082012 Portfolio

13
Existing 72 acre brownfield in Nashville, TN. Competition sponsored by the local Design Center. Their program called for including sports facilities (to encourage healthy living), multi-use, and strengthened connections. This site is highly flood-prone. Almost all of it was under water in the 2010 flood.

Transcript of 082012 Portfolio

Page 1: 082012 Portfolio

Existing 72 acre brownfield in Nashville, TN. Competition sponsored by the local Design Center. Their program called for including sports facilities (to encourage healthy living), multi-use, and strengthened connections. This site is highly flood-prone. Almost all of it was under water in the 2010 flood.

Page 2: 082012 Portfolio
Page 3: 082012 Portfolio
Page 4: 082012 Portfolio
Page 5: 082012 Portfolio
Page 6: 082012 Portfolio
Page 7: 082012 Portfolio
Page 8: 082012 Portfolio

M A S T E R P L A N N I N G &

L A N D D E V E L O P M E N T

Design Research and Extension Program

With Community Growth Strategies Group

Co-lead the effort to develop the American Tobacco

Trail Master Plan for Chatham County Parks and

Recreation.

• Research and analysis including:-feasibility studies,

-design requirements,

-safety and economic impacts,

-potential ecological impacts,

-potential user group conflicts and mitigation

• coordination of meetings and events,

• co-facilitated stakeholder input sessions,

• graphics

Page 9: 082012 Portfolio

M A S T E R P L A N N I N G &

L A N D D E V E L O P M E N T

Design Research and Extension Program

The aim of this project (as well as many others I

participated in with the Design Research Program) was

to assist community members, developers, and Town

leaders in understanding potential impacts of various

development options.

Goose Creek Watershed- Community Visioning Workshop

Page 10: 082012 Portfolio

M A S T E R P L A N N I N G &

L A N D D E V E L O P M E N T

NCSU Greek Village

Stewart Engineering(overall Master Plan conceptual design by Reynolds &

Jewell Landscape Architecture)

Design development of Master Plan, plus design

development and construction documents for Phase 1.

One task in my charge was to “truth test” each phase by

determining (based on the desires of the client) which

houses and what infrastructure would need to be

demolished for each phase, and what gets built. This

necessitated including temporary connections to roads

and parking. Each phase had to be graded in as part of

this exercise.

Page 11: 082012 Portfolio

D E S I G N

Residential/Small Scale

With Reynolds & Jewell

With Stewart Engineering

Page 12: 082012 Portfolio

D E S I G N

With Stewart Engineering

Page 13: 082012 Portfolio

D E S I G N

Stormwater Concepts