09 - Section H Schedule A Labor Rates · Millwright ‐$ Painter ‐$ ... Laborers - Group 1 JM...
Transcript of 09 - Section H Schedule A Labor Rates · Millwright ‐$ Painter ‐$ ... Laborers - Group 1 JM...
Schedule A Base Labor Rates
RFP No. 314298 Project No. T2R02
Total Pages Attached 67
Schedule A
Labor Rate Schedule (Base Year)
Description Estimated Cost
1.0 Professional LaborSafety ‐$
Supervision ‐$
Quality ‐$
Administrative ‐$
Management ‐$
Subtotal ‐$
2.0 Craft Labor
Laborer ‐$
Electrician ‐$ Craft Small Tools and Expendables Percentage
Pipefitter ‐$
Teamster ‐$
Ironworker ‐$
Operator ‐$ G&A /Overhead Percentage
Carpenter ‐$
Sheet Metal Worker ‐$
Insulator ‐$
Cement Mason ‐$ Profit Percentage
Millwright ‐$
Painter ‐$
Drywall Finisher ‐$
Bricklayer ‐$
Roofer ‐$
Sprinkler Fitter ‐$
Boilermaker ‐$
Subtotal ‐$
3.0 Materials1
TBD
4.0 Rental/Owned Equipment1 TBD
5.0 Sub‐Tier Subcontracts1 TBD
Grand Total ‐$ 1 Direct Pass Through Cost ODCs (see T&M Provisions)
Notes:1. Estimated cost for proposal evaluation purposes only.
2. Values generated on the "Estimate" Worksheets.
3. Material, rental equipment, and Sub‐tier subcontracts to be determined (TBD).
4. See notes on individual worksheets.
5. All labor categories must have an estimated value.
No adjustments allowed at the
Category/Classification Level
SCHEDULE A BASE PERIOD OF PERFORMANCE COST
ESTIMATE SUMMARY
FIXED RATES
Craft Labor Only, (if applicable assure not built in to
indirect rates)
No adjustments allowed at the
Category/Classification Level
Yellow Highlight throughout the
workbook are cell where entrys must be
made
Page 1 of 1
Professional Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Safety
Safety Assistant Regular $0.00 414 $0.00
Safety Assistant Overtime $0.00 103 $0.00
Junior Safety Professional Regular $0.00 414 $0.00
Junior Safety Professional Overtime $0.00 103 $0.00
Safety Professional Regular $0.00 5796 $0.00
Safety Professional Overtime $0.00 1449 $0.00
Senior Safety Professional Regular $0.00 1656 $0.00
Senior Safety Professional Overtime $0.00 414 $0.00
Subtotal $0.00
Supervision
Junior Field Work Supervisor Regular $0.00 1892 $0.00
Junior Field Work Supervisor Overtime $0.00 473 $0.00
Field Work Supervisor Regular $0.00 6624 $0.00
Field Work Supervisor Overtime $0.00 1656 $0.00
Senior Field Work Supervisor Regular $0.00 4731 $0.00
Senior Field Work Supervisor Overtime $0.00 1182 $0.00
Junior Superintendent Regular $0.00 1892 $0.00
Junior Superintendent Overtime $0.00 473 $0.00
Superintendent Regular $0.00 1892 $0.00
Superintendent Overtime $0.00 473 $0.00
Senior Superintendent Regular $0.00 1892 $0.00
Senior Superintendent Overtime $0.00 473 $0.00
Subtotal $0.00
Quality
Quality Assurance Engineer Regular $0.00 1419 $0.00
Quality Assurance Engineer Overtime $0.00 354 $0.00
Quality Assurance Manager Regular $0.00 1182 $0.00
Quality Assurance Manager Overtime $0.00 295 $0.00
Junior Quality Control Engineer Regular $0.00 946 $0.00
Junior Quality Control Engineer Overtime $0.00 236 $0.00
Senior Quality Control Engineer Regular $0.00 1182 $0.00
Senior Quality Control Engineer Overtime $0.00 236 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Professional Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Subtotal $0.00
Administrative
Training Coordinator Regular $0.00 1892 $0.00
Training Coordinator Overtime $0.00 473 $0.00
Document Control/Time Keeper Regular $0.00 1892 $0.00
Document Control/Time Keeper Overtime $0.00 473 $0.00
Junior Administrative Assistant Regular $0.00 2838 $0.00
Junior Administrative Assistant Overtime $0.00 709 $0.00
Senior Administrative Assistant Regular $0.00 2838 $0.00
Senior Administrative Assistant Overtime $0.00 709 $0.00
Subtotal $0.00
Management
Junior Project Manager Regular $0.00 1892 $0.00
Junior Project Manager Overtime $0.00 473 $0.00
Senior Project Manager Regular $0.00 3548 $0.00
Subtotal $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and will
be utilized for release costs.
Page 2 of 2
Overhead/G&A
%
[2] Overhead/G&A
(% [1]) $/hr.[3] Profit %
[4] Profit
([1]+[2])[3] $/hr.
Safety
Safety Assistant Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Safety Assistant Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Safety Professional Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Safety Professional Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Safety Professional Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Safety Professional Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Safety Professional Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Safety Professional Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Supervision
Junior Field Work Supervisor Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Field Work Supervisor Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Field Work Supervisor Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Field Work Supervisor Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Field Work Supervisor Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Field Work Supervisor Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Superintendent Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Superintendent Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Superintendent Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Superintendent Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Superintendent Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Superintendent Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Quality
Quality Assurance Engineer Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Quality Assurance Engineer Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Quality Assurance Manager Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Quality Assurance Manager Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Quality Control Engineer Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Quality Control Engineer Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Quality Control Engineer Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Quality Control Engineer Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Administrative
Training Coordinator Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Training Coordinator Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Document Control/Time Keeper Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Document Control/Time Keeper Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Administrative Assistant Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Administrative Assistant Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Administrative Assistant Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Administrative Assistant Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Management
Junior Project Manager Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Junior Project Manager Overtime ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
Senior Project Manager Regular ‐$ 0.000% ‐$ 0.000% ‐$ ‐$
‐$
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead and G&A rates must be the same % for all professional labor categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentages in accordance with Note 1 and 5.3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Professional hourly rates are the established rates for the BASE PERIOD OF PERFORMANCE.5. Profit must be the same % for all professional labor categories. (Enter percentages in BASE POP Summary Cost Estimate Sheet)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Professional Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance (Payroll
Taxes/Fringe
Benefits) $/hr.
[1] Subtotal
Calculated on Base Rate
Page 1 of 1
Laborer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Laborer
Laborers -Group 1 GF Regular $0.00 2030 $0.00
Laborers -Group 1 GF Overtime $0.00 406 $0.00
Laborers -Group 1 GF Double Time $0.00 203 $0.00
Laborers- Group 1 FM Regular $0.00 4061 $0.00
Laborers- Group 1 FM Overtime $0.00 812 $0.00
Laborers- Group 1 FM Double Time $0.00 406 $0.00
Laborers - Group 1 JM Regular $0.00 14215 $0.00
Laborers - Group 1 JM Overtime $0.00 2843 $0.00
Laborers - Group 1 JM Double Time $0.00 1421 $0.00
Laborers - Group 2 GF Regular $0.00 184 $0.00
Laborers - Group 2 GF Overtime $0.00 36 $0.00
Laborers - Group 2 GF Double Time $0.00 18 $0.00
Laborers - Group 2 FM Regular $0.00 369 $0.00
Laborers - Group 2 FM Overtime $0.00 73 $0.00
Laborers - Group 2 FM Double Time $0.00 36 $0.00
Laborers - Group 2 JM Regular $0.00 14215 $0.00
Laborers - Group 2 JM Overtime $0.00 2843 $0.00
Laborers - Group 2 JM Double Time $0.00 1421 $0.00
Laborers - Group 3 GF Regular $0.00 184 $0.00
Laborers - Group 3 GF Overtime $0.00 36 $0.00
Laborers - Group 3 GF Double Time $0.00 18 $0.00
Laborers - Group 3 FM Regular $0.00 369 $0.00
Laborers - Group 3 FM Overtime $0.00 73 $0.00
Laborers - Group 3 FM Double Time $0.00 36 $0.00
Laborers - Group 3 JM Regular $0.00 1292 $0.00
Laborers - Group 3 JM Overtime $0.00 258 $0.00
Laborers - Group 3 JM Double Time $0.00 129 $0.00
Laborers - Group 4 GF Regular $0.00 184 $0.00
Laborers - Group 4 GF Overtime $0.00 36 $0.00
Laborers - Group 4 GF Double Time $0.00 18 $0.00
Laborers - Group 4 FM Regular $0.00 369 $0.00
Laborers - Group 4 FM Overtime $0.00 73 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 3
Laborer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Laborer
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Laborers - Group 4 FM Double Time $0.00 36 $0.00
Laborers - Group 4 JM Regular $0.00 1292 $0.00
Laborers - Group 4 JM Overtime $0.00 258 $0.00
Laborers - Group 4 JM Double Time $0.00 129 $0.00
Laborers - Group 6 GF Regular $0.00 369 $0.00
Laborers - Group 6 GF Overtime $0.00 73 $0.00
Laborers - Group 6 GF Double Time $0.00 36 $0.00
Laborers - Group 6 FM Regular $0.00 738 $0.00
Laborers - Group 6 FM Overtime $0.00 147 $0.00
Laborers - Group 6 FM Double Time $0.00 73 $0.00
Laborers - Group 6 JM Regular $0.00 2584 $0.00
Laborers - Group 6 JM Overtime $0.00 516 $0.00
Laborers - Group 6 JM Double Time $0.00 258 $0.00
Laborers - Group 9 GF Regular $0.00 184 $0.00
Laborers - Group 9 GF Overtime $0.00 36 $0.00
Laborers - Group 9 GF Double Time $0.00 18 $0.00
Laborers - Group 9 FM Regular $0.00 369 $0.00
Laborers - Group 9 FM Overtime $0.00 73 $0.00
Laborers - Group 9 FM Double Time $0.00 36 $0.00
Laborers - Group 9 JM Regular $0.00 1292 $0.00
Laborers - Group 9 JM Overtime $0.00 258 $0.00
Laborers - Group 9 JM Double Time $0.00 129 $0.00
Laborers - APP 60% Regular $0.00 1107 $0.00
Laborers - APP 60% Overtime $0.00 221 $0.00
Laborers - APP 60% Double Time $0.00 110 $0.00
Laborers - APP 70% Regular $0.00 738 $0.00
Laborers - APP 70% Overtime $0.00 147 $0.00
Laborers - APP 70% Double Time $0.00 73 $0.00
Laborers - APP 80% Regular $0.00 738 $0.00
Laborers - APP 80% Overtime $0.00 147 $0.00
Laborers - APP 80% Double Time $0.00 73 $0.00
Laborers - APP 85% Regular $0.00 738 $0.00
Page 2 of 3
Laborer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Laborer
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Laborers - APP 85% Overtime $0.00 147 $0.00
Laborers - APP 85% Double Time $0.00 73 $0.00
Laborers - APP 90% Regular $0.00 1107 $0.00
Laborers - APP 90% Overtime $0.00 221 $0.00
Laborers - APP 90% Double Time $0.00 110 $0.00
Laborers - APP 95% Regular $0.00 1107 $0.00
Laborers - APP 95% Overtime $0.00 221 $0.00
Laborers - APP 95% Double Time $0.00 110 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 3 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Laborer
Laborers -Group 1 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers -Group 1 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers -Group 1 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers- Group 1 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers- Group 1 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers- Group 1 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 1 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 1 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 1 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 2 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 3 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 4 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborer Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
[1]
Subtotal
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Laborer
Laborer Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
[1]
Subtotal
Small Tools Expendables Adder Calculated on Base Rate
Laborers - Group 6 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 6 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - Group 9 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Laborers - APP 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Laborer
Laborer Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
[1]
Subtotal
Small Tools Expendables Adder Calculated on Base Rate
c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 3 of 3
Electrician's Labor Category Rate TypeFully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Electrician
Electrician-Gen. Foreman Regular $0.00 1181 $0.00
Electrician-Gen.Foreman Overtime $0.00 236 $0.00
Electrician-Gen. Foreman Double Time $0.00 118 $0.00
Electrician-Foreman (10%) Regular $0.00 3071 $0.00
Electrician-Foreman (10%) Overtime $0.00 614 $0.00
Electrician-Foreman (10%) Double Time $0.00 307 $0.00
Electrician-Foreman (15%) Regular $0.00 2835 $0.00
Electrician-Foreman (15%) Overtime $0.00 567 $0.00
Electrician-Foreman (15%) Double Time $0.00 283 $0.00
Electrician-Journeyman Cable Splicer (5%) Regular $0.00 2362 $0.00
Electrician-Journeyman Cable Splicer (5%) Overtime $0.00 472 $0.00
Electrician-Journeyman Cable Splicer (5%) Double Time $0.00 236 $0.00
Electrician-Journeyman Welder (10%) Regular $0.00 200 $0.00
Electrician-Journeyman Welder (10%) Overtime $0.00 40 $0.00
Electrician-Journeyman Welder (10%) Double Time $0.00 20 $0.00
Electrician-Journeyman Regular $0.00 10632 $0.00
Electrician-Journeyman Overtime $0.00 2126 $0.00
Electrician-Journeyman Double Time $0.00 1063 $0.00
Electrician-Apprentice 40% Regular $0.00 472 $0.00
Electrician-Apprentice 40% Overtime $0.00 94 $0.00
Electrician-Apprentice 40% Double Time $0.00 47 $0.00
Electrician-Apprentice 45% Regular $0.00 472 $0.00
Electrician-Apprentice 45% Overtime $0.00 94 $0.00
Electrician-Apprentice 45% Double Time $0.00 47 $0.00
Electrician-Apprentice 50% Regular $0.00 472 $0.00
Electrician-Apprentice 50% Overtime $0.00 94 $0.00
Electrician-Apprentice 50% Double Time $0.00 47 $0.00
Electrician-Apprentice 65% Regular $0.00 708 $0.00
Electrician-Apprentice 65% Overtime $0.00 141 $0.00
Electrician-Apprentice 65% Double Time $0.00 70 $0.00
Electrician-Apprentice 80% Regular $0.00 708 $0.00
Electrician-Apprentice 80% Overtime $0.00 141 $0.00
Electrician-Apprentice 80% Double Time $0.00 70 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Electrician's Labor Category Rate TypeFully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Electrician
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Electrician-Apprentice 85% Regular $0.00 708 $0.00
Electrician-Apprentice 85% Overtime $0.00 141 $0.00
Electrician-Apprentice 85% Double Time $0.00 70 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and will
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Electrician
Electrician-Gen. Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Gen.Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Gen. Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Foreman (10%) Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Foreman (10%) Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Foreman (10%) Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Foreman (15%) Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Foreman (15%) Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Foreman (15%) Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Cable Splicer (5%) Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Cable Splicer (5%) Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Cable Splicer (5%) Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Welder (10%) Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Welder (10%) Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Welder (10%) Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 40% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 40% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 40% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 45% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 45% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 45% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 50% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 50% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 50% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Electrician-Apprentice 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Electrician's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Pipefitter's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Pipefitter
Pipefitters - Gen Foreman Regular $0.00 514 $0.00
Pipefitters - Gen Foreman Overtime $0.00 102 $0.00
Pipefitters - Gen Foreman Double Time $0.00 51 $0.00
Pipefitters - Gen Foreman 25% Regular $0.00 80 $0.00
Pipefitters - Gen Foreman 25% Overtime $0.00 30 $0.00
Pipefitters - Gen Foreman 25% Double Time $0.00 20 $0.00
Pipefitters-Foreman 15% Regular $0.00 1850 $0.00
Pipefitters-Foreman 15% Overtime $0.00 370 $0.00
Pipefitters-Foreman 15% Double Time $0.00 185 $0.00
Pipefitters - Foreman 10% Regular $0.00 2056 $0.00
Pipefitters - Foreman 10% Overtime $0.00 411 $0.00
Pipefitters - Foreman 10% Double Time $0.00 205 $0.00
Pipefitters - Journeyman Regular $0.00 4627 $0.00
Pipefitters - Journeyman Overtime $0.00 925 $0.00
Pipefitters - Journeyman Double Time $0.00 462 $0.00
Pipefitters - APP 45% Regular $0.00 102 $0.00
Pipefitters - APP 45% Overtime $0.00 20 $0.00
Pipefitters - APP 45% Double Time $0.00 10 $0.00
Pipefitters - APP 50% Regular $0.00 102 $0.00
Pipefitters - APP 50% Overtime $0.00 20 $0.00
Pipefitters - APP 50% Double Time $0.00 10 $0.00
Pipefitters - APP 55% Regular $0.00 102 $0.00
Pipefitters - APP 55% Overtime $0.00 20 $0.00
Pipefitters - APP 55% Double Time $0.00 10 $0.00
Pipefitters - APP 60% Regular $0.00 102 $0.00
Pipefitters - APP 60% Overtime $0.00 20 $0.00
Pipefitters - APP 60% Double Time $0.00 10 $0.00
Pipefitters - APP 65% Regular $0.00 205 $0.00
Pipefitters - APP 65% Overtime $0.00 41 $0.00
Pipefitters - APP 65% Double Time $0.00 20 $0.00
Pipefitters - APP 70% Regular $0.00 205 $0.00
Pipefitters - APP 70% Overtime $0.00 41 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Pipefitter's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Pipefitter
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Pipefitters - APP 70% Double Time $0.00 20 $0.00
Pipefitters - APP 75% Regular $0.00 205 $0.00
Pipefitters - APP 75% Overtime $0.00 41 $0.00
Pipefitters - APP 75% Double Time $0.00 20 $0.00
Pipefitters - APP 80% Regular $0.00 205 $0.00
Pipefitters - APP 80% Overtime $0.00 41 $0.00
Pipefitters - APP 80% Double Time $0.00 20 $0.00
Pipefitters - APP 85% Regular $0.00 205 $0.00
Pipefitters - APP 85% Overtime $0.00 41 $0.00
Pipefitters - APP 85% Double Time $0.00 20 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE
and will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Pipefitter
Pipefitters - Gen Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Gen Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Gen Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Gen Foreman 25% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Gen Foreman 25% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Gen Foreman 25% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters-Foreman 15% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters-Foreman 15% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters-Foreman 15% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Foreman 10% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Foreman 10% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Foreman 10% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 45% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 45% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 45% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 50% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 50% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 50% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 55% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 55% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 55% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Pipefitter's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Pipefitter
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Pipefitter's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Pipefitters - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Pipefitters - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Teamster's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Teamster
Teamsters -Group 1 GF Regular $0.00 154 $0.00
Teamsters -Group 1 GF Overtime $0.00 30 $0.00
Teamsters -Group 1 GF Double Time $0.00 15 $0.00
Teamsters- Group 1 FM Regular $0.00 154 $0.00
Teamsters- Group 1 FM Overtime $0.00 30 $0.00
Teamsters- Group 1 FM Double Time $0.00 15 $0.00
Teamsters - Group 1 JM Regular $0.00 1238 $0.00
Teamsters - Group 1 JM Overtime $0.00 247 $0.00
Teamsters - Group 1 JM Double Time $0.00 123 $0.00
Teamsters - Group 2 GF Regular $0.00 51 $0.00
Teamsters - Group 2 GF Overtime $0.00 10 $0.00
Teamsters - Group 2 GF Double Time $0.00 5 $0.00
Teamsters - Group 2 FM Regular $0.00 51 $0.00
Teamsters - Group 2 FM Overtime $0.00 10 $0.00
Teamsters - Group 2 FM Double Time $0.00 5 $0.00
Teamsters - Group 2 JM Regular $0.00 1238 $0.00
Teamsters - Group 2 JM Overtime $0.00 247 $0.00
Teamsters - Group 2 JM Double Time $0.00 123 $0.00
Teamsters - Group 3 GF Regular $0.00 51 $0.00
Teamsters - Group 3 GF Overtime $0.00 10 $0.00
Teamsters - Group 3 GF Double Time $0.00 5 $0.00
Teamsters - Group 3 FM Regular $0.00 51 $0.00
Teamsters - Group 3 FM Overtime $0.00 10 $0.00
Teamsters - Group 3 FM Double Time $0.00 5 $0.00
Teamsters - Group 3 JM Regular $0.00 412 $0.00
Teamsters - Group 3 JM Overtime $0.00 82 $0.00
Teamsters - Group 3 JM Double Time $0.00 41 $0.00
Teamsters - Group 4 GF Regular $0.00 51 $0.00
Teamsters - Group 4 GF Overtime $0.00 10 $0.00
Teamsters - Group 4 GF Double Time $0.00 5 $0.00
Teamsters - Group 4 FM Regular $0.00 51 $0.00
Teamsters - Group 4 FM Overtime $0.00 10 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 3
Teamster's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Teamster
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Teamsters - Group 4 FM Double Time $0.00 5 $0.00
Teamsters - Group 4 JM Regular $0.00 412 $0.00
Teamsters - Group 4 JM Overtime $0.00 82 $0.00
Teamsters - Group 4 JM Double Time $0.00 41 $0.00
Teamsters - Group 5 GF Regular $0.00 258 $0.00
Teamsters - Group 5 GF Overtime $0.00 51 $0.00
Teamsters - Group 5 GF Double Time $0.00 25 $0.00
Teamsters - Group 5 FM Regular $0.00 258 $0.00
Teamsters - Group 5 FM Overtime $0.00 51 $0.00
Teamsters - Group 5 FM Double Time $0.00 25 $0.00
Teamsters - Group 5 JM Regular $0.00 2064 $0.00
Teamsters - Group 5 JM Overtime $0.00 412 $0.00
Teamsters - Group 5 JM Double Time $0.00 206 $0.00
Teamsters -Group 6 GF Regular $0.00 103 $0.00
Teamsters -Group 6 GF Overtime $0.00 20 $0.00
Teamsters -Group 6 GF Double Time $0.00 10 $0.00
Teamsters- Group 6 FM Regular $0.00 103 $0.00
Teamsters- Group 6 FM Overtime $0.00 20 $0.00
Teamsters- Group 6 FM Double Time $0.00 10 $0.00
Teamsters - Group 6 JM Regular $0.00 825 $0.00
Teamsters - Group 6 JM Overtime $0.00 165 $0.00
Teamsters - Group 6 JM Double Time $0.00 82 $0.00
Teamsters - Group 7 GF Regular $0.00 258 $0.00
Teamsters - Group 7 GF Overtime $0.00 51 $0.00
Teamsters - Group 7 GF Double Time $0.00 25 $0.00
Teamsters - Group 7 FM Regular $0.00 41 $0.00
Teamsters - Group 7 FM Overtime $0.00 8 $0.00
Teamsters - Group 7 FM Double Time $0.00 4 $0.00
Teamsters - Group 7 JM Regular $0.00 330 $0.00
Teamsters - Group 7 JM Overtime $0.00 66 $0.00
Teamsters - Group 7 JM Double Time $0.00 33 $0.00
Teamsters - Group 8 GF Regular $0.00 41 $0.00
Page 2 of 3
Teamster's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Teamster
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Teamsters - Group 8 GF Overtime $0.00 8 $0.00
Teamsters - Group 8 GF Double Time $0.00 4 $0.00
Teamsters - Group 8 FM Regular $0.00 41 $0.00
Teamsters - Group 8 FM Overtime $0.00 8 $0.00
Teamsters - Group 8 FM Double Time $0.00 4 $0.00
Teamsters - Group 8 JM Regular $0.00 330 $0.00
Teamsters - Group 8 JM Overtime $0.00 66 $0.00
Teamsters - Group 8 JM Double Time $0.00 33 $0.00
Teamsters APP 70% Regular $0.00 206 $0.00
Teamsters APP 70% Overtime $0.00 41 $0.00
Teamsters APP 70% Double Time $0.00 20 $0.00
Teamsters APP 80% Regular $0.00 206 $0.00
Teamsters APP 80% Overtime $0.00 41 $0.00
Teamsters APP 80% Double Time $0.00 20 $0.00
Teamsters APP 90% Regular $0.00 206 $0.00
Teamsters APP 90% Overtime $0.00 41 $0.00
Teamsters APP 90% Double Time $0.00 20 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
Page 3 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Teamster
Teamsters -Group 1 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters -Group 1 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters -Group 1 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters- Group 1 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters- Group 1 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters- Group 1 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 1 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 1 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 1 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 2 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 3 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 4 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Teamster's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Teamster
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Teamster's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Teamsters - Group 5 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 5 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters -Group 6 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters -Group 6 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters -Group 6 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters- Group 6 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters- Group 6 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters- Group 6 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 6 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 6 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 6 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 7 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters - Group 8 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Page 2 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Teamster
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Teamster's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Teamsters APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Teamsters APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 3 of 3
Ironworker's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Ironworker
Ironworkers- Gen Foreman Regular $0.00 669 $0.00
Ironworkers- Gen Foreman Overtime $0.00 133 $0.00
Ironworkers- Gen Foreman Double Time $0.00 66 $0.00
Ironworkers-Foreman Regular $0.00 1672 $0.00
Ironworkers-Foreman Overtime $0.00 334 $0.00
Ironworkers-Foreman Double Time $0.00 167 $0.00
Ironworkers-Journeyman Regular $0.00 3345 $0.00
Ironworkers-Journeyman Overtime $0.00 669 $0.00
Ironworkers-Journeyman Double Time $0.00 334 $0.00
Ironworkers - APP-1 65% Regular $0.00 66 $0.00
Ironworkers - APP-1 65% Overtime $0.00 13 $0.00
Ironworkers - APP-1 65% Double Time $0.00 6 $0.00
Ironworkers - APP-2 70% Regular $0.00 133 $0.00
Ironworkers - APP-2 70% Overtime $0.00 26 $0.00
Ironworkers - APP-2 70% Double Time $0.00 13 $0.00
Ironworkers - APP-3 75% Regular $0.00 133 $0.00
Ironworkers - APP-3 75% Overtime $0.00 26 $0.00
Ironworkers - APP-3 75% Double Time $0.00 13 $0.00
Ironworkers - APP-4 80% Regular $0.00 133 $0.00
Ironworkers - APP-4 80% Overtime $0.00 26 $0.00
Ironworkers - APP-4 80% Double Time $0.00 13 $0.00
Ironworkers - APP-5 90% Regular $0.00 133 $0.00
Ironworkers - APP-5 90% Overtime $0.00 26 $0.00
Ironworkers - APP-5 90% Double Time $0.00 13 $0.00
Ironworkers - APP-6 90% Regular $0.00 133 $0.00
Ironworkers - APP-6 90% Overtime $0.00 26 $0.00
Ironworkers - APP-6 90% Double Time $0.00 13 $0.00
Ironworkers - APP-7 95% Regular $0.00 133 $0.00
Ironworkers - APP-7 95% Overtime $0.00 26 $0.00
Ironworkers - APP-7 95% Double Time $0.00 13 $0.00
Ironworkers - APP-8 95% Regular $0.00 133 $0.00
Ironworkers - APP-8 95% Overtime $0.00 26 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Ironworker's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Ironworker
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Ironworkers - APP-8 95% Double Time $0.00 13 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Ironworker
Ironworkers- Gen Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers- Gen Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers- Gen Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers-Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-1 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-1 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-1 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-2 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-2 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-2 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-3 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-3 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-3 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-4 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-4 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-4 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-5 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-5 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-5 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-6 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-6 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-6 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-7 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-7 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-7 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-8 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-8 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Ironworkers - APP-8 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Ironworker's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Ironworker
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Ironworker's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Operator's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Operator
Operators -Group 1 GF Regular $0.00 34 $0.00
Operators -Group 1 GF Overtime $0.00 6 $0.00
Operators -Group 1 GF Double Time $0.00 3 $0.00
Operators- Group 1 FM Regular $0.00 34 $0.00
Operators- Group 1 FM Overtime $0.00 6 $0.00
Operators- Group 1 FM Double Time $0.00 3 $0.00
Operators - Group 1 JM Regular $0.00 276 $0.00
Operators - Group 1 JM Overtime $0.00 55 $0.00
Operators - Group 1 JM Double Time $0.00 27 $0.00
Operators - Group 2 GF Regular $0.00 34 $0.00
Operators - Group 2 GF Overtime $0.00 6 $0.00
Operators - Group 2 GF Double Time $0.00 3 $0.00
Operators - Group 2 FM Regular $0.00 34 $0.00
Operators - Group 2 FM Overtime $0.00 6 $0.00
Operators - Group 2 FM Double Time $0.00 3 $0.00
Operators - Group 2 JM Regular $0.00 276 $0.00
Operators - Group 2 JM Overtime $0.00 55 $0.00
Operators - Group 2 JM Double Time $0.00 27 $0.00
Operators - Group 3 GF Regular $0.00 34 $0.00
Operators - Group 3 GF Overtime $0.00 6 $0.00
Operators - Group 3 GF Double Time $0.00 3 $0.00
Operators - Group 3 FM Regular $0.00 34 $0.00
Operators - Group 3 FM Overtime $0.00 6 $0.00
Operators - Group 3 FM Double Time $0.00 3 $0.00
Operators - Group 3 JM Regular $0.00 276 $0.00
Operators - Group 3 JM Overtime $0.00 55 $0.00
Operators - Group 3 JM Double Time $0.00 27 $0.00
Operators - Group 4 GF Regular $0.00 34 $0.00
Operators - Group 4 GF Overtime $0.00 6 $0.00
Operators - Group 4 GF Double Time $0.00 3 $0.00
Operators - Group 4 FM Regular $0.00 34 $0.00
Operators - Group 4 FM Overtime $0.00 6 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 3
Operator's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Operator
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Operators - Group 4 FM Double Time $0.00 3 $0.00
Operators - Group 4 JM Regular $0.00 276 $0.00
Operators - Group 4 JM Overtime $0.00 55 $0.00
Operators - Group 4 JM Double Time $0.00 27 $0.00
Operators - Group 5 GF Regular $0.00 69 $0.00
Operators - Group 5 GF Overtime $0.00 13 $0.00
Operators - Group 5 GF Double Time $0.00 6 $0.00
Operators - Group 5 FM Regular $0.00 69 $0.00
Operators - Group 5 FM Overtime $0.00 13 $0.00
Operators - Group 5 FM Double Time $0.00 6 $0.00
Operators - Group 5 JM Regular $0.00 552 $0.00
Operators - Group 5 JM Overtime $0.00 110 $0.00
Operators - Group 5 JM Double Time $0.00 55 $0.00
Operators - Group 6 GF Regular $0.00 207 $0.00
Operators - Group 6 GF Overtime $0.00 41 $0.00
Operators - Group 6 GF Double Time $0.00 20 $0.00
Operators - Group 6 FM Regular $0.00 207 $0.00
Operators - Group 6 FM Overtime $0.00 41 $0.00
Operators - Group 6 FM Double Time $0.00 20 $0.00
Operators - Group 6 JM Regular $0.00 1656 $0.00
Operators - Group 6 JM Overtime $0.00 331 $0.00
Operators - Group 6 JM Double Time $0.00 165 $0.00
Operators - Group 7 GF Regular $0.00 103 $0.00
Operators - Group 7 GF Overtime $0.00 20 $0.00
Operators - Group 7 GF Double Time $0.00 10 $0.00
Operators - Group 7 FM Regular $0.00 69 $0.00
Operators - Group 7 FM Overtime $0.00 13 $0.00
Operators - Group 7 FM Double Time $0.00 6 $0.00
Operators - Group 7 JM Regular $0.00 552 $0.00
Operators - Group 7 JM Overtime $0.00 110 $0.00
Operators - Group 7 JM Double Time $0.00 55 $0.00
Operators - Group 8 GF Regular $0.00 69 $0.00
Page 2 of 3
Operator's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Operator
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Operators - Group 8 GF Overtime $0.00 13 $0.00
Operators - Group 8 GF Double Time $0.00 6 $0.00
Operators - Group 8 FM Regular $0.00 69 $0.00
Operators - Group 8 FM Overtime $0.00 13 $0.00
Operators - Group 8 FM Double Time $0.00 6 $0.00
Operators - Group 8 JM Regular $0.00 552 $0.00
Operators - Group 8 JM Overtime $0.00 110 $0.00
Operators - Group 8 JM Double Time $0.00 55 $0.00
Operators - APP 65% Regular $0.00 138 $0.00
Operators - APP 65% Overtime $0.00 27 $0.00
Operators - APP 65% Double Time $0.00 13 $0.00
Operators - APP 70% Regular $0.00 138 $0.00
Operators - APP 70% Overtime $0.00 27 $0.00
Operators - APP 70% Double Time $0.00 13 $0.00
Operators - APP 75% Regular $0.00 138 $0.00
Operators - APP 75% Overtime $0.00 27 $0.00
Operators - APP 75% Double Time $0.00 13 $0.00
Operators - APP 80% Regular $0.00 207 $0.00
Operators - APP 80% Overtime $0.00 41 $0.00
Operators - APP 80% Double Time $0.00 20 $0.00
Operators - APP 85% Regular $0.00 207 $0.00
Operators - APP 85% Overtime $0.00 41 $0.00
Operators - APP 85% Double Time $0.00 20 $0.00
Operators - APP 90% Regular $0.00 207 $0.00
Operators - APP 90% Overtime $0.00 41 $0.00
Operators - APP 90% Double Time $0.00 20 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE
and will be utilized for release costs.
Page 3 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Operators
Operators -Group 1 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators -Group 1 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators -Group 1 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators- Group 1 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators- Group 1 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators- Group 1 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 1 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 1 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 1 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 2 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 3 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 4 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
[1]
Subtotal
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Operator's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Operators
[1]
Subtotal
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Operator's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Operators - Group 5 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 5 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 6 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 7 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - Group 8 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Page 2 of 3
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Operators
[1]
Subtotal
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Operator's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Operators - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Operators - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 3 of 3
Carpenter's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Carpenter
Carpenter- Gen Foreman Regular $0.00 669 $0.00
Carpenter- Gen Foreman Overtime $0.00 133 $0.00
Carpenter- Gen Foreman Double Time $0.00 66 $0.00
Carpenter-Foreman Regular $0.00 1672 $0.00
Carpenter-Foreman Overtime $0.00 334 $0.00
Carpenter-Foreman Double Time $0.00 167 $0.00
Carpenter-Journeyman Regular $0.00 3345 $0.00
Carpenter-Journeyman Overtime $0.00 669 $0.00
Carpenter-Journeyman Double Time $0.00 334 $0.00
Carpenter - APP 60% Regular $0.00 66 $0.00
Carpenter - APP 60% Overtime $0.00 13 $0.00
Carpenter - APP 60% Double Time $0.00 6 $0.00
Carpenter - APP 65% Regular $0.00 133 $0.00
Carpenter - APP 65% Overtime $0.00 26 $0.00
Carpenter - APP 65% Double Time $0.00 13 $0.00
Carpenter - APP 70% Regular $0.00 133 $0.00
Carpenter - APP 70% Overtime $0.00 26 $0.00
Carpenter - APP 70% Double Time $0.00 13 $0.00
Carpenter - APP 75% Regular $0.00 133 $0.00
Carpenter - APP 75% Overtime $0.00 26 $0.00
Carpenter - APP 75% Double Time $0.00 13 $0.00
Carpenter - APP 80% Regular $0.00 133 $0.00
Carpenter - APP 80% Overtime $0.00 26 $0.00
Carpenter - APP 80% Double Time $0.00 13 $0.00
Carpenter - APP 85% Regular $0.00 133 $0.00
Carpenter - APP 85% Overtime $0.00 26 $0.00
Carpenter - APP 85% Double Time $0.00 13 $0.00
Carpenter - APP 90% Regular $0.00 133 $0.00
Carpenter - APP 90% Overtime $0.00 26 $0.00
Carpenter - APP 90% Double Time $0.00 13 $0.00
Carpenter - APP 95% Regular $0.00 133 $0.00
Carpenter - APP 95% Overtime $0.00 26 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Carpenter's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Carpenter
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Carpenter - APP 95% Double Time $0.00 13 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Carpenter
Carpenter- Gen Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter- Gen Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter- Gen Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter-Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Carpenter - APP 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rate
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Carpenter Labor Category
(Base Period of Performance)Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Carpenter
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Carpenter Labor Category
(Base Period of Performance)Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
b. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire base period of performance .5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Sheetmetal's Labor Category Rate TypeFully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Sheet Metal
Sheetmetal - Gen Foreman Regular $0.00 535 $0.00
Sheetmetal - Gen Foreman Overtime $0.00 107 $0.00
Sheetmetal - Gen Foreman Double Time $0.00 53 $0.00
Sheetmetal-Foreman Regular $0.00 1124 $0.00
Sheetmetal-Foreman Overtime $0.00 224 $0.00
Sheetmetal-Foreman Double Time $0.00 112 $0.00
Sheetmetal -Journeyman Regular $0.00 2944 $0.00
Sheetmetal -Journeyman Overtime $0.00 588 $0.00
Sheetmetal -Journeyman Double Time $0.00 294 $0.00
Sheetmetal - APP 50% Regular $0.00 107 $0.00
Sheetmetal - APP 50% Overtime $0.00 21 $0.00
Sheetmetal - APP 50% Double Time $0.00 10 $0.00
Sheetmetal - APP 55% Regular $0.00 107 $0.00
Sheetmetal - APP 55% Overtime $0.00 21 $0.00
Sheetmetal - APP 55% Double Time $0.00 10 $0.00
Sheetmetal - APP 60% Regular $0.00 160 $0.00
Sheetmetal - APP 60% Overtime $0.00 32 $0.00
Sheetmetal - APP 60% Double Time $0.00 16 $0.00
Sheetmetal - APP 70% Regular $0.00 107 $0.00
Sheetmetal - APP 70% Overtime $0.00 21 $0.00
Sheetmetal - APP 70% Double Time $0.00 10 $0.00
Sheetmetal - APP 75% Regular $0.00 107 $0.00
Sheetmetal - APP 75% Overtime $0.00 21 $0.00
Sheetmetal - APP 75% Double Time $0.00 10 $0.00
Sheetmetal - APP 85% Regular $0.00 107 $0.00
Sheetmetal - APP 85% Overtime $0.00 21 $0.00
Sheetmetal - APP 85% Double Time $0.00 10 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and will
be utilized for release costs.
Page 1 of 1
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Sheet Metal
Sheetmetal - Gen Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - Gen Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - Gen Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal -Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal -Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal -Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 50% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 50% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 50% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 55% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 55% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 55% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sheetmetal - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Travel Pay (use
200 East)*
$/day
{less Taxes)
SheetMetal's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
[1]
Subtotal
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 1
Insulator's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Insulator
Insulators- Gen Foreman Regular $0.00 401 $0.00
Insulators- Gen Foreman Overtime $0.00 80 $0.00
Insulators- Gen Foreman Double Time $0.00 40 $0.00
Insulators-Foreman Regular $0.00 1003 $0.00
Insulators-Foreman Overtime $0.00 200 $0.00
Insulators-Foreman Double Time $0.00 100 $0.00
Insulators-Journeyman Regular $0.00 2208 $0.00
Insulators-Journeyman Overtime $0.00 441 $0.00
Insulators-Journeyman Double Time $0.00 220 $0.00
Insulators - APP 60% Regular $0.00 80 $0.00
Insulators - APP 60% Overtime $0.00 16 $0.00
Insulators - APP 60% Double Time $0.00 8 $0.00
Insulators - APP 70% Regular $0.00 80 $0.00
Insulators - APP 70% Overtime $0.00 16 $0.00
Insulators - APP 70% Double Time $0.00 8 $0.00
Insulators - APP 80% Regular $0.00 120 $0.00
Insulators - APP 80% Overtime $0.00 24 $0.00
Insulators - APP 80% Double Time $0.00 12 $0.00
Insulators - APP 90% Regular $0.00 120 $0.00
Insulators - APP 90% Overtime $0.00 24 $0.00
Insulators - APP 90% Double Time $0.00 12 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 1 of 1
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Insulator
Insulators- Gen Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators- Gen Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators- Gen Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators-Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Insulators - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Insulator's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 1
Cement Mason's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Cement Mason
Cement Mason - Group 1 GF Regular $0.00 44 $0.00
Cement Mason - Group 1 GF Overtime $0.00 8 $0.00
Cement Mason - Group 1 GF Double Time $0.00 4 $0.00
Cement Mason Group 1-FM Regular $0.00 44 $0.00
Cement Mason Group 1-FM Overtime $0.00 8 $0.00
Cement Mason Group 1-FM Double Time $0.00 4 $0.00
Cement Mason Group 1 - JM Regular $0.00 353 $0.00
Cement Mason Group 1 - JM Overtime $0.00 70 $0.00
Cement Mason Group 1 - JM Double Time $0.00 35 $0.00
Cement Mason Group 2 GF Regular $0.00 44 $0.00
Cement Mason Group 2 GF Overtime $0.00 8 $0.00
Cement Mason Group 2 GF Double Time $0.00 4 $0.00
Cement Mason Group 2 FM Regular $0.00 44 $0.00
Cement Mason Group 2 FM Overtime $0.00 8 $0.00
Cement Mason Group 2 FM Double Time $0.00 4 $0.00
Cement Mason Group 2 JM Regular $0.00 353 $0.00
Cement Mason Group 2 JM Overtime $0.00 70 $0.00
Cement Mason Group 2 JM Double Time $0.00 35 $0.00
Cement Mason Group 3 GF Regular $0.00 36 $0.00
Cement Mason Group 3 GF Overtime $0.00 7 $0.00
Cement Mason Group 3 GF Double Time $0.00 3 $0.00
Cement Mason Group 3 FM Regular $0.00 36 $0.00
Cement Mason Group 3 FM Overtime $0.00 7 $0.00
Cement Mason Group 3 FM Double Time $0.00 3 $0.00
Cement Mason Group 3 JM Regular $0.00 294 $0.00
Cement Mason Group 3 JM Overtime $0.00 58 $0.00
Cement Mason Group 3 JM Double Time $0.00 29 $0.00
Cement Mason - APP 60% Regular $0.00 44 $0.00
Cement Mason - APP 60% Overtime $0.00 8 $0.00
Cement Mason - APP 60% Double Time $0.00 4 $0.00
Cement Mason - APP 70% Regular $0.00 58 $0.00
Cement Mason - APP 70% Overtime $0.00 11 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Cement Mason's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Cement Mason - APP 70% Double Time $0.00 5 $0.00
Cement Mason - APP 80% Regular $0.00 58 $0.00
Cement Mason - APP 80% Overtime $0.00 11 $0.00
Cement Mason - APP 80% Double Time $0.00 5 $0.00
Cement Mason - APP 90% Regular $0.00 58 $0.00
Cement Mason - APP 90% Overtime $0.00 11 $0.00
Cement Mason - APP 90% Double Time $0.00 5 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Cement Mason
Cement Mason - Group 1 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - Group 1 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - Group 1 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 1-FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 1-FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 1-FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 1 - JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 1 - JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 1 - JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 2 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 FM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 FM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 FM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason Group 3 JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Cement Mason - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
[1]
Subtotal
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Cement Mason Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Cement Mason
[1]
Subtotal
Travel Pay (use
200 East)*
$/day
{less Taxes)
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Cement Mason Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:
1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Millwright's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Millwright
Millwrights- Gen Foreman Regular $0.00 133 $0.00
Millwrights- Gen Foreman Overtime $0.00 26 $0.00
Millwrights- Gen Foreman Double Time $0.00 13 $0.00
Millwrights-Foreman Regular $0.00 334 $0.00
Millwrights-Foreman Overtime $0.00 66 $0.00
Millwrights-Foreman Double Time $0.00 33 $0.00
Millwrights-Journeyman Regular $0.00 669 $0.00
Millwrights-Journeyman Overtime $0.00 133 $0.00
Millwrights-Journeyman Double Time $0.00 66 $0.00
Millwrights - APP 60% Regular $0.00 13 $0.00
Millwrights - APP 60% Overtime $0.00 2 $0.00
Millwrights - APP 60% Double Time $0.00 1 $0.00
Millwrights - APP 65% Regular $0.00 26 $0.00
Millwrights - APP 65% Overtime $0.00 5 $0.00
Millwrights - APP 65% Double Time $0.00 2 $0.00
Millwrights - APP 70% Regular $0.00 26 $0.00
Millwrights - APP 70% Overtime $0.00 5 $0.00
Millwrights - APP 70% Double Time $0.00 2 $0.00
Millwrights - APP 75% Regular $0.00 26 $0.00
Millwrights - APP 75% Overtime $0.00 5 $0.00
Millwrights - APP 75% Double Time $0.00 2 $0.00
Millwrights - APP 80% Regular $0.00 26 $0.00
Millwrights - APP 80% Overtime $0.00 5 $0.00
Millwrights - APP 80% Double Time $0.00 2 $0.00
Millwrights - APP 85% Regular $0.00 26 $0.00
Millwrights - APP 85% Overtime $0.00 5 $0.00
Millwrights - APP 85% Double Time $0.00 2 $0.00
Millwrights - APP 90% Regular $0.00 26 $0.00
Millwrights - APP 90% Overtime $0.00 5 $0.00
Millwrights - APP 90% Double Time $0.00 2 $0.00
Millwrights - APP 95% Regular $0.00 26 $0.00
Millwrights - APP 95% Overtime $0.00 5 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Millwright's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Millwright
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Millwrights - APP 95% Double Time $0.00 2 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Millwright
Millwrights- Gen Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights- Gen Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights- Gen Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights-Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Millwrights - APP 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Millwright Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Millwright
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Millwright Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Painter's & Finisher's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Painter
Painters- Foreman Regular $0.00 321 $0.00
Painters- Foreman Overtime $0.00 64 $0.00
Painters- Foreman Double Time $0.00 32 $0.00
Painters - JM Regular $0.00 869 $0.00
Painters - JM Overtime $0.00 173 $0.00
Painters - JM Double Time $0.00 86 $0.00
Painters - APP 55% Regular $0.00 13 $0.00
Painters - APP 55% Overtime $0.00 2 $0.00
Painters - APP 55% Double Time $0.00 1 $0.00
Painters - APP 60% Regular $0.00 26 $0.00
Painters - APP 60% Overtime $0.00 5 $0.00
Painters - APP 60% Double Time $0.00 2 $0.00
Painters - APP 65% Regular $0.00 26 $0.00
Painters - APP 65% Overtime $0.00 5 $0.00
Painters - APP 65% Double Time $0.00 2 $0.00
Painters - APP 70% Regular $0.00 26 $0.00
Painters - APP 70% Overtime $0.00 5 $0.00
Painters - APP 70% Double Time $0.00 2 $0.00
Painters - APP 80% Regular $0.00 26 $0.00
Painters - APP 80% Overtime $0.00 5 $0.00
Painters - APP 80% Double Time $0.00 2 $0.00
Painters - APP 90% Regular $0.00 26 $0.00
Painters - APP 90% Overtime $0.00 5 $0.00
Painters - APP 90% Double Time $0.00 2 $0.00
Subtotal $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Painter's & Finisher's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Finisher
Drywall Finisher- Foreman Regular $0.00 484 $0.00
Drywall Finisher- Foreman Overtime $0.00 96 $0.00
Drywall Finisher - Foreman Double Time $0.00 48 $0.00
Drywall Finisher - JM Regular $0.00 1313 $0.00
Drywall Finisher - JM Overtime $0.00 262 $0.00
Drywall Finisher - JM Double Time $0.00 131 $0.00
Drywall Finisher - APP 60% Regular $0.00 20 $0.00
Drywall Finisher - APP 60% Overtime $0.00 4 $0.00
Drywall Finisher - APP 60% Double Time $0.00 2 $0.00
Drywall Finisher - APP 65% Regular $0.00 40 $0.00
Drywall Finisher - APP 65% Overtime $0.00 8 $0.00
Drywall Finisher - APP 65% Double Time $0.00 4 $0.00
Drywall Finisher - APP 70% Regular $0.00 40 $0.00
Drywall Finisher - APP 70% Overtime $0.00 8 $0.00
Drywall Finisher - APP 70% Double Time $0.00 4 $0.00
Drywall Finisher - APP 75% Regular $0.00 40 $0.00
Drywall Finisher - APP 75% Overtime $0.00 8 $0.00
Drywall Finisher - APP 75% Double Time $0.00 4 $0.00
Drywall Finisher - APP 85% Regular $0.00 40 $0.00
Drywall Finisher - APP 85% Overtime $0.00 8 $0.00
Drywall Finisher - APP 85% Double Time $0.00 4 $0.00
Drywall Finisher - APP 90% Regular $0.00 40 $0.00
Drywall Finisher - APP 90% Overtime $0.00 8 $0.00
Drywall Finisher - APP 90% Double Time $0.00 4 $0.00
Subtotal $0.00
Grand Total $0.00 $0.00Notes for Painters & Finishers:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
PainterPainters- Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters- Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters- Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 55% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 55% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 55% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Painter's & Finisher'sLabor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Painter
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Painter's & Finisher'sLabor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
FinisherDrywall Finisher- Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher- Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 65% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 65% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 65% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Drywall Finisher - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Painters ‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate) Finishers ‐$
Notes for Painters and Finishers: ‐$
1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Bricklayer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Bricklayer
Bricklayers Foreman Regular $0.00 321 $0.00
Bricklayers Foreman Overtime $0.00 64 $0.00
Bricklayers Foreman Double Time $0.00 32 $0.00
Bricklayers-Journeyman Regular $0.00 869 $0.00
Bricklayers-Journeyman Overtime $0.00 173 $0.00
Bricklayers-Journeyman Double Time $0.00 86 $0.00
Bricklayers-Apprentice 50% Regular $0.00 13 $0.00
Bricklayers-Apprentice 50% Overtime $0.00 2 $0.00
Bricklayers-Apprentice 50% Double Time $0.00 1 $0.00
Bricklayers-Apprentice 55% Regular $0.00 26 $0.00
Bricklayers-Apprentice 55% Overtime $0.00 5 $0.00
Bricklayers-Apprentice 55% Double Time $0.00 2 $0.00
Bricklayers-Apprentice 60% Regular $0.00 26 $0.00
Bricklayers-Apprentice 60% Overtime $0.00 5 $0.00
Bricklayers-Apprentice 60% Double Time $0.00 2 $0.00
Bricklayers-Apprentice 70% Regular $0.00 26 $0.00
Bricklayers-Apprentice 70% Overtime $0.00 5 $0.00
Bricklayers-Apprentice 70% Double Time $0.00 2 $0.00
Bricklayers-Apprentice 80% Regular $0.00 26 $0.00
Bricklayers-Apprentice 80% Overtime $0.00 5 $0.00
Bricklayers-Apprentice 80% Double Time $0.00 2 $0.00
Bricklayers-Apprentice 90% Regular $0.00 26 $0.00
Bricklayers-Apprentice 90% Overtime $0.00 5 $0.00
Bricklayers-Apprentice 90% Double Time $0.00 2 $0.00
Bricklayers-Apprentice 95% Regular $0.00 26 $0.00
Bricklayers-Apprentice 95% Overtime $0.00 5 $0.00
Bricklayers-Apprentice 95% Double Time $0.00 2 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
Page 1 of 2
Bricklayer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Bricklayer
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Bricklayer
Bricklayers Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Journeyman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 50% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 50% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 50% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 55% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 55% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 55% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Bricklayers-Apprentice 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Bricklayer's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 1
Roofer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Roofers
Roofers - Foreman Regular $0.00 321 $0.00
Roofers - Foreman Overtime $0.00 64 $0.00
Roofers - Foreman Double Time $0.00 32 $0.00
Roofers - JM Regular $0.00 869 $0.00
Roofers - JM Overtime $0.00 173 $0.00
Roofers - JM Double Time $0.00 86 $0.00
Roofers - APP 60% Regular $0.00 13 $0.00
Roofers - APP 60% Overtime $0.00 2 $0.00
Roofers - APP 60% Double Time $0.00 1 $0.00
Roofers - APP 70% Regular $0.00 26 $0.00
Roofers - APP 70% Overtime $0.00 5 $0.00
Roofers - APP 70% Double Time $0.00 2 $0.00
Roofers - APP 75% Regular $0.00 26 $0.00
Roofers - APP 75% Overtime $0.00 5 $0.00
Roofers - APP 75% Double Time $0.00 2 $0.00
Roofers - APP 80% Regular $0.00 26 $0.00
Roofers - APP 80% Overtime $0.00 5 $0.00
Roofers - APP 80% Double Time $0.00 2 $0.00
Roofers - APP 85% Regular $0.00 26 $0.00
Roofers - APP 85% Overtime $0.00 5 $0.00
Roofers - APP 85% Double Time $0.00 2 $0.00
Roofers - APP 90% Regular $0.00 26 $0.00
Roofers - APP 90% Overtime $0.00 5 $0.00
Roofers - APP 90% Double Time $0.00 2 $0.00
Roofers - APP 95% Regular $0.00 26 $0.00
Roofers - APP 95% Overtime $0.00 5 $0.00
Roofers - APP 95% Double Time $0.00 2 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Roofer's Labor Category Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Roofers
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Roofers
Roofers - Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 60% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 60% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 60% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Roofers - APP 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Roofer's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 1
Sprinkler Fitter's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Sprinkler Fitter
Sprinkler Fitters - GF Regular $0.00 33 $0.00
Sprinkler Fitters - GF Overtime $0.00 6 $0.00
Sprinkler Fitters - GF Double Time $0.00 3 $0.00
Sprinkler Fitters-Foreman Regular $0.00 66 $0.00
Sprinkler Fitters-Foreman Overtime $0.00 13 $0.00
Sprinkler Fitters-Foreman Double Time $0.00 6 $0.00
Sprinkler Fitters -JM Regular $0.00 301 $0.00
Sprinkler Fitters -JM Overtime $0.00 60 $0.00
Sprinkler Fitters -JM Double Time $0.00 30 $0.00
Sprinkler Fitters APP Class 1 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 1 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 1 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 2 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 2 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 2 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 3 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 3 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 3 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 4 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 4 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 4 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 5 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 5 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 5 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 6 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 6 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 6 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 7 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 7 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 7 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 8 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 8 Overtime $0.00 5 $0.00
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Page 1 of 2
Sprinkler Fitter's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Sprinkler Fitter
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
Sprinkler Fitters APP Class 8 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 9 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 9 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 9 Double Time $0.00 2 $0.00
Sprinkler Fitters APP Class 10 Regular $0.00 26 $0.00
Sprinkler Fitters APP Class 10 Overtime $0.00 5 $0.00
Sprinkler Fitters APP Class 10 Double Time $0.00 2 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Sprinkler Fitter
Sprinkler Fitters - GF Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters - GF Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters - GF Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters -JM Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters -JM Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters -JM Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 1 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 1 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 1 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 2 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 2 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 2 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 3 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 3 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 3 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 4 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 4 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 4 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 5 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 5 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 5 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 6 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 6 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 6 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 7 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 7 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 7 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 8 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 8 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 8 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 9 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 9 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 9 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 10 Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 10 Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Sprinkler Fitters APP Class 10 Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Travel Pay (use
200 East)*
$/day
{less Taxes)
Sprinkler FitterLabor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
Page 1 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Sprinkler Fitter
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Travel Pay (use
200 East)*
$/day
{less Taxes)
Sprinkler FitterLabor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Small Tools Expendables Adder Calculated on Base Rate
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Page 2 of 2
Boilermaker's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Boilermaker
Boilermaker-Foreman Regular $0.00 132 $0.00
Boilermaker-Foreman Overtime $0.00 26 $0.00
Boilermaker-Foreman Double Time $0.00 13 $0.00
Boilermaker Asst-Foreman Regular $0.00 79 $0.00
Boilermaker Asst-Foreman Overtime $0.00 15 $0.00
Boilermaker Asst-Foreman Double Time $0.00 7 $0.00
Boilermaker-Journeyman Regular $0.00 1660 $0.00
Boilermaker-Journeyman Overtime $0.00 332 $0.00
Boilermaker-Journeyman Double Time $0.00 66 $0.00
Boilermaker-Apprentice 70% Regular $0.00 33 $0.00
Boilermaker-Apprentice 70% Overtime $0.00 19 $0.00
Boilermaker-Apprentice 70% Double Time $0.00 3 $0.00
Boilermaker-Apprentice 75% Regular $0.00 1 $0.00
Boilermaker-Apprentice 75% Overtime $0.00 19 $0.00
Boilermaker-Apprentice 75% Double Time $0.00 3 $0.00
Boilermaker-Apprentice 80% Regular $0.00 1 $0.00
Boilermaker-Apprentice 80% Overtime $0.00 19 $0.00
Boilermaker-Apprentice 80% Double Time $0.00 3 $0.00
Boilermaker-Apprentice 85% Regular $0.00 1 $0.00
Boilermaker-Apprentice 85% Overtime $0.00 19 $0.00
Boilermaker-Apprentice 85% Double Time $0.00 3 $0.00
Boilermaker-Apprentice 90% Regular $0.00 1 $0.00
Boilermaker-Apprentice 90% Overtime $0.00 19 $0.00
Boilermaker-Apprentice 90% Double Time $0.00 3 $0.00
Boilermaker-Apprentice 95% Regular $0.00 19 $0.00
Boilermaker-Apprentice 95% Overtime $0.00 3 $0.00
Boilermaker-Apprentice 95% Double Time $0.00 1 $0.00
Total $0.00 $0.00
Notes:1. Do not change the estimated hours.
2. Estimated hours for cost proposal only (actual hours to be established in each release).
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
3. Hourly rates (from rates worksheet) are established for the entire BASE PERIOD OF PERFORMANCE and
Page 1 of 2
Boilermaker's Labor Category
Rate Type
Fully Burdened Rate (from S/C Rate Sheets)
Estimated Hours
Total
Boilermaker
SCHEDULE A BASE PERIOD OF PERFORMANCE LABOR COST ESTIMATE SUMMARY
will be utilized for release costs.
Page 2 of 2
Tools and
Expendables %
Tools and
Expendables
$/hr.
Overhead/
G&A
%
[2] Overhead
/
G&A
(% [1])
$/hr.
[3]
Profit %
[4]
Profit
([1]+[2])[3]
$/hr.
Boilermaker
Boilermaker-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker Asst-Foreman Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker Asst-Foreman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker Asst-Foreman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Journeyman Standard 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Journeyman Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Journeyman Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 70% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 70% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 70% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 75% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 75% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 75% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 80% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 80% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 80% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 85% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 85% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 85% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 90% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 90% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 90% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 95% Regular 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 95% Overtime ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
Boilermaker-Apprentice 95% Double Time ‐$ 0.000% ‐$ ‐$ 0.000% ‐$ 0.000% ‐$ ‐$ 22.00$
‐$
* See HSSA for travel pay for other locations (travel pay not included for proposal estimate)
Notes:1. SUBCONTRACTOR to provide separate worksheets showing hourly adder buildup details:
a. Allowance Rateb. Overhead Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)c. Small Tools and Expendables Rate (Enter percentage in BASE POP Summary Cost Estimate Sheet)
2. SUBCONTRACTOR to complete "Base Rate" and "Allowances," columns in addition to percentage in accordance with Note 1 and 5.
3. Groups omitted are not expected to be utilized (will be added by change if identified in future releases)4. Hourly rates are established for the entire BASE PERIOD OF PERFORMANCE.
5. Profit must be the same % for all craft categories (Enter percentage in BASE POP Summary Cost Estimate Sheet)
Travel Pay (use
200 East)*
$/day
{less Taxes)
[1]
Subtotal
Fully Burdened Rate
[1]+[2]+[4] $/hr.
Boilermaker's Labor Category
(BASE PERIOD OF PERFORMANCE)
Rate Type Base Rate $/hr.
Allowance
(Payroll
Taxes/Fringe
Benefits) $/hr.
Calculated on Base RateSmall Tools Expendables Adder
Page 1 of 1