNAFTN
AFTNAFTN
AFTNAFTN
ATNATN
ATNATN
ATNATN
AFTNAFTN
09/0309/03
Page Page 55
F i j i
J a p a n
R O A K
K
R S L C
R in t r a
R in t r a M T A
IS - IS
IS - IS
IS - IS
E S - IS
ID R P
ID R P
U .S . F A A D o m a in ID R P R
R
R
E S - IS
FAA ATN/AMHS Service with Alternative Route
09/0309/03
Page Page 66
09/0309/03
Page Page 77
09/0309/03
Page Page 88
09/0309/03
Page Page 99
Relationship between FTI and ATNIDRPIDRP
FTI
ATNRouter
RIU
ATNRouter
RIU
ATNRouter
RIU
ATNRouter
RIU
IS-IS
IS-ISIS-IS
IS-IS
IDRP
IDRP
IDRP
IDRP
R
R
R
RRR
R
R
R
R
RRR
R
R
R
R
R
R
R
IDRP
International Connection
IDRP
International Connection
• ATN Router is used as access point for IDRP
• Using FTI Router to optimize bandwidth
• Using FTI to monitor/divert traffic
RIU: Radio Interface Unit
09/0309/03
Page Page 1010
Global ATN Internet
ATN
RIU
RIU
RIU
RIU
IDRP
IDRP
IDRP
IDRP
R
R
R
RRR
R
R
R
R
RRR
R
R
R
R
R
R
R
IDRP
Hong Kong
IDRP
U.S.
IDRP
Fiji
IDRP
IDRP
IDRPIDRP
IDRP
IDRP
IDRP
U.K.
RIU
Japan
09/0309/03
Page Page 1111
FAA Fully Redundant ATN Router
ATN Router
ATN Router
Line Exchange
FAA ATN Router
X.25 Switch
ATN Router
ATN Router
ATN Router
Intra-Domain Router
FAA Domain Other Domain
ATN Router
09/0309/03
Page Page 1212
FAA AMHS System
MTA C
Mail Box
ControlPosition
AFTNProcessor
ASMTP
AMHSPop3
X.25
Out/IncomingMessage
AFTN
• MTA (Message Transfer Agent) CSend out ATN Message
• MTA DListen incoming message
• AFTN (Aeronautical Fixed Telecommunication Network)Handle message to control position
• AMHS (ATN Message Handling System) Pop3Retrieve email message
• ASMTP (ATN Simple Mail Transfer Protocol)Handle incoming and outgoing local email message
MTA D
ATN Mail User
LOG
Router
09/0309/03
Page Page 1313
FAA AMHS Interconnection Diagram
ATN Router
LAN
TCP/IP/CLNP
Control Position
X.25 NADINPSN
MTA
ATN
Network Network Management
FAA AMHS
ES-IS
NADINMSN
Host
X.25X.25
AFTN
09/0309/03
Page Page 1414
FAA ATN Router and AMHS Systemin Salt Lake City NNCC
09/0309/03
Page Page 1515
FAA ATN/AMHS Network ManagementPosition in Salt Lake City NNCC
09/0309/03
Page Page 1616
FAA NADIN MSN Processor with GPS Time Server
09/0309/03
Page Page 1717
FAA/JCAB ATN/AMHS AddressingAnd Naming
ID Routing Domain Prefix NSAP or NET (not including the prefix) System Name
System Type
Point of Contact Location
1 470027+8181.524A.0001.0101 Japan
1.1 .0302.0000.0000.0000.00 BIS
1.2 .0302.1280.0109.1001.01 jpamhs AMHS
2 470027+8185.4B00.0001.0101 USA
2.1 .0302.0000.0001.0001.00 BIS
2.2 .0302.0000.0001.0001.01 kslcmta AMHS
09/0309/03
Page Page 1818
FAA/JCAB ATN Router Site Acceptance Test
ATN Router
: L ine in Operation
: L ine for Testing
Narita Salt Lake City
SDECC
9.6 Kbps
Simulated ES
Simulated ES ATN
Router
AFTN
Center AFTAX
64 Kbps
• ATN Router Site Acceptance Test Configuration
09/0309/03
Page Page 1919
Item No.
Test Item Notes
1 BIS Connection Establishment Establish LAPB, X.25 VC and IDRP connections between BIS routers.
2 BIS Connection Maintenance Exchange of KEEPALIVE PDUs
3 NPDU Transmission Tests to confirm correct NPDU relaying using ERQ NPDUs, and validation of routeing of PDUs with invalid security option parameter.
4 BIS Disconnection and Re-establishment Manual BIS disconnection and re-establishment.
5 Failure and Recovery X.25 circuit failure and recovery.BIS failure and recovery
* Detail of Test procedure is in the Test Procedure for ATN Router Connection Test via ATN Router between the United States and Japan.
FAA/JCAB ATN Router Site Acceptance Test (Cont.)
• ATN Router Site Acceptance Test Items
09/0309/03
Page Page 2020
ATN Router
: L ine in Operation
: L ine for Testing
Narita Salt Lake City
SDECC
9.6 Kbps
AFTN Test System AMHS
AMHS ATN Router
AFTN
Center AFTAX
64 Kbps
FAA/JCAB ATN/AMHS Site Acceptance Test
• ATN/AMHS Site Acceptance Test Configuration
09/0309/03
Page Page 2121
Item No. Test Item Schedule
1 Confirmation of transmission/reception of messages
2 Confirmation transmission/reception of messages when error occurred in adjacent AMHS
3 Stress Test on Bandwidth Oct. to Nov. 2003
4 Confirmation of Switching to Back Up System
5 Continuous Operation (24 hours)
* Detail of Test procedure is in the Test Procedure for AMHS Connection Test via ATN Router between the United States and Japan.
• ATN/AMHS Site Acceptance Test Items
FAA/JCAB ATN/AMHS Site Acceptance Test (Cont.)
09/0309/03
Page Page 2222
ATN BIS Router ICD
• Compliant with ICAO DOC 9705 version 3.0– CLNP as routed protocol– IDRP as routing protocol– SNDCF for ISO 8208 sub-layer
• Using X.25 Switch Virtual Circuit as ATN sub-network– ISO 8208 Packet Layer Protocol– LAPB as Data Link Layer– Physical Layer is local issue
• Detail refers to Asia/Pac Regional Router ICD for ATN G-G Router
09/0309/03
Page Page 2323
Compliant with ICAO DOC 9705 version 3.0• Application Layer: MHS (ITU-T, X.400), RTSE
(ISO 9066-2) and ACSE (ISO 8650)• Presentation Layer: ISO 8823, and support
mandatory function of normal model in ISO/IEC ISP 10611-2
• Session Layer: ISO 8327 • Transport Layer: COTP specified in ICAO DOC
9705/AN-956
AMHS ICD
09/0309/03
Page Page 2424
AMHS ICD (Cont.)
• Network Layer: CLNP routed protocol, ES-IS as routing protocol and SNDCF for ISO 8802 sub-layer
• Data Link Layer: LAPB• Physical Layer: is local issue• Detail refers to Asia/Pac Regional AMHS ICD
09/0309/03
Page Page 2525
FAA ATN/AMHS Implementation Plan
• Japan Start Finish– Site Acceptance Test 09/03 01/04
– Initial Operation (Cut Over) 03/04
– De-Commission of AFTN Service 09/04
• Fiji– Site Acceptance Test 09/04 10/04
– Initial Operation (Cut Over) 12/04
– De-Commission of AFTN Service 01/05
09/0309/03
Page Page 2626
FAA ATN/AMHS Implementation Plan (Cont.)
• Hong Kong (China)– Technical Interchange Meeting for dial-up trial
• China – Technical Interchange Meeting and agreement is pending
09/0309/03
Page Page 2727
Conclusion
• The AMHS Service using X.25 IDRP Router is planned to be in operation as of 03/04
• Plan to expand router site in Oakland ARTCC is in process to provide diversity
• Plan to use ATN router’s IS-IS function to support IP sub-network for AMHS Service
• FAA is currently developing a plan to replace its AFTN switching equipment (NADIN MSN) which will fully integrate AMHS functions