07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ......

19
&4#90 $; %*'%-'& $; &#6' (+.' 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 5*''6 6+6.'

Transcript of 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ......

Page 1: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 2: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 3: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

A

C

FREDERICK S. NORMAN

DR

NUMBER 5878R

TSIGE

E E AR

TATS

E OF AL

T

H

CE

I T

BA

AM

A1.48

A1.4

6

1A1.4

P2

P2

P2

P2

P1

P1

CT

CT

A1.4

6

9' -

7 3/

32"

9' -

2 23

/32"

11' - 9 55/64"

3' - 1 63/64"

0' -

7 1/

8"

ACT-1

ACT-1

MOSAIC TILE

CEMENT BOARD

METALSTUD WALL

SEE MECHANICAL PLANSEXISITING WALLS

7A1.4

0' -

2"

0' -

11 1

/2"

0' -

2"

0' - 2"

1' -

4"

0' - 10"

0' -

2"

0' -

7 1/

8"

1' -

2"

ACCESS DOOR

3' - 2"

0' - 2"

Level 333' - 8 1/4"

Level 3.541' - 10 15/16"

7' -

1 1/

4"

MOSAIC TILE

PAINT

6" TILE BASE

0' -

6"6'

- 7

1/4"

(EXISTING TILE)

(EXISTING PAINTED GYP.)

12" X 18" ACCESS DOOR

1' - 0"

1' -

6"

NOTE:ACCESS DOOR NON-RATED RECESSED ACCESS DOORWITH CONCEALED HARDWARE FOR FLUSH INSTALLATION,FINISH: STAINLESS STEEL,

Level 333' - 8 1/4"

ATTIC50' - 7 1/4"

Level 3.541' - 10 15/16"

EXISTING WALL

METAL STUD WALLWITHGYP. BD AND MOSAICTILE

GYP BOARD TOTERMINATE 6"ABOVE CEILING

METAL STUD WALL ,TERMINATE ATSTRUCTURE ABOVE

SUSPENDED CEILINIG

DEMO CEILINGGRID AND TILE

9' -

7 3/

32"

9' -

2 23

/32"

11' - 9 55/64"

DEMO CMU WALLFOR DUCTS3' - 3"

9' -

7 3/

32"

9' -

2 23

/32"

11' - 9 55/64"

ACT-1

ACT-1

LEVEL 10' - 0"

LEVEL 217' - 8"

BASEMENT LEVEL-10' - 3 1/4"

Level 333' - 8 1/4"

ATTIC50' - 7 1/4"

ROOF58' - 1 1/4"

Level 2.525' - 9"

Level 3.541' - 10 15/16"

Level 1.58' - 9 3/4"

PATCH AND REPAIR EXISTINGSTUCCO WALL (TYPICAL)

PAINT ALL VERTICALWALL SURFACES INSTAIRWELL

PATCH AND REPAIR EXISTINGSTUCCO WALL (TYPICAL)

PAINT ALL VERTICALWALL SURFACES INSTAIRWELL

PATCH AND REPAIR EXISTINGSTUCCO WALL (TYPICAL)

PAINT ALL VERTICALWALL SURFACES INSTAIRWELL

PATCH AND REPAIR EXISTINGSTUCCO WALL (TYPICAL)

PAINT ALL VERTICALWALL SURFACES INSTAIRWELL

PATCH AND REPAIR EXISTINGSTUCCO WALL (TYPICAL)

PAINT ALL VERTICALWALL SURFACES INSTAIRWELL

140

WES

T O

XMO

OR

RD

., SU

ITE

200

HO

MEW

OO

D, A

L. 3

5219

(205

) 942

-662

0P.

O. B

OX

1927

9(2

05) 9

42-6

621

FAX

CONSULTING ENGINEERS

PRO

JEC

T N

O.

CHB MECHANICAL, LLC

CH

B

SNA

SNA

14038

Facilities Management

1161 West Samford Avenue

Safety is our first priority.Think Safety. Act Safely.

RevisionNo. Date

Sam

ford

Hal

l X

-03-

04In

stal

latio

n of

an

Ener

gy R

ecov

ery

Uni

t

Aub

urn

Uni

vers

ity P

roje

ct N

umbe

r 15-

040

06­03-16

AU # 15-040

DRAWN BY:

CHECKED BY:

DATE:

FILE NUMBER:

PROJECT NUMBER:

SHEET NUMBER:

SHEET TITLE:

06/03/16

Auburn University, AL 36849

Phone: (334) 844-4810

Fax: (334) 844-9458

A1.4

BATHROOMDETAILS

1/4" = 1'-0"5 BATHROOMS - NEW WORK

1/4" = 1'-0"4 BATHROOM- NEW WORK RCP FLOOR 3

3" = 1'-0"8 FURRED WALL- DETAIL

1/2" = 1'-0"6 BATHROOM- NEW FINISHES

NOTES:

1. RE- INSTALL ALL EXISTING CEILING MOUNTED DEVICES(FIRE ALARM& OCCUPANCYSENSORS) AND EXISTING LIGHTING FIXTURES AT PREVIOUS LOCATIONS

2. INSTALL CEILING GRID IN CURRENT LOCATIONS AUTO SPRINKLER HEADS TO BEPLACED IN THE CENTER OF CEILING TILE.

FINISH SCHEDULE

FINISH MARK FINISH ITEM MANUFACTURER NAME/COLOR NOTES

ACT-1 ACOUSTIC CEILING TILE 2X2 ARMSTRONG (OR EQUAL) CIRRUS TEGULAR / WHITE, 3/4' THICK 15/16" EXPOSED TEE GRID, 24X24 TILECT MOSAIC TILE DALTILE BEACH DK04P1 TILE-CLAD SHERWIN-WILLIAMS MATCH EXISTING TILE-CLAD HIGH SOLIDS EPOXY (IN BATHROOMS)P2 WALL PAINT SHERWIN-WILLIAMS MATCH EXISTING IN STAIRWELL

1/2" = 1'-0"7 FURRED WALL SECTION

1/4" = 1'-0"2 BATHROOM-RCP DEMO FLOORS 2 & 3

3 OF 19

1/4" = 1'-0"3 BATHROOM- NEW WORK RCP FLOOR 2

1/4" = 1'-0"1 LONGITUDINAL SECTION THRU STAIRS

Page 4: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

W8X

10

W8X

10

W10X

26

W8X

10

W10X26

W10X26

LOCATE BEAM DIRECTLYOVER CENTERLINE OFEXISTING WOOD GIRDER -ADD STEEL SHIMS SO AS TOPROVIDE FULL BEARING OF ENTIRELENGTH OF BEAM ON WOOD FLOORING

NEW ERU 8000# WT.20'-0" x 6'-6" APPROXIMATESIZE. GENERAL CONTRACTORCOORDINATE EXACT SIZEWITH STEEL FRAMING

EXISTINGSOLID BRICK

CHIMNEY

EXISTING 14.5"x11.5"WOOD GIRDER

EXISTING ROUND CASTIRON COLUMN BELOW

1

S1.0

EXISTING EAST EXTERIORWALL OF BUILDING

EQ

6' -

6"

EQ

EXISTINGSTAIR TOWER

EXISTINGSTAIR TOWER

1' - 0" 6' - 6" 13' - 6"

FIELD VERIFY

EXISTINGWOOD JOISTS

EXISTINGWOOD JOISTS

NEW BEAM -SEE PLAN

EXISTING ATTICFLOOR

ERU

L3 1/2x3 1/2x5/16 x 0'-7"EACH SIDE OF WEB.ATTACH TO WEB WITH (2) 3/4"ØA325 BOLTS. ATTACH EACH ANGLETO EXISTING MASONRY W/ (2) 3/4"ØHILTI HAS RODS EMBEDDED 8"USING HILTI HIT HY70 ADHESIVEANCHOR (4 RODS TOTAL).

EXISTING SOLIDBRICK CHIMNEY

Typical Beam to Beam Connection

NEW BEAM -SEE PLAN

EXISTINGATTIC FLOOR

NEW ERUBY MECH

(2) L3 1/2x3 1/2x5/16 x 0'-6"EACH SIDE OF WEB BOLTEDTO EACH BEAM W/ (2) 3/4"ØA325 BOLTS

GENERAL NOTES

1. GENERAL

1.1 THE STRUCTURAL DRAWINGS AND SPECIFICATIONS ARE A PORTION OF THE

CONSTRUCTION DOCUMENTS. THE CONTRACTOR AND SUBCONTRACTORS SHALL

REFERENCE AND COORDINATE WITH ALL OTHER DISCIPLINES' DRAWINGS.

ANY DISCREPANCIES OR OMISSIONS SHALL BE REPORTED TO THE STRUCTURAL

ENGINEER AND ARCHITECT.

1.2. DESIGN CRITERIA:

A. CODES AND SPECIFICATIONS:

1. GENERAL BUILDING CODE:

INTERNATIONAL EXISTING BUILDING CODE, 2012 EDITION.

2. DESIGN LOAD CRITERIA:

MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES,

AMERICAN SOCIETY OF CIVIL ENGINEERS, ASCE 7

3. STRUCTURAL STEEL:

SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS,

AMERICAN INSTITUTE OF STEEL CONSTRUCTION, AISC 360.

B. DESIGN LOADS (PSF):

1. DEAD LOADS:

ANY CHANGES IN CONSTRUCTION MATERIALS FROM THOSE SHOWN

ON THE ARCHITECTURAL OR STRUCTURAL DRAWINGS SHALL BE

REPORTED BY THE CONTRACTOR TO THE STRUCTURAL ENGINEER

FOR VERIFICATION OF LOAD-CARRYING CAPACITY OF THE STRUCTURE.

2. LIVE LOADS:

NEW AHU IN ATTIC-------------------------------4000#

1.3. EXISTING CONDITIONS:

A. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS AND

SITE CONDITIONS PRIOR TO FABRICATION/CONSTRUCTION. NOTIFY

STRUCTURAL ENGINEER AND ARCHITECT OF ANY DISCREPANCIES PRIOR

TO FABRICATION/CONSTRUCTION.

1.4. INSPECTIONS/OBSERVATIONS:

A. STRUCTURAL OBSERVATION BY STRUCTURAL ENGINEER'S OFFICE.

1. STRUCTURAL OBSERVATION IS VISUAL OBSERVATION OF THE IN-

PLACE STRUCTURE FOR GENERAL CONFORMANCE TO THE APPROVED

CONSTRUCTION DOCUMENTS AT THE TIME OF THE OBSERVATION.

2. CONTRACTOR SHALL NOTIFY STRUCTURAL ENGINEER AND ARCHITECT,

PER THE SCHEDULE STATED BELOW, WHEN SUCH ITEMS HAVE

PROGRESSED TO THE POINT WHERE THEY WILL BE IN PLACE AND

READY FOR REVIEW. FAILURE TO NOTIFY MAY REQUIRE REMOVAL OF

COMPLETED CONSTRUCTION.

NOTIFY PRIOR TO THE REQUIRED DAYS

FOLLOWING SCHEDULED TASKS NOTIFICATION

__________________________________________________________

INSTALLATION OF RTU-----------------------------2 DAYS

1.5. SUBMITTALS:

A. REVIEW OF SHOP DRAWINGS AND OTHER SUBMITTALS BY THE STRUCTURAL

ENGINEER DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO

REVIEW AND CHECK SHOP DRAWINGS BEFORE SUBMITTING TO THE STRUCTURAL

ENGINEER. THE CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR ERRORS AND

OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS THEY

PERTAIN TO MEMBER SIZES, DETAILS, AND DIMENSIONS SPECIFIED IN THE

CONTRACT DOCUMENTS. ALL SHOP DRAWINGS MUST BE REVIEWED AND

"APPROVED" BY THE CONTRACTOR PRIOR TO SUBMITTAL.

B. ELECTRONIC SHOP DRAWING SUBMITTALS: SUBMIT ALL ELECTRONIC

SHOP DRAWINGS IN .PDF FORMAT. REVIEWED SHOP DRAWINGS WILL BE

RETURNED IN .PDF FORMAT. ALL PRINTS REQUIRED BY THE CONTRACTOR ARE

THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE MADE AFTER

APPROVED SHOP DRAWINGS ARE RETURNED.

C. RESUBMITTED SHOP DRAWINGS: RESUBMITTED SHOP DRAWINGS SHALL HAVE

ALL CHANGES SINCE THE PREVIOUS SUBMISSION IDENTIFIED BY CLOUDING

OR OTHER CLEAR COMMUNICATION. RE-REVIEWED SHOP DRAWINGS WILL ONLY

BE REVIEWED FOR IDENTIFIED CHANGES.

D. SHOP DRAWINGS: THE CONTRACTOR SHALL SUBMIT FOR STRUCTURAL ENGINEER

REVIEW SHOP DRAWINGS FOR THE FOLLOWING ITEMS.

1. STRUCTURAL STEEL

1.6. ALL DETAILS SHOWN ARE TYPICAL. SIMILAR DETAILS APPLY TO SIMILAR

CONDITIONS, UNLESS NOTED.

1.7. THE CONTRACTOR IS RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES,

AND PROCEDURES OF CONSTRUCTION.

1.8. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS/ROOFS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT LOADS

DO NOT EXCEED THE DESIGN LIVE LOAD.

2. STRUCTURAL STEEL

2.1. FABRICATE AND ERECT ALL STRUCTURAL STEEL IN ACCORDANCE WITH AISC

"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES".

2.2. STRUCTURAL STEEL: ASTM A992 FOR WIDE FLANGE BEAMS AND COLUMNS; ASTM A36

FOR CHANNELS, PLATES, AND ANGLES.

2.3. WELDED CONNECTIONS: E70XX ELECTRODES, MINIMUM SIZE FILLET WELD

3/16". FIELD WELDING IS NOT ACCEPTABLE.

2.4. BOLTED CONNECTIONS: BEARING TYPE A325-N IN ACCORDANCE WITH AISC

"SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS".

BOLTS THROUGH 4" WIDE BEAM FLANGES SHALL BE 5/8" DIAMETER. OTHER BOLTS

SHALL BE 3/4" DIAMETER. USE SNUG TIGHT BEARING CONNECTIONS FOR

ALL BOLTED CONNECTIONS.

2.5. BOLTS SHOWN IN SECTIONS AND DETAILS ARE A SCHEMATIC INDICATION

THAT BOLTS MAY BE USED. ACTUAL NUMBER, UNLESS SPECIFIED, TO BE

IN ACCORDANCE WITH AISC.

2.6. ALL NON-COMPOSITE BEAM CONNECTIONS SHALL BE "SIMPLE SHEAR CONNECTIONS",

UNLESS NOTED.

3. POST INSTALLED ANCHORS

3.1. POST INSTALLED ANCHORS SHALL COMPLY WITH ACI-318 APPENDIX D.

3.2. ACCEPTABLE MANUFACTURERS SHALL INCLUDE BUT ARE NOT LIMITED TO

HILTI, INC. AND SIMPSON STRONG-TIE COMPANY, INC.

3.3. HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE

MANUFACTURER'S WRITTEN INSTRUCTIONS. SUBSTITUTION REQUESTS, FOR

PRODUCTS OTHER THAN THOSE SHOWN SHALL BE SUBMITTED BY THE

CONTRACTOR ALONG WITH PREPARED DOCUMENTATION DEMONSTRATING EQUAL

SUBSTITUTION THAT THE PRODUCT IS CAPABLE OF ACHIEVING EQUIVALENT

PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE

APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS REQUIRED BY THE

BUILDING CODE.

3.4. THE CONTRACTOR SHALL FOLLOW ALL MANUFACTURER'S INSTALLATION

GUIDELINES, SPECIFICATIONS, AND RECOMMENDATIONS.

3.5. MASONRY ANCHORS:

1. ANCHORAGE TO HOLLOW CONCRETE MASONRY/UNREINFORCED CLAY BRICK

MASONRY:

B. ADHESIVE ANCHORS WITH SCREEN TUBES SHALL BE TESTED AND

QUALIFIED IN ACCORDANCE WITH ICC-ES AC58 OR AC60, AS

APPROPRIATE. THE APPROPRIATE SCREEN TUBE SHALL BE USED

AS RECOMMENDED BY THE ADHESIVE MANUFACTURER.

A

A

L

B A

A

M

NE

REENI

G

PROFESSIONAL

L

ICE N S E

D

No. 29133

DA

N

I E L M . F R A N K

LI N

140 W

ES

T O

XM

OO

R R

D., S

UIT

E 2

00

CONSULTING ENGINEERS

HO

ME

WO

OD

, A

L. 35219

(205)

942-6

620

PR

OJE

CT

NO

.

P.O

. B

OX

19279

(205)

942-6

621 F

AX

CHB MECHANICAL, LLC

CH

B

MainFax

(205) 251-4500(205) 324-4181

PROJECT NO.

LBYD, Inc.Civil and Structural Engineers716 South 30th StreetBirmingham, AL 35233

C copyright 2015

These drawings and design intent are the sole property of

LBYD, Inc. which may not be reproduced without written permission

Facilities Division1161 West Samford Avenue

Auburn University, AL 36849Phone: (334) 844-9450Fax: (334) 844-9458

Safety is our first priority.Think Safety. Act Safely.

SHEET NUMBER

PROJECT NUMBER

FILE NUMBER

DATE

CHECKED BY

DRAWN BY

AU # 15-040

Sam

ford

Hal

l -X

-03-0

4

101-14-160.002

16048

ERU SUPPORT IN ATTIC

CJM

DMF

06-03-16

6-03-16

4 of 19

4/2

8/2

01

6 9

:49

:39

AM

C:\U

se

rs\d

fra

nklin

\Do

cum

en

ts\1

01

-14-1

60.0

02 -

Sa

mfo

rd H

all

- R

15

- C

en

tral_

dfr

an

klin

.rvt

Inst

alla

tion

of a

n E

nerg

y R

ecov

ery

Uni

tA

ubur

n U

nive

rsity

Pro

ject

Num

ber

15-0

40

S1.0 1/4" = 1'-0"

ERU Support Framing at Attic

3/4" = 1'-0"S1.01 Section

Rev Phase Date

Page 5: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

RIGHT SIDE

LEFT SIDE

UNIT LENGTH = 230

UN

IT

H

EIG

HT

=

6

5

UN

IT

W

ID

TH

=

8

2

5

S/A

60" X

16" O

PE

NIN

G

MOP MOP

2'' 20ga Solid Galv. = 172

2'' 22ga Perf

Galv./Mylar = 58

UN

IT

H

EIG

HT

=

1

13

ACCESS

DOOR

ACCESS

DOOR

ACCESS

DOOR

ACCESS

DOOR

ACCESS

DOOR

ACCESS

DOOR

ACCESS

DOOR

63

54

5

O/A

60" X

24" D

AM

PE

R

ACCESS

DOOR

E/A

66" X

18" O

PE

NIN

G

R/A

66" X

18" D

AM

PE

R

HE

AT

WH

EE

L (1)

2" P

RE

-F

ILT

ER

48" X

72"(1)

2" P

RE

-F

ILT

ER

36" X

72"(2)

CO

OLIN

G C

OIL (1)

30" D

RA

IN

P

AN

HE

AT

IN

G C

OIL (2)

DEMOUNT

= 25

DEMOUNT

= 33

DEMOUNT

= 18

DEMOUNT

= 33

DEMOUNT

= 33

DEMOUNT

= 30DEMOUNT

= 33

DEMOUNT

= 25

ACCESS

DOOR

ACCESS

DOOR

A/D TOSL PKS

FIBERGLASS (2)

24W X 45H

A/D TOSL

FIBERGLASS (1)

24W X 60H

A/D TOSL

FIBERGLASS (3)

18W X 60H

A/D TOSL

FIBERGLASS (4)

18W X 45H

A/D TOSL

FIBERGLASS (5)

24W X 60H

A/D TOSL

FIBERGLASS (6)

24W X 45H

A/D TOSL

FIBERGLASS (7)

24W X 45H

A/D TOSL

FIBERGLASS (8)

18W X 60H

A/D TOSL

FIBERGLASS (9)

18W X 60H

A/D TOSL PKS

FIBERGLASS (10)

24W X 60H

25 12 17 4 18 2 31 2 31 2 28 4 29 24

Page 6: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 7: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

SUPPLY

RETURN

CLG-O

C

C

OA DA

SF-C

SF-S

SDR-1

DA-T

SF VFD

OA-VP

LT-A

DAPHI-A

MA-T

NC

OAD-O

SF-O

AHU SEQUENCE OF OPERATION

SUPPLY FAN CONTROL

: THE SUPPLY FAN WILL BE STARTED BASED ON OCCUPANCY SCHEDULE. WHEN THE SUPPLY FAN STATUS INDICATES THE FAN

STARTED, THE CONTROL SEQUENCE WILL BE ENABLED. THE SUPPLY FAN WILL MODULATE TO CONSTANT VOLUME SETTING ON DRIVE,

DETERMINED THROUGH TESTING AND BALANCING. UPON A LOSS OF AIRFLOW, THE SYSTEM WILL AUTOMATICALLY RESTART.

OA CONTROL

: THE OA DAMPER WILL OPEN AND CLOSE AS REQUIRED TO MAINTAIN THE OA FLOW SETPOINT. THE FRESH AIR INTAKE

OF THE UNIT WILL BE LIMITED TO PREVENT THE MIXED AIR TEMPERATURE FROM FALLING BELOW THE LOW LIMIT SETPOINT.

TEMPERATURE CONTROL

: THE DISCHARGE AIR TEMPERATURE SETPOINT WILL BE RESET AS ZONE TEMPERATURE CHANGES.

OCCUPIED MODE

: THE OCCUPANCY MODE WILL BE CONTROLLED VIA A NETWORK INPUT. THE OCCUPANCY MODE CAN ALSO BE OVERRIDDEN BY A

NETWORK INPUT.

UNOCCUPIED MODE

: THE UNIT WILL REMAIN OFF DURING UNOCCUPIED PERIODS.

COOLING COIL/HEATING COIL

: THE COILS WILL MODULATE TO MAINTAIN THE EXHAUST TEMPERATURE SETPOINT 75° (ADJ.). WHEN THE UNIT IS SHUTDOWN, THE

COILS WILL BE COMMANDED TO A PRESET POSITION SHOULD THE MIXED AIR TEMPERATURE FALL BELOW 35° (ADJ.) SETPOINT.

UPON A LOSS OF AIRFLOW, THE COILS WILL BE OFF.

ADDITIONAL POINTS MONITORED BY THE FMS

:

· LOW TEMPERATURE ALARM (LT-A)

Point Name Description

AO CLG-O Cooling Output

AI DA-T Discharge Air Temperature

BI LT-A Low Temperature Alarm

AI MA-T Mixed Air Temperature

AO OAD-O Outdoor Air Damper Output

AI OA-VP Outdoor Air Velocity Pressure/CFM

BO SF-C Supply Fan Command

AO SF-O Supply Fan Output

BI SF-S Supply Fan Status

L H

OA

BO - Outside Air Damper

BI - Outside Air Damper Status

T

M

T

N.C.

N.C.

S

S

Starter

CT

BO - Enthalpy Wheel Start/Stop

BI - Enthalpy Wheel Status

AI - Enthalpy Wheel Discharge Air Temp

AI - Relief Air Temp

AI - Outside Air Temp

AI - Exhaust Air Temp

BO - Enthalpy Wheel Bypass Dampers

BO - Enthalpy Wheel Bypass Dampers

RAEA

T

AI - Zone Temp

DA

M

VFD

CT

BI - Supply Fan Status

BO - Supply Fan Start/Stop

T

AI - Discharge Air Temp

BI - Freezestat BI - Smoke Detector

BI - Exhaust Fan Status

BO - Exhaust Fan Start/Stop

M

CT

VFD

EA

H

H

AI - Outside Air Humidity

AI - Enthalpy Wheel Discharge Air Humidity

AI - Relief Air Humidity

HWS

HWR

AO - Heating Valve

M

AO - Cooling Valve

CHS

CHR

CHW

M

H

AI - Zone Humidity

T

HW

EF

N.C.

T

TH T

AI - Cooling Coil Temp

2-Way Control Valve (U.N.O)2-Way Control Valve (U.N.O)

H

AI - Discharge Air Dew Point

AO - Exhaust Fan VFD Speed

BI - Exhaust Fan VFD Fault

AO - Supply Fan VFD Speed

BI - Supply Fan VFD Fault

AI - Air Flow Measuring

AI - Air Flow Measuring

RA

AO HTG-O Heating Output

RETURN

SUPPLY

HTG-O

H

C

S

AI - Temperature Sensor

in Exhaust Duct

FILTER DP

Filter Section

(No Adjustment Or Indication

At Thermostat)

(No Adjustment Or Indication

At Humidistat)

Locate On Both Ground And

Third Floors, See Plans.

Filter Section

AI - Differential Pressure

Filter Section

AI - Differential Pressure

Page 8: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

208A

208B

208C

208

206

208D

204

202E

202

202D

202B

202C

201

203

203B

205

207

200A

209

209C

209B

209F

209E

209H

211C

211B

211A

212

211

213

215

213A

213E

213B

215A

213D

209A

203D

202A

WOMEN

200C

MEN

200D

V201

C201

213C

203A

203C

205A

205B

205C

Page 9: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

310F

310E

310C

310

310G

310B

310A

306A

306

306B

304

302

302D

302C

302A

302B

301A

301B

301

303A

305

307C

307B

307E

307D

307F

307G

309A

311

311A

311B

303B

303

302E

WOMEN

300C

MEN

300D

310H

310D

307

307A

309B

309

309C

314A

300A

C301

C303

V301

C304

C302

305A

314

305B

Page 10: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

401D

401C

401A

401B

401E

V401

V403

V402

V404

Page 11: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

23

13

11

9

A

11

A

7

7

5A

A

6

6

B

6

WOM

5

B1

4

MEN

4B

14

4

4A

29A

28C

29

23A

29B

23B

15

23H

28

28B

26

28A

G1

23

18B

18A

A

9

C

11

A

13

B

11

16

23D

18

23C

23E

23F

23G

C001

C002

C003

V002

V001

X001

C004

16C

16A

16B

28D

Page 12: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

208A

208B

208C

208

206

208D

204

202E

202

202D

202B

202C

201

203

203B

205

207

200A

209

209C

209B

209F

209E

209H

211C

211B

211A

212

211

213

215

213A

213E

213B

215A

213D

209A

203D

202A

WOMEN

200C

MEN

200D

V201

C201

213C

203A

203C

205A

205B

205C

Page 13: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

310F

310E

310C

310

310G

310B

310A

306A

306

306B

304

302

302D

302C

302A

302B

301A

301B

301

303A

305

307C

307B

307E

307D

307F

307G

309A

311

311A

311B

303B

303

302E

WOMEN

300C

MEN

300D

310H

310D

307

307A

309B

309

309C

314A

300A

C301

C303

V301

C304

C302

305A

314

305B

Page 14: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in

401D

401C

401B

401E

V401

V403

V404

V402

401A

Page 15: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 16: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 17: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 18: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in
Page 19: 07/$'4 241,'%6 07/$'4 5*''6 07/$'4 - SharePoint wall see mechanical plans exisiting walls 7 a1.4 ... chb chb mechanical, llc project no. sna sna 14038 ... dead loads: any changes in