• Introduction of LP Bypass system

• Overview of LP Bypass

• System details and lay out

• Control scheme of LP bypass system•  

Page 3: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 3/40

May 24, 2012 PMI Revision 00  3

• LP bypass bypasses steam to IPT & LPT & maintain flow

through RH.

Function of LP bypass:-1. To monitor the pressure in reheat system and to control it

under certain operating condition.

2. The volume of steam not utilized by the IPT & LPT during

start up & shut down must pass through condenser.

Page 4: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 4/40

May 24, 2012 PMI Revision 00  4

 LP Bypass system provide a very effective means of controlling reheat –steam flow during

LP BYPASS SYSTEM

Page 5: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 5/40

May 24, 2012 PMI Revision 00  5

It enhances fast starting capability of turbines from allinitial conditions e.g.

Cold condition

Warm condition

Hot Condition

Page 6: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 6/40

May 24, 2012 6

LP steam-bypass system operates in parallel with theturbine

Protects Condenser from excessive temperature andpressure that could result from sudden injection of 

superheated steam

Page 7: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 7/40

May 24, 2012 PMI Revision 00  7

LP BYPASS SYSTEM

Page 8: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 8/40

May 24, 2012 PMI Revision 00  8

Upon receiving load rejection signal from electricalsystem:

Page 9: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 9/40

May 24, 2012 PMI Revision 00  9

Page 10: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 10/40

May 24, 2012 PMI Revision 00  10

• If LP steam- bypass system fails or the

condenser cannot accept LP bypass

steam , Safety Valves open and dump

steam to atmosphere

Page 11: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 11/40

May 24, 2012 PMI Revision 00  11

Page 12: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 12/40

May 24, 2012 PMI Revision 00  12

Page 13: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 13/40

May 24, 2012 PMI Revision 00  13

Page 14: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 14/40

May 24, 2012 PMI Revision 00  14

Page 15: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 15/40

May 24, 2012 PMI Revision 00  15

• Set point formation

• Pressure control for LP bypass system

• LP bypass HYDRAULIC System• Protection system

Page 16: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 16/40

May 24, 2012 PMI Revision 00  16

Control scheme

Page 17: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 17/40

May 24, 2012 PMI Revision 00  17

Set Value formation

The Two set values – fixed and variable are formed for theLPBypass control system

set value to be used is determined by a maximum valueselector

For the formation of variable set point, a pressuretransducer is used to measure the steam pressure in HPturbine

Page 18: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 18/40

May 24, 2012 PMI Revision 00  18

Page 19: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 19/40

May 24, 2012 PMI Revision 00  19

LP Bypass System

Page 20: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 20/40

May 24, 2012 PMI Revision 00  20

Features of LPBP Controller 

• LPBP controller maintains pressure after reheater 

by controlling LP bypass valves

• It acts on the coil of the LPBP E-H converter to

position the control valves.

• Two setpoints, fixed and variable are used in

maximum selection circuit

• Variable setpoint is derived from HP first stage

pressure

• Water spray is in two stages depending on steam

flow through LPBP stations.

• LPBP valves cannot open until adequate spray

water pressure and required vacuum is there and

condenser wall temp is not high.

• Valves can also be operated manually

Page 21: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 21/40

May 24, 2012 PMI Revision 00  21

LP BYPASS SETPOINTS

Page 22: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 22/40

May 24, 2012 PMI Revision 00  22

 Hydraulic Mode of Operation

Page 23: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 23/40

May 24, 2012 PMI Revision 00  23

 Hydraulic Mode of Operation

Page 24: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 24/40

May 24, 2012 PMI Revision 00  24

Design of LPBypass Valves for 210 MW

Steam Turbine

• Controlled by 8bar mineral oil

Page 25: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 25/40

Page 26: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 26/40

May 24, 2012 PMI Revision 00  26

Protection Devices

Page 27: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 27/40

May 24, 2012 PMI Revision 00  27

Protection Devices cause closure of 

bypass station in case of following

eventualities

Page 28: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 28/40

May 24, 2012 PMI Revision 00  28

Page 29: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 29/40

May 24, 2012 PMI Revision 00  29

CURVE FOR LPBYPASS

CONTROLLER

Page 30: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 30/40

May 24, 2012 PMI Revision 00  30

Page 31: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 31/40

May 24, 2012 PMI Revision 00  31

Page 32: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 32/40

May 24, 2012 PMI Revision 00  32

Actuator Bypass

Stop Valve

Page 33: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 33/40

May 24, 2012 PMI Revision 00  33

ActuatorLPBPCV

500 MW

Page 34: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 34/40

May 24, 2012 PMI Revision 00  34

Pilot valve

for Water 

Injection Valve

Page 35: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 35/40

May 24, 2012 PMI Revision 00  35

Water 

InjectionValve

Page 36: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 36/40

May 24, 2012 PMI Revision 00  36

Combined Bypass

Stop & Control

Valve 210 MW

Feedback for Pilot valve of

Page 37: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 37/40

May 24, 2012 PMI Revision 00  37

Feedback for Pilot valve of Bypass Control Valve 210 MW

Page 38: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 38/40

May 24, 2012 PMI Revision 00  38

Page 39: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 39/40

Page 40: 08LPbypass _Std

7/31/2019 08LPbypass _Std

http://slidepdf.com/reader/full/08lpbypass-std 40/40

M 24 2012 PMI R i i 00 40