0.6. Quality Manual - GE Brazil

download 0.6. Quality Manual - GE Brazil

of 57

description

Quality Manual - GE Brazil

Transcript of 0.6. Quality Manual - GE Brazil

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    1/57

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANUAL

    QUALITY MANAGMENT SYSTEM

    REFERENCE: ISO 9001 REV.2008GEEQM Rev 2.0

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    2/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INDEX

    ISSUED:

    11/22/2011 SECTION AREPLACES

    08/09/2010 PAGE 2 OF 33

    Section Part Title Page #A Index page 02 and 03

    B IntroductionI...................................Description page 04II...................................Quality Manual page 04III..................................Scope of the quality management system page 05IV..................................Quality policy and responsibility page 06V...................................Certification page 07VI .................................Organization chart page 08 and 09

    C Quality Management System (QMS) Activities

    I Quality Management System1. General Requirements page 10

    2. Process Mapping page 113. Process Matrix X Normative Elements page 124. Diagram of a Customer Oriented Process (COP) page 13

    II Documentation Requirements1. Generalities page 142. Quality Manual page 143. Document Control page 144. Control of Quality Records page 15

    III Management Responsibility1. Commitment page 152. Focus on the Customer page 153. Quality Policy page 154. Planning

    4.1 Quality Objectives page 164.2 Quality Management System Planning page 16

    5. Responsibility, Authority and Communication5.1 Responsibility and Authority page 165.2 Management Representative page 165.3 Internal Communication page 17

    6. Critical Analysis by Management6.1 Generalities page 176.2 Critical Analysis Input page 176.3 Critical Analysis Output page 17

    IV Resource Management1. Resource Supply page 181.1. Human Resources

    1.1.1 Generalities page 181.1.2 Competence, Awareness and Training page 18

    1.2 Infrastructure page 191.3 Work Environment page 19

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    3/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INDEX

    ISSUED:

    11/22/2011 SECTION AREPLACES

    08/09/2010 page

    3 OF

    33

    V Product Execution1. Product Execution Planning page 192. Processes Related to Customers

    2.1 Determination of Product Related Requirements page 192.2 Critical Analysis of Product Related Requirements page 202.3 Communication with Customers page 21

    3. Design and Development3.1 Design and Development Planning page 213.2 Design and Development Inputs page 21

    3.3 Design and Development Outputs page 223.4 Critical Analysis of Design and Development page 223.5 Design and Development Verification page 223.6 Design and Development Validation page 233.7 Control of Alterations in Design and Development page 23

    4. Purchasing4.1 Purchasing page 234.2 Information for Purchasing page 244.3 Purchased Product Verification page 24

    5. Production and Service Supply5.1 Production Control and Service Supply page 245.2 Process Validation and Service Supply page 255.3 Identification and Traceability page 25

    5.4 Customer Property page 255.4a Customer Production Tools page 26

    5.5 Product Preservation page 265.6 Control of Measurement and Monitoring Devices page 26

    VI Measurement, Analysis and Improvement1. Generalities page 272. Measurement and Monitoring

    2.1 Customer Satisfaction page 272.2 Internal Audits page 272.3 Process Measurement and Monitoring page 282.4 Product Measurement and Monitoring page 28

    3. Control of Nonconformance Products page 28 and 294. Data Analysis page 295. Improvements

    5.1Continuous Improvement page 295.2Corrective Actions page 295.3Preventive Actions page 30

    VII Appendix1. QMS Matrix Gevisa x GEE procedures x WI ISMWI page 31

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    4/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INTRODUCTION

    ISSUED:

    11/22/2011 SECTION BREPLACES

    08/09/2010 PAGE 4 OF 33

    I - DESCRIPTION

    This Quality Manual describes the GE-GEVISA S. A. Quality Management System thatreflects the following norm requirements:

    ISO 9001 Ed. 2008Quality Management System

    EN 13980 Potentially explosive atmospheres Application of quality systems

    GE Energy procedures

    The following aspects were taken into consideration when structuring the Quality

    System: Quality Policy and company objectives. Installations and material and human resources. Technical, cultural and own management knowledge.

    II- QUALITY MANUAL:

    This Quality Manual describes the GE-GEVISA S.A. Quality Management System,integrating its technical and administrative culture, installations, and material andhuman resources and is approved by the Ge Energy.

    The Management Representative elaborates and maintains the Quality Manual, whichis approved by the Plant Manager and Quality Control Manager

    The revision is elaborated, verified and approved in an identical manner as the priorissue.

    The Manuals situation is controlled by means of its revision index, characterized byalterations in one or more divisions.

    The Quality Manual is only available in electronic media printed. Copies and

    distributions are not permitted and controlled.

    The quality terminology used can be found in ISO 9000/2000 Quality ManagementSystem / Fundamentals and Vocabulary.

    The GE Energy Quality Manual complement the Gevisa Quality Manual and it isattached.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    5/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INTRODUCTION

    ISSUED:

    05/30/2011 SECTION BREPLACES

    11/22/2011 PAGE 5 OF 33

    III SCOPE OF THE QUALITY MANAGEMENT SYSTEM:

    Design, Manufacture and Service of medium and large motors & generators andIndustrial Services

    BASEEFA SCOPE: Custom 8000 TEAAC induction motors, Ex NII T3 (BS500:part 6)

    Product list Atex type Examination Certificates

    A) EXCLUSIONS

    For Industrial Services, Requirement 3 of Design and Development does not applysince it is a the customers responsibility.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    6/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INTRODUCTION

    ISSUED:

    11/22/2011 SECTION BREPLACES

    08/09/2010PAGE

    6OF

    33

    IV QUALITY POLICY AND RESPONSIBILITY

    This policy of GE GEVISA establishes, as a strategic objective, reaching andmaintaining a reputation of leadershipwith respect to the quality of its products andservices, continuingly striving to meet and exceed its customers expectations.

    In accordance with this policy, GE GEVISArecognize that the human factorisfundamental in obtaining total quality, and that all necessary support should be given topeople for their full understanding of this premise.

    Pursuing quality through all existing processes is an endless mission, which isaimed at the continuous improvementof any task, which adds value to the product orservice, thus emphasizing a constant participation of each employee and teamwork.

    Specific activities, which preserve the environment and the individual safetyofeach contributor, shall be considered a priority and shall have full management support.General prevention is also considered a strategic business point through the permanentsearch of the continuous improvement process.

    To implement this policy, the company delegates to each individual contributorhis personal commitment, encouraging and facilitating his self-confidence, simplicityand speed in performing any pertinent task.

    This policy, together with internal procedures and routines, gives support to thequality system applied by the company and described in the quality manual.

    Jos Luiz CastreseGeneral Manager

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    7/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INTRODUCTION

    ISSUED:

    11/22/2011 SECTION BREPLACES

    08/09/2010 PAGE 7 OF 33

    V- CERTIFICATION

    We certify that this quality manual, together with the internal routines and writtenprocedures, truthfully describes the Quality System applied at the GE - Gevisa plant inCampinas SP.

    ______________________________ 11/22/2011Antonio Carlos Adorno

    Management RepresentativeQuality Control Manager

    ______________________________ 11/22/2011Srgio de OliveiraPlant Manager

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    8/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INTRODUCTION

    ISSUED:

    11/22/2011 SECTION BREPLACES

    08/09/2010 PAGE 8 OF 33

    VI ORGANIZATION CHART

    Company Organization Chart

    Commercial Finance

    Sales Quality

    Control

    M&G

    Technology

    Human

    Resources

    Technical and

    EHS Services

    Industrial

    Services

    Industrial

    General Manager

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    9/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    INTRODUCTION

    ISSUED:

    11/22/2011 SECTION BREPLACES

    08/09/2010 PAGE 9 OF 33

    QUALITY CONTROL DEPARTMENT ORGANIZATION CHART

    Quality

    System

    Incoming inspection,

    Metrologies and laboratories

    QC eng /In process inspection Final test

    QualityControl

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    10/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 10 OF 33

    I- QUALITY MANAGEMENT SYSTEM

    1 GENERAL REQUIREMENTS

    GE GEVISA S. A. establishes, documents, implements and maintains a quality managementsystem and continuously improves its effectiveness according to ISO 9001:2008requirements.

    GE GEVISA S.A.:

    a) identifies the necessary processes for the quality management system and for itsapplication throughout the entire organization;

    b) determines the sequence and the interaction for these processes;

    c) determines the necessary criteria and methods for ensuring the effective operation andcontrol of these processes;

    d) ensures the availability of necessary resources and information to support the operationand monitoring of these processes;

    e) monitors, measures and analyzes these processes, and;

    f) implements the necessary measures to reach the planned results and the continuousimprovement of these processes.

    These processes are managed by GE GEVISA S. A. in compliance with ISO 9001:2008requirements.

    Whenever GE GEVISA S.A.opts to purchase any process externally that may affect productconformity with regard to requirements, GE GEVISA S.A. guarantees the control of theseprocesses. The control of said processes is identified in the quality management system.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    11/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 11 OF 332 PROCESS MAPPING

    Process Mapping

    COPProcess (Customer Oriented Process)

    This process is being considered in each key process.

    Inputs

    Customer

    Requirements S

    atis

    faction

    Quality Management SystemCONTINUOUS IMPROVEMENT

    Outputs

    Product Customer

    Management

    Responsibility

    Resource

    Management

    Measurement,Analysis andeimprovement

    ProductExecution

    QM-section C- III

    QM-section C- VIQM-section C- IV

    QM-section C- V

    Management

    Process

    Resources

    Managment

    Sales

    Process

    Design

    Process

    S ourcing Process Manufacturing

    Process

    Fina Test

    Process

    Expediting

    Process

    Meas/ Monit/

    Anal. Process

    Customer(Require

    ments)

    COP process (customer oriented process)

    Process is considered in each key process

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    12/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEMISSUED:11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 12 OF 33

    3 PROCESS MATRIX X NORMATIVE ELEMENTS (*)

    PROCESSES

    ISO 9001:2008STANDARDREQUIREMENTS

    Management

    ResourceManagement

    Sales

    Design/Development

    Purchasing/Supplies

    Manufacturin

    Finaltestin

    Expediting

    M

    eas/Anal/Impr

    Reference Documents

    4.1 General Requirements QM, QMS Routines4.2.1 Generalities QM, QMS Routines4.2.3 Document Control QM, Routine 2.14.2.4 Quality Record Control QM, Routine 2.25.1 Management Commitment QM, Routine 2.135.2 Focus on the Customer QM, Routine 2.135.3 Quality Policy Quality Manual5.4 Planning Routine 2.135.5.1 Responsibility and Authority QM, QMS Routines5.5.2 Management Representative Routine 2.135.5.3 Internal Communication Routine 2.135.6 Critical Analysis by Management Routine 2.13

    6.1 Resource Supply Routine 2.116.2 Human Resources Routine 2.116.3 Infrastructure QMS Routines6.4 Work Environment Routine 2.117.1 Product Execution Planning Routine 2.9 / Routine 2.177.2 Processes Related to Customers Routines 2.6 and 2.167.3 Design and Development Routine 2.77.4 Purchasing Routine 2.87.5.1 Production Control and Service Supply Routine 2.97.5.2 Production Process Validation Routine 2.97.5.3. Identification and Traceability Routine 2.97.5.4 Customer Property Routines 2.6 and 2.16

    7.5.5 Product Preservation Routine 2.107.6 Measurement and Testing Equipment Control Routine 2.148.1 Generalities Routine 2.12.8.2.1 Customer Satisfaction Routines 2.13 and 2.128.2.2 Internal Audit Routine 2.38.2.3 Process Measurement and Monitoring Routine 2.12

    8.2.4 Product Measurement and Monitoring Routines 2.09 and 2.128.3 Control of Nonconformance Product Routine 2.48.4 Data Analysis Routine 2.128.5.1 Continuous Improvement Routine 2.128.5.2 Corrective Action Routine 2.5

    8.5.3 Preventive Action Routine 2.5

    (*) To QMS Matrix Gevisa x GEE procedures x WI ISMWI see the appendix on page 31.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    13/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 13 OF 33

    4 COP DIAGRAM

    Customer Interface

    Management Process: Performs at interfaces between COPs and interfaces x Customer,

    through the CRITICAL ANALYSIS BY MANAGEMENT

    Expediting

    Manuf

    acturing

    F

    ina

    lTest

    Design/Dev.

    Sales

    - Quantity- Period of Time

    - Logistics Identif. and

    Packaging and Delivery

    Product delivery in correct

    quantity, on-time,

    identified and packaged.

    Customer taken care of in

    re uirements

    - Customer needs

    (requirements):

    - Non Declared Req.

    - Regulatory Req.

    -ProductSpecifications

    -Proc.Variab.

    Reduction

    -NonDeclaredReq.

    Prod.

    -Cost/PriceReduction

    -PackagingRequirements

    Product/ProcessDesign.

    Validatedaspercustomer

    need

    -

    InternalOrder;

    -RawMaterial;

    -ConformingProducts

    -ContinuousImprovement

    Production.

    Planning

    Internal

    Audit

    Customer Input

    Customer Output

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    14/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE14 OF 33

    II DOCUMENTATION REQUIREMENTS

    1) GENERALITIES

    The quality management system documentation includes:a) documented declarations of the quality policy and the quality objectives;b) quality manual;c) documented procedures required by ISO 9001:2008;d) documents required by GE GEVISA S.A. to ensure the effective planning, operation and

    control of its processes, and;

    e) quality records required by ISO 9001:2008.2) QUALITY MANUAL

    GE GEVISA S.A. elaborates and maintains a quality manual that includes:

    a) the scope of the quality management system, including details and justifications for anyexclusions;

    b) the documented procedures established for the quality management system, orreferences to them, and;

    c) the description of the interaction between the quality management system processes.

    3) DOCUMENT CONTROL

    The documents required by the quality management system are controlled. Quality recordsare a special type of document and are controlled in conformance with the requirementsset forth in C-II-4.

    A documented procedure is established to define the necessary controls to:

    a) approve documents as to their conformance prior to issuance;

    b) critical analyze and update documents, whenever necessary, and approve them again;

    c) ensure that alterations and the documents current revision situation are identified;

    d) ensure that the pertinent versions of applicable documents are available in those areaswhere they will be used;

    e) ensure that documents remain legible and readily identifiable;

    f) ensure that documents with an external origin are identified and that their distribution iscontrolled, and;

    g) avoid the unintentional use of obsolete documents and apply the proper identification inthose cases whereby they are retained for any reason.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    15/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 15 OF 33

    4) QUALITY RECORD CONTROL

    Quality records are established and maintained to provide proof of conformance withrequirements and of the effective operation of the quality management system. Records arekept legible, readily identifiable and recoverable. A documented procedure is established todefine the necessary controls for the identification, storage, protection, recovery, retentionperiod and discarding of records.Note: Disposal implies in discarding

    III MANAGEMENT RESPONSIBILITY

    1) MANAGEMENT COMMITMENT

    Top management represented by the Quality Committee provides proof of its commitmentto the development and the implementation of the quality management system and withthe continuous improvement of its effectiveness by means of:a) the communication to the organization of the importance in satisfying customer

    requirements as well as regulatory and statutory requirements;b) the institution of the quality policy;c) the guarantee that the quality objectives have been established;d) the carrying out of critical analyses by the Quality Committee, and;e) the guarantee of resource availability.

    2) FOCUS ON THE CUSTOMER

    Top management, through the Quality Committee, ensures that customer requirements aredetermined and satisfied with the aim of increasing customer satisfaction.In order to confirm that these requirements and their purposes are being satisfied, customersatisfaction surveys are carried out and the results are analyzed by Top Management,

    through the Quality Committee.

    3) QUALITY POLICY

    Top Management, through the Quality Committee ensures that the quality policy:

    a)is appropriate for GE GEVISA S.A. purposes;b)includes a commitment to satisfying requirements and to the continuous

    improvement of the quality management systems effectiveness;

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    16/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 16 OF 33c) provides a structure for establishing and critically analyzing quality objectives;d)is communicated and understood throughout the entire organization, and;e)is critically analyzed for maintaining its conformance.

    4) PLANNING

    4.1) Quality Objectives

    Top Management, through the Quality Committee, ensures that the quality objectives,including those necessary to satisfy product requirements, are established in the pertinentfunctions and levels at GE GEVISA S.A.. The quality objectives are measurable and coherentwith the quality policy.

    4.2) Planning of the Quality Management System

    Top Management, through the Quality Committee, ensures that:

    a) the planning of the quality management system is carried out in a manner to satisfythose requirements cited in 4.1, as well as the quality objectives, and;

    b) the integrity of the quality management system is maintained when changes in the

    quality management system are planned and implemented.

    5) RESPONSIBILITY, AUTHORITY AND COMMUNICATION

    5.1) Responsibility and Authority

    Top Management, through the Quality Committee, ensures that the responsibilities andauthorities are defined and communicated at GE GEVISA S.A..

    5.2) Management Representative

    Top Management appoints GE GEVISA S.A.s Quality Control Manager, who regardless ofother responsibilities, has the responsibility and the authority to:

    a) ensure that the necessary processes for the quality management system areestablished, implemented and maintained;

    b) report to Top Management, through the Quality Committee, concerning the qualitymanagement systems performance and any need for improvement, and;

    c)ensure the fomentation of awareness concerning customer requirements throughoutthe organization.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    17/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 17 OF 33

    5.3) Internal Communication

    Top Management, through the Quality Committee, ensures that GE GEVISA S.A. establishesthe appropriate communication processes and that communication is carried outconcerning the effectiveness of the quality management system using, however not beinglimited to, the following:

    Informative meetings and other team meetings;

    Bulletin boards and internal 08/09/2010spapers;Electronic communication media;

    6) CRITICAL ANALYSIS BY MANAGEMENT

    6.1) Generalities

    Top Management, through the Quality Committee, critically analyzes GE GEVISA S.A.squality management system, at planned intervals, to ensure its continued pertinence,conformance and effectiveness. This critical analysis includes the evaluation ofopportunities for improvement and the needs for change in the quality managementsystem, including the quality policy and the quality objectives.

    Records will be kept of the critical analyses made by Top Management, through the QualityCommittee.

    6.2) Critical Analysis Inputs

    Critical analysis inputs by management include information concerning:

    a) audit results;

    b) customer feedback;c) process performance and product conformance;

    d) situation of preventive and Corrective Actions

    e) follow-up of measures derived from prior critical analyses made by management;

    f) changes that may affect the quality management system, and;

    g) improvement recommendations.

    6.3) Critical Analysis Outputs

    Critical analysis outputs by management include any decisions and measures related to:

    a) improvement in the effectiveness of the quality management system and itsprocesses;

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    18/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE18 OF 33

    b) product improvement in relation to customer requirements, and;

    c)resource needs.

    IV RESOURCE MANAGEMENT

    1) RESOURCE SUPPLY

    GE GEVISA S.A. determines and provides the necessary resources for:

    a) implementing and maintaining the quality management system and continuouslyimproving its effectiveness, and;

    b) increasing customer satisfaction by attending to their requirements.The resources are identified by means of, although not limited to:

    Critical analysis meetings by Top Management, through the Quality Committee;

    Training Program;

    Critical analysis of customer and product requirements;

    Production Planning;

    Internal Quality Audits;

    Requests for Corrective and Preventive Actions.

    1.1) Human Resources

    1.1.1) Generalities

    The personnel that carry out activities that affect product quality is competent with regardto education, training, skills and appropriate experience.

    1.1.2) Competence, Awareness and Training

    GE GEVISA S.A.:

    a) determines the necessary competences for those personnel that carry out jobs that

    affect product quality;

    b) provides training or takes other measures to satisfy these competence needs;

    c) evaluates the effectiveness of measures that have been taken;

    d) ensures that its personnel is aware of the pertinence and importance of its activities andhow they contribute to reaching quality objectives, and;

    f) keeps the appropriate education, training, skills and experience records (see C-II-4).

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    19/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 19 OF 33

    1.2) Infrastructure

    GE GEVISA S.A. determines, provides and maintains the necessary infrastructure to achieveconformance with product requirements. The infrastructure includes, whenever applicable:

    a) buildings, work space and associated installations;

    b) process equipment (materials and equipment as well as computer programs), and;

    c) support services (such as transportation or communication).

    1.3) Work environment

    GE GEVISA S.A. determines and manages the work environment conditions required toachieve conformance with product requirements.

    V) PRODUCT EXECUTION

    1) Product Execution Planning

    GE GEVISA S.A. plans and develops the necessary processes for product execution. Theproduct execution planning is coherent with the requirements for other qualitymanagement system processes.

    When planning product execution, GE GEVISA S.A. determines the following, wheneverappropriate:

    a) quality objectives and requirements for the product;

    b) the need for establishing processes and documents and providing specific resources forthe product;

    c) required verification, validation, monitoring, inspection and testing activities that arespecific for the product, as well as criteria for product acceptance;

    d) necessary records to supply evidence that the execution processes and the resultingproduct attend to the requirements.

    The output from this planning should be in a format that is appropriate to GE GEVISA S.A.operation methods.

    2) Processes Related to Customers

    2.1) Determinao dos requisitos relacionados ao produto

    GE GEVISA S.A. determines:

    a) the requirements specified by the customer, including the delivery and after deliveryactivity requirements;

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    20/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 20 OF 33

    b) the requirements that are not declared by the Customer, but that are necessary for thespecified or intentional use, when known;

    c) the statutory and regulatory requirements related to the product, and;

    d) any additional requirement determined by the organization.

    2.2) Critical Analysis of Product Related Requirements

    GE GEVISA S.A. critically analyzes those requirements related to the product. This criticalanalysis is carried out prior to GE GEVISA S.A. assuming the commitment to supply a productfor the customer (for example, presentation of proposals, acceptance of contracts or orders,acceptance of contract or order changes) and ensures that:

    a) the product requirements are defined;

    b) the contract or order requirements that differ from those that were previously manifestedare resolved, and;

    c) the organization has the capacity to attend to the defined requirements.

    Records are kept of critical analysis results and the measures that result from these actions(see C-II-4).

    When the Customer does not supply a documented declaration of requirements, GE GEVISAS.A. confirms the Customer requirements prior to acceptance.

    Whenever the product requirements have been changed, GE GEVISA S.A. ensures that thepertinent documents are complemented and that the pertinent personnel are warned aboutthe changed requirements.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    21/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 21 OF 33

    2.3) Communication with the Customer

    GE GEVISA S.A. determines and takes effective measures to communicate with thecustomers concerning:

    a) product information;

    b) handling of consultations, contracts or orders, including amendments, and;

    g) customer feedback, including their complaints.Several resources are made available by GE GEVISA S.A. in order to make communicationwith the customer effective, including, although not limited to:

    - Brochures, Catalogs;- Internet- Fax, letter, e-mail and telephone;- Visits.3) Design and Development

    3.1) Design and Development Planning

    GE GEVISA S.A. plans and controls product design and development.

    During design and development planning GE GEVISA S.A. determines:a) the stages for design and development;

    b) the critical analysis, verification and validation that are appropriate for each phase ofdesign and development, and;

    c) the responsibilities and authorities for design and development.

    GE GEVISA S.A. manages the interfaces between the different groups involved in design anddevelopment in order to ensure effective communication and the clear attribution ofresponsibilities.

    Planning outputs are appropriately updated as the design and development progress.

    3.2) Design and Development Inputs

    Inputs related to product requirements are determined and records are kept (see C-II-4).These inputs include:

    a) operation and performance requirements;

    b) applicable statutory and regulatory requirements;

    c) where applicable, information from similar prior projects, and;

    d) other essential requirements for design and development.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    22/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 22 OF 33

    These inputs are critically analyzed as to conformance. Requirements are completed,without any ambiguities nor any conflicts between them.

    3.3) Design and Development Outputs

    Design and development outputs are presented in such a way so as to enable theirverification with regard to design and development inputs, and are approved before beingreleased.

    Design and development outputs:

    a) attend to the design and development input requirements;

    b) supply appropriate information for purchasing, production and for supplying services;c) tell or reference product acceptance criteria, and;

    d) specify those product characteristics that are essential for safe and appropriate use.

    3.4) Critical Analysis of Design and Development

    Systematic critical analyses of design and development are made during appropriatephases according to planned arrangements:

    a) to evaluate the capacity of design and development results to attend to the requirements,and;

    b) to identify any problem and propose the necessary measures.

    Representatives of functions involved with design and development stage(s) that is(are)being critically analyzed are included among the participants in these critical analyses.Records are kept of critical analysis results and of any necessary measures (see C-II-4).

    Note: These analyses are normally coordinated with the project phases and include thedesign and development for the manufacturing process.

    3.5) Design and Development Verification

    Verification is carried out according to the planned arrangements (see C.3.1), in order toensure that the design and development outputs are attending to design and developmentinput requirements. Records are kept of verification results and of any necessary measures(see C-II-4).

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    23/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 23 OF 33

    3.6) Design and Development Validation

    Design and development validation is carried out as per planned preparations (see C.3.1), inorder to ensure that the resulting product is capable of attending to the requirements forthe specified application or intentional use, when known. Whenever practical, validation isconcluded prior to product delivery or implementation. Records are kept of validation resultsand of any necessary measures (see C-II-4).

    3.7) Control of Design and Development Changing

    Design and development changing are identified and records are maintained. The changesare critically analyzed, verified, and validated, as appropriate, and approved prior to theirimplementation. The critical analysis of design and development alterations includes theevaluation of the effect of said alterations on component parts and on the already deliveredproduct.

    Records are kept of the critical analyses results of alterations and of any necessarymeasures (see C-II-4).

    4) Purchasing4.1) Purchasing Process

    GE GEVISA S.A. ensures that the purchased product conforms with the specified purchasingrequirements. The type and the extent of control applied to the supplier and to thepurchased product depend on the effect of the purchased product on the subsequentexecution of the product or final product.

    GE GEVISA S.A. evaluates and selects suppliers based on their capacity to supply productsaccording to GE GEVISA S.A. requirements. Selection, evaluation, and reevaluation criteriaare established. Records are kept of the evaluation results and of any necessary measures,derived from the evaluation (see C-II-4).

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    24/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 24 OF 33

    4.2) Purchasing Information

    The purchasing information describes the product to be purchased and it includes,whenever appropriate, the requirements for:

    a) approval for the product, procedures, processes and equipment;

    b) personnel qualifications, and;

    c) quality management system.

    GE GEVISA S.A. ensures the purchasing requirement conformance specified prior to theircommunication to the supplier.

    4.3) Purchased Product Verification

    GE GEVISA S.A. establishes and implements inspection or other necessary activities toensure that the purchased product attends to the specified purchasing requirements.

    When the organization or its Customer intends to carry out an inspection of supplierinstallations, GE GEVISA S.A. declares the intended inspection measures and the productrelease method in the purchasing information.

    5) Production and Service Supply

    5.1) Control of Production and Service Supply

    GE GEVISA S.A. plans and carries out production and the supply of services under controlledconditions. Controlled conditions include, whenever applicable:

    a) the availability of information that describes product characteristics;

    b) the availability work instruction, whenever necessary;

    c) the use of appropriate equipment;

    d) the availability and use of devices for monitoring and measurement;

    e) the implementation of measurement and monitoring, and;

    f) the implementation of release, delivery and post-delivery activities.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    25/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 25 OF 33

    5.2) Validation of Production Processes and Service Supply

    GE GEVISA S.A. validates any production process and service supply in which the resultingoutput cannot be verified through subsequent monitoring and measuring. This includes anyprocess where the deficiencies are only apparent after the product has been in use, or theservice has been delivered.

    The validation demonstrates the capacity of these processes to achieve the planned results.

    GE GEVISA S.A. takes the necessary measures for these processes, including, whenapplicable:

    a) the criteria defined for critical analysis and process approval;

    b) equipment approval and personnel qualifications;

    c) use of specific methods and procedures;

    d) requirements for records (see C-II-4), and;

    e) revalidation.

    5.3) Identification and Traceability

    GE GEVISA S.A. identifies the product using the appropriate means over the period ofproduct execution.

    GE GEVISA S.A. identifies the product situation with regard to monitoring and measuringrequirements.

    When traceability is a requirement, GE GEVISA S.A. controls and registers the only productidentification (see C-II-4).

    5.4) Customer Property

    GE GEVISA S.A. takes care of customer property when it is under GE GEVISA S.A. control or

    being used by it. GE GEVISA S.A. identifies, verifies, protects and safeguards customerproperty supplied for use or incorporation into the product. If any customer property shouldbe lost, damaged or considered inappropriate for use, this shall be informed to theCustomer and records will be made (see C-II-4).

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    26/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 26 OF 33

    Note: The customers returnable package is included in this clause.

    5.4.A) Customer Production Tools

    Tools for production, testing, inspection, and equipment that belong to a customer shall b epermanently marked so that the owner identity is visually apparent and can be easilydetermined.

    5.5) Product Preservation

    GE GEVISA S.A. preserves product conformity during the internal process and its delivery tothe intended destination. This preservation includes identification, handling, packaging,storage and protection. Preservation is also applied to the parts that make up the product.

    5.6) Control of Measurement and Monitoring Devices

    GE GEVISA S.A. determines the measurements and monitoring to be carried out and thenecessary measurement and monitoring devices to show product conformity with specificrequirements (see 4.2.1).

    GE GEVISA S.A. establishes the processes to ensure that measurement and monitoring canbe carried out and are executed in a manner coherent with measurement and monitoring

    requirements.Whenever it is necessary to ensure valid results, the measurement device is:

    a) calibrated or verified at specified intervals or prior to use, and compared to traceablemeasurement standards and international and national measurement standards; when thisstandard does not exist, the basis used for calibration or verification shall be recorded;

    b) adjusted or readjusted, whenever necessary;

    c) identified to allow for the calibration situation to be determined;

    d) protected against adjustments that would invalidate the measurement result, and;

    e) protected from damage and deterioration during handling, maintenance and storage.

    Furthermore, GE GEVISA S.A. evaluates and registers the validity of prior measurementresults when to evidence that the device does not conform with the requirements. GEGEVISA S.A. takes the appropriate measure with the device and with any affected product.Records will be kept of the calibration and verification results (see C-II-4).

    Computer software capacity is confirmed to satisfy the intended application when used inthe measurement and monitoring of specified requirements. This is done prior to the initialuse and reconfirmed if necessary.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    27/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    11/22/2011 PAGE 27 OF 33

    VI) MEASUREMENT, ANALYSIS AND IMPROVEMENT

    1) Generalities

    GE GEVISA S.A. plans and implements the necessary processes for monitoring,measurement, analysis and improvement to:

    a) demonstrate product conformity,

    b) ensure quality management system conformity,

    c) continuously improve quality management system effectiveness, and

    This is to include the determination of applicable methods, including statistical techniquesand the extent in which they will be used.

    2) Measurement and Monitoring

    2.1) Customer Satisfaction

    As one of the measurements of the quality management systems performance, GE GEVISAS.A. monitors information related to customer perception as to whether GE GEVISA S.A.attended to customer requirements. The methods for obtaining and using this informationare determined.

    2.2) Internal Audit

    GE GEVISA S.A. carries out internal audits at planned intervals to determine whether thequality management system:

    a) conforms with the planned arrangements, to the ISO 9001:2008 requirements, and tothe quality management system requirements established by GE GEVISA S.A., and;

    b) is maintained and implemented effectively.

    An auditing program is planned, taking into account the situation and the importance of the

    processes and areas to be audited, as well as the results of previous audits. The auditingcriteria, scope, frequency and methods are defined. The choice of auditors and theexecution of the audits ensure objectivity and impartiality in the auditing process. Theauditors do not audit their own work.

    The responsibilities and requirements for audit planning and execution and reporting theresults and keep the records (see C-II-4) are defined in a documented procedure.

    The person responsible for the area to be audited ensures that the actions will be executed,without any undue delay, to eliminate any detected nonconformities and their causes. Thefollow-up activities include the verification of executed actions and the reporting of theverification results.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    28/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 28 OF 33

    2.3) Process Measurement and Monitoring

    GE GEVISA S.A. applies the appropriate methods for monitoring and, when applicable, formeasuring quality management system processes. These methods demonstrate thecapacity of the processes to achieve the planned results. When the planned results are notachieved, the corrections are carried out and the Corrective Actions are executed, asnecessary, to ensure product conformity.

    2.4) Product Measurement and Monitoring

    GE GEVISA S.A. measures and monitors product characteristics to verify if the product

    requirements are satisfied. This is carried out in the appropriate stages of the productexecution process according to the planned measure.

    Evidence of conformity with the acceptance criteria is kept. The records appoint theperson(s) authorized to release the product (see C-II-4).

    Product release and service delivery do not continue until all planned measures have beensatisfactorily concluded, unless these are approved in some other manner by a pertinentauthority and, whenever applicable, by the customer.

    3) Control of Nonconforming Products

    GE GEVISA S.A. ensures that products that do not conform with product requirements will beidentified and controlled to avoid their unintentional use or delivery.

    The controls and related responsibilities and authorities to handle nonconforming productsare defined in a documented procedure.

    GE GEVISA S.A. handles nonconforming products in one or more of the following ways:

    a) carrying out measures to eliminate the detected nonconformity;

    b) authorizing their use, release or acceptance under concession by a pertinent authorityand, when applicable, by the Customer;

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    29/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 29 OF 33

    c) carrying out an action to impede their original intended use or application.

    Records are kept concerning the nature of the nonconformities and any subsequent actionsthat were carried out, including the obtained concessions (see C-II-4).

    When the nonconforming product is corrected, it is rechecked to demonstrate conformitywith the requirements.

    When the products nonconformity is detected after delivery or during initial use, GE GEVISAS.A. takes the appropriate measures with regard to the effects, or potential effects, of thenonconformity.

    4) Data Analysis

    GE GEVISA S.A. determines, collects and analyzes the appropriate data to demonstratequality management system effectiveness and fitness and to evaluate where continuousimprovements of the quality management systems effectiveness can be carried out. Thisincludes the data generated as a result of monitoring and measurement as well as fromother pertinent sources.

    Data analysis supplies information related to:

    a) customer satisfaction;

    b) conformity with product requirements;

    c) characteristics and tendencies of processes and products, including opportunities forPreventive Actions, and;

    d) suppliers.

    5) Improvements

    5.1) Continuous Improvement

    GE GEVISA S.A. continuously improves quality management system effectiveness throughthe use of the quality policy, quality objectives, audit results, data analysis, corrective and

    Preventive Actions and critical analysis by management.5.2) Corrective Actions

    GE GEVISA S.A. carries out Corrective Actions to eliminate the causes of nonconformities soas to avoid their repetition. The Corrective Actions are appropriate for the effects of thenonconformities that are found.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    30/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 30 OF 33

    A documented procedure is established to define the requirements for:

    a) the critical analysis of the nonconformities (including customer complaints);

    b) the determination of nonconformity causes;

    c) the evaluation of the need for measures to ensure that the nonconformities will not occuragain;

    d) the determination and implementation of necessary measures;

    e) the registry of results from measures that were carried out (see C-II-4), and;

    f) the critical analysis of Corrective Actions that were carried out.

    5.3) Preventive Actions

    GE GEVISA S.A. defines the measures to eliminate the causes of potential nonconformities inorder to avoid their occurrence. The Preventive Actions are appropriate for the effects of thepotential problems.

    A documented procedure is established to define the requirements for:

    a) defining potential nonconformities and their causes;

    b) evaluating the need for measures to avoid the occurrence of nonconformities;c) defining and implementing necessary measures;

    d) recording the results of carried out measures (see C-II-4), and;

    e) critically analyzing Preventive Actions that were carried out.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    31/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 31 OF 33

    VII) APPENDIXQMS Matrix Gevisa x GEE procedures x WI ISMWI

    Gevisa Resp. GEE Services procedure Work Instructions - MotorsQM, QMS Routines Comite Scope (GEEQMS 1.0) QMS ISMWI-MGMT-00 Scope

    Normative Reference (GEEQMS 2.0)Terms, Definitions and Acronyms (GEEQMS 3.0)

    QM, QMS Routines Comite General Requirements (GEEQMS 4.1) QMS ISMWI-MGMT-03 General RequirementsQM, QMS Routines Comite Documentation Requirements - General (GEEQMS

    4.2.1) QMS ISMWI-MGMT-06 DocumentationRequirements - GeneralQM, QMS Routines Comite Quality Manual (GEEQMS 4.2.2) QMS ISMWI-MGMT-05 Quality System & Manual2.01 Noronha Document Control (GEEQMS 4.2.3) QMS ISMWI-MGMT-07 Document Control2.02 Marcel/ Maurcio Record Control (GEEQMS 4.2.4) QMS ISMWI-MGMT-08 Record Control2.13 Comite Management Commitment (GEEQMS 5.1)2.13 A Mendes/ R Costa/

    Fava Customer Focus (GEEQMS 5.2)2.13 A Mendes/ R Costa/

    Fava Customer Data Standard (GEEQMS 5.2.1)MQ Comite Quality Policy (GEEQMS 5.3) QMS ISMWI-MGMT-01 Quality Policy2.13 Comite Quality Objectives (GEEQMS 5.4.1) QMS ISMWI-MGMT-02 Quality Objectives2.13 Quality Quality Management System Planning (GEEQMS 5.4.2)MQ, rotinas SGQ Comite Responsibility, Authority and Communication

    (GEEQMS 5.5) QMS ISMWI-MGMT-15 Responsibility, Authorityand Communication2.13 Comite Management Review (GEEQMS 5.6) QMS ISMWI-MGMT-04 Management Review2.11 Geraldo/ Fernanda Provision of Resources (GEEQMS 6.1)2.11 Fernanda Competence, Awareness and Training (GEEQMS 6.2.2) QMS ISMWI-MGMT-13 Training2.11 Geraldo/ Fernanda Controlled Titles (GEEQMS 6.2.3) QMS ISMWI-MGMT-25 Controlled TitlesSGQ Fernanda Infrastructure and Work Environment (GEEQMS 6.3)

    Simone Real Estate Transactions (GEEQMS 6.3.1) QMS ISMWI-MGMT-16 Real Estate TransactionsMQ, rotinas SGQ Comite Technical Regulations & Standards (GEEQMS 7.0.1)

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    32/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 32 OF 33

    2.22 Nelson New Product Introduction GEEQMS 7.0.2 QMS ISMWI-MGMT-23 New Product Introduction2.09 Mancia Planning of Product Realization (GEEQMS 7.1)2.07 Nelson Lifecycle Control Board (GEEQMS 7.1.1)2.06/ 2.16 A Mendes/ R Costa/

    Fava Customer Related Processes (GEEQMS 7.2) QMS ISMWI-MGMT-19 Customer RelatedProcesses2.07 Ney Design and Development (GEEQMS 7.3)MQ, rotinas SGQComite Technical Design and Development Review (GEEQMS

    7.3.4)2.07 Ney Design and Development Validation (GEEQMS 7.3.6)

    2.07 Ney/ Nelson/Renato Product Safety (GEEQMS 7.3.8)

    2.08 Calipo/ Fonaro Purchasing (GEEQMS 7.4)2.09 Mancia Control of Production and Service Provision (GEEQMS

    7.5.1)2.09 Leite/ Detoni Work Instructions (GEEQMS 7.5.1.1)2.21 Leite/ Adaias Equipment Maintenance (GEEQMS 7.5.1.2)2.09/ 2.17 Leite/ Detoni Validation of Processes (GEEQMS 7.5.2) QMS ISMWI-MGMT-17 Validation of Processes2.09 Sneideris/ Evaldo Identification and Traceability (GEEQMS 7.5.3)2.6/ 2.16 Rubens/ Fava Customer Property (GEEQMS 7.5.4) QMS ISMWI-MGMT-20 Customer Property2. 10 Leite/ Erika Preservation of Product (GEEQMS 7.5.5)2.14 Mauricio F Control of Monitoring and Measuring Devices

    (GEEQMS 7.6) QMS ISMWI-MGMT-18 Control of Monitoring andMeasuring Devices2.12 Leite/ Detoni Measurement, Analysis and Improvement - General

    (GEEQMS 8.1)2.13/ 2.12 Antonio/ Fava Customer Satisfaction (GEEQMS 8.2.1) QMS ISMWI-MGMT-21 Customer Satisfaction2.03 Marcel Internal Audit (GEEQMS 8.2.2) QMS ISMWI-MGMT-10 Internal Auditing2.12 Leite/ Detoni Monitoring and Measurement of Processes (GEEQMS

    8.2.3) QMS ISMWI-MGMT-11 Monitoring andMeasurement of Processes2.09/ 2.12 Valmir Monitoring and Measurement of Product (GEEQMS

    8.2.4) QMS ISMWI-MGMT-12 Monitoring andMeasurement of Product and Services

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    33/57

    Uncontrolled when printed or transmitted electronically

    Campinas, Brazil

    GE PROPRIETARY

    Uncontrolled when printed or transmitted electronically

    UALITY

    QUALITY MANAGEMENT SYSTEM

    ISSUED:

    11/22/2011 SECTION CREPLACES

    08/09/2010 PAGE 33 OF 33

    2.04 Marcel/ Maurcio Control of Nonconforming Product (GEEQMS 8.3) QMS ISMWI-MGMT-14 Control of Non-Conforming Product

    2.12 Leite/ Detoni Analysis of Data (GEEQMS 8.4)2.12/ 2.05Leite/ Detoni Continuous Improvement (GEEQMS 8.5) QMS ISMWI-MGMT-22 ContinuousImprovement / Screening Matrix

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    34/57

    Uncontrolled when printed or transmitted electronically

    Quality at GE Energy

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    35/57

    Our Customer Commitments - 1 GEEQM Rev 2.0 October 2011

    Table of Contents GE Energy and Quality Visions 2

    Our Customer Commitments 3-5

    The Quality Organization and Policy 6-8 Quality Management System 9-11

    Key Business Processes 12-16

    Quality Control Mechanisms 17-18

    ISO Cross-Reference 19-22

    Summary and DisclaimerGE Energy is one of the world's leading suppliers of power generation and energy deliverytechnologies in all areas of the energy industryincluding coal, oil, natural gas, and nuclearenergy as well as renewable resources such as water, wind, solar, and alternative fuels.

    This manual provides an overview of the Quality Management System (QMS) that GE Energy hasestablished to meet our commitment to quality. It describes the organization's key businessprocesses as well as the mechanisms that have been put in place for effectiveness and controlof these processes. GE Energy audits, monitors, measures, and analyzes these processes toachieve results based on customer and regulatory requirements and continually improves theeffectiveness of its Quality Management System based on feedback.

    Scope: The GE Energy QMS applies across GE Energy and encompasses all of its products and services.

    The content of this Quality Manual is represented in formal procedures within GE Energys QualityManagement System. All GE Energy employees must comply with these procedural requirements.A listing of these procedures is available for all GE Energy employees in the GE Energy Procedures

    folder at http://library.ps.ge.com/quality/

    This Quality Manual is intended to provide general information regarding GE Energy's QualityManagement System. Not all of the processes described will necessarily apply to all customers.This Manual does not constitute any offer, obligation, or representation. GE Energy's responsibilities

    to its customer will be as set out in the contract between them.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    36/57

    2 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    GE Energy and Quality VisionsGE Energy Powering Potential

    As one of the largest energy companies in the world, we are in the business of powering potential.Powering potential for our customers, whose problems we solve. Potential for their consumers,

    whose lives we enrich and whose dreams we help realize. Potential for our people, the men and

    women around the world who are our most important resource. Potential for our shareholders,

    who are invested in the success of our company. And above all, powering potential for the earth,

    because without responsible energy there can be no potential for the future.

    Quality at GE Energy The Vision

    We are driven by a passion for delivering on every commitment. We are dedicated to providing our

    customers the highest quality offerings with unparalleled customer service and responsiveness. We

    are committed to working through any problem in an open and honest manneralways with

    unyielding integrity.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    37/57

    Our Customer Commitments - 3 GEEQM Rev 2.0 October 2011

    Our Customer CommitmentsCustomer Satisfaction Our Passion, Our Commitment

    GE Energy is passionately committed to driving customer satisfaction with all products andservices we offerand building long-term loyalty by working with our customers to help

    them be successful.

    Growth Values

    External Focus

    Defines success through the customers eyes

    In tune with industry dynamics sees around corners

    Clear Thinker

    Seeks simple solutions to complex problems decisive

    Focus communicates clear and consistent priorities

    Imagination

    Generates new and creative ideas open to change

    Resourceful displays courage and tenacity

    Inclusiveness

    Teamwork respects others ideas and contributions

    Creates excitement and drives engagement

    Expertise

    Domain depth credibility built from experience

    Continuously develops self loves learning

    Always with unyielding integrity!

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    38/57

    4 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    GE Energy conducts two types of NPS surveys:

    Relationship NPS - Conducted periodically on a sample basis to gauge

    overall customer satisfaction with GE Energy

    Transactional NPS Ongoing surveys to gauge customer satisfaction on

    specific events or projects, such as an outage, part sale, or repair

    For each type of NPS survey, the Quality teams analyze the results

    (including comments) to identify key areas for improvement

    These teams work with regional, functional, and executive leadership teams

    to develop an integrated action plan to drive impactful improvement

    Action plans and subsequent results are reviewed routinely at all levels

    within the organization

    Net Promoter Score (NPS)

    On a scale of 0 to 10, how likely would you be to recommend GE Energy?

    0 1 2 3 4 5 6 7

    Not atall likely

    Neutral Extremelylikely

    8 9 10

    Detractors Passives Promoters

    Net

    PromoterScore

    % Promoters(9s and 10s) % Detractors(0 through 6)=

    Net Promoter is a registered trademark of Bain & Company, Inc.,Fred Reichheld and Satmetrix Systems, Inc.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    39/57

    Our Customer Commitments - 5 GEEQM Rev 2.0 October 2011

    Customer Requirements

    GE Energy understands customer requirements associated with its products and services

    including those associated with their delivery and ongoing support.

    This understanding will come from what is stated in the contract, defined by applicable

    statutory and regulatory authorities, and the customers intended use of the product or service.

    GE Energy has established channels for effective communication of customer requirements

    as well as changes thereto throughout its organization.

    Regulations and Standards

    Ensuring compliance with the applicable Regulations and Standards for every region where its

    products and services are sold is of paramount importance to GE Energy.

    Management teams at all levels in the business are engaged in a continually improving

    process of reviewing the regulatory landscape, understanding technical applicability, training,

    auditing, and rigorous adherence to policies and procedures with the ultimate goal of ensuring

    that products and services are compliant with the applicable laws and regulations of the

    region and locally where they are being sold.

    GE Energy understands that its customers count on GE to provide products that are

    compliant and is committed to meeting that expectation.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    40/57

    6 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    QualitySupport FunctionsProduct Lines

    GE EnergyPresident & CEO

    The Quality OrganizationMore detailed organization structure

    documentation is available upon request.

    Quality Policy

    Every GE Energy employee must be committed to:

    Passionately driving customer satisfaction with all products and services we provide, and

    building long-term loyalty by partnering with customers to help achieve their success.

    Ensuring strict compliance with laws and regulations pertaining to the quality, safety and

    performance requirements in every country where GE Energys products and services

    are offered.

    Sustaining continuous improvement in the effectiveness of GE Energys Quality

    Management System.

    These commitments will be met with the highest integrity, through clearly documented

    quality objectives, routine quality management reviews and an all-encompassing Quality

    culture that employs the Lean Six Sigma methodology.

    The Quality Organizationand Policy

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    41/57

    Our Customer Commitments - 7 GEEQM Rev 2.0 October 2011

    Managements Commitment to Quality

    Executive leadership at all levels of GE Energy deliver on their commitment to the successful

    development and implementation of the QMS and continually improve its effectiveness by:

    Deploying the Energy Quality Policy

    Establishing measurable quality objectives that enhance customer satisfaction

    Communicating to the business the importance of meeting customer and regulatory requirements

    Conducting management reviews at appropriate levels within the organization

    Ensuring the business has all of the resources it needs to achieve the goals of the QMS

    Quality is everyones responsibility!

    CEO Metrics The Big Ys

    What are the Big Ys?

    Quality Systems and Documentation

    Fulfillment

    Issue Resolution

    Billing Quality

    New Product Introduction (NPI) Execution

    The Ys are determined through customer feedback and defect trends

    They have operational targets and Lean Six Sigma projects assigned to them

    They are tracked through weekly team reviews, monthly CEO reviews, quarterly

    operational reviews, and annual progress reports and validation

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    42/57

    8 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    Review rhythm how we track ourselves

    Customer quality and regional reviews

    Customer overview and regional outlook

    Customer issues

    12-month outlook Projected problem areas

    Structural impediments to growth

    Receivables collections/past dues

    NPI reviews

    Product line updates

    Financials: orders, sales, and costs

    Status of actions to improve cycle time,

    commercialization effectiveness,cost, and sourcing

    Standing leadership tollgate review

    CEO metric reviews

    Reviewing the Big Ys

    Business deep dives

    Focused improvement areas Communicating data status and trends

    driving personal accountability

    Process improvement reviews

    Financial accountability

    Quarterly review of all active projects

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    43/57

    Our Customer Commitments - 9 GEEQM Rev 2.0 October 2011

    Quality Management SystemFocusing on the Basics for a Strong QMS

    Document Control

    With respect to controlled documents, GE Energy defines, establishes, and maintains document

    control methods to enable users to readily identify andaccess the current revision of all such

    documents. Document management systems store currentversionsof such documents by

    unique identifier and revision level.

    Controlled documents need to be:

    Legible

    Identifiable

    Retrievable

    A documented procedure defines controls for both internal and externally supplied controlled

    documents that include:

    Identification Retrieval

    Storage Retention time

    Protection Archival anddisposition

    Access authorization

    The requirements regarding Document Control have been defined in procedure GEEQMS 4.2.3 Document Control.

    High QualityDocumentsand Drawings

    Trainingand Staffing

    Auditing andMonitoring

    ContinuousImprovement

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    44/57

    10 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    Training and People

    GE Energy assigns resources to:

    Plan, develop processes, and deliver products to meet or

    exceed customer requirements

    Maintain and continually improve the quality management

    system, and

    Enhance delivered quality and customer satisfaction

    GE Energy managers are committed to deploying personnel

    that are proficient in the procedures and technical capabilities

    required for the activities they are assigned.

    GE policies regarding Employee Health and Safety and

    Environmental Protection define implementation of requirements

    for adequate and safe facilities and plant activities.

    Auditing

    Focus for Internal Audits

    Compliance with GE Energys Quality Management System requirements

    Test effectiveness of process: does the process work as intended and are

    results achieved?

    Planning based on status and importance of the process as well as results of

    previous audits

    Audit results, including timeliness and effectiveness of Corrective and Preventive

    Actions, are reviewed by management at all levels of the organization

    Audit Mechanisms

    Local audits: for high frequency, detailed process assessments

    Independent internal audits: full-time and volunteer auditors

    driving cross-organizational learning

    Customer and registrar audits

    Audits are performed to several applicable industry standards.

    Certification details are available upon request.

    The requirements regarding Internal Audit have been defined in

    procedure GEEQMS 8.2.2 Internal Audit.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    45/57

    Our Customer Commitments - 11 GEEQM Rev 2.0 October 2011

    Monitoring and Measurement

    Organizations within GE Energy define and implement monitoring and measurement needed

    to demonstrate conformity of product and the quality management system, and to identify

    opportunities for improvement by:

    Setting specific and measurable quality objectives and verifying that these objectives arebeing achieved within the specified timeframes

    Verifying that product requirements are met at the appropriate stages of production and/or

    service provision through in-process inspection and testing

    Continuous Improvement

    GE Energy continually improves the effectiveness of its QMS through:

    quality policy

    quality objectives

    collection and analysis of nonconformance data

    determination of root cause

    corrective and preventive actions

    management reviews

    GE Energy utilizes Lean Six Sigma methodologies and tools along with

    traditional quality management activities to drive sustainable improvements.

    Corrective and Preventive Action

    In order to drive sustainable Corrective and Preventive Action, GE Energy has established and

    maintains a process for Continuous Improvement of its products, services, and processes. This

    process defines requirements for:

    Screening nonconformances, including customer complaints, audit findings, and results of

    internal and external quality control mechanisms

    Analyzing and determining the causes of the nonconformances Evaluating the need for corrective and preventive actionto prevent recurrence of the

    nonconformances and to prevent occurrence in related areas

    Determining and implementing the actions needed

    Verifying the effectiveness of the actions taken

    The requirements regarding Corrective Action and Preventive Action have been defined in

    procedure GEEQMS 8.5 - Continous Improvement.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    46/57

    12 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    PurchasingSpecifications

    FINANCIALMANAGEMENT

    Management Processes

    STRATEGICPLANNING

    HUMANRESOURCE

    MANAGEMENT

    Support Processes

    SECURITY OFPERSONNEL,

    FACILITIES ANDEQUIPMENT

    QUALITYMANAGEMENT

    INFORMATIONMANAGEMENT

    Business Processes

    NEW PRODUCT INTRODUCTION

    Customer

    Customer

    SalesManager

    Partner

    Suppliers BUILD PRODUCT/DELIVER SERVICE

    PURCHASING AND

    SUPPLIER MANAGEMENT

    ORDER TO REMITTANCE

    CONSTRUCT

    PROPOSALS AND

    SUPPORT SALES

    TECHNICAL

    CUSTOMER

    SUPPORT

    INQUIRY TO ORDER

    New ProductsNew Products New ProductsMarket Feedback

    Proposal

    CommercialAgreements

    Signed Contract

    Build PlanPurchase Order

    Product/Service

    Request for Tender

    Product/ServiceDefinition

    Supplier PurchasingContracts

    WBS (WorkBreakdown Structure)

    Product/ServiceDelivery

    SupportRequest

    Key Business Processes

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    47/57

    Our Customer Commitments - 13 GEEQM Rev 2.0 October 2011

    Sales

    Marketing

    Commercial Operations

    Risk Management

    Pricing

    Engineering

    Sourcing

    Production

    Quality

    Finance

    Contract Management

    EHS

    Owner Contributor

    OpportunityIdentification

    OpportunityScreening

    ProposalDevelopment

    SubmissionApproval

    NegotiatedTerms Approval

    Hand-offto OTR

    Inquiry-to-Order (ITO)

    Process Phase

    Risk Review R0 R1 R2 R3

    1 2 3 54

    Inquiry-to-Order (ITO)

    Inquiry-to-Order Process

    Inquiry-to-Order (ITO) at GE Energy provides a standard and consistent process for developing

    commercial opportunities. GE Energy follows a risk review process to balance customer

    requirements with GE capabilities and the ability to manage any identified risk.

    The ITO process is divided into 5 phases:

    Opportunity identification and screening

    Opportunity screening and bid/no bid decisions

    Quote and proposal development, submission approval

    Negotiated price and terms approval

    Hand-off to the Order-to-Remittance process

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    48/57

    14 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    Project Management

    Engineering

    Sourcing

    Production

    Finance

    Quality

    Owner Contributor

    ResourceAllocation

    Procurement

    ProductRealization Fulfilment

    Receipt ofPayment

    Order-to-Remittance Process

    1 2 53 4

    Order-to-Remittance (OTR)

    Order-to-Remittance Process

    The Order-to-Remittance (OTR) process covers the execution of a sales contract from the time

    that the order is initiated to the time that final payment is received.

    The OTR process is divided into 5 phases:

    Resource allocation - that includes detailed technical definition as well as planning and

    scheduling of equipment, material and human resources

    Procurement - of material resources to complete the order

    Product realization - where in acquired resources are transformed into final product

    Fulfillment - where in the product is delivered to the customer specified location and

    the terms of the contract are fulfilled

    Receipt of Payment

    Throughout the process, control points are in place to verify and validate whether customer

    and regulatory requirements are met.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    49/57

    Our Customer Commitments - 15 GEEQM Rev 2.0 October 2011

    Product Management

    OpportunityIdentification

    ProductOptions

    ConceptualDesign

    PreliminaryDesign

    DetailDesign

    Initial ProductionFactory Test

    Field ValidationSerial Production

    Measurementand Feedback

    Marketing

    Program Management

    Engineering

    Sales

    Production

    Communications

    Sourcing

    Services

    Quality

    Finance

    Legal

    Owner Contributor

    New Product Introduction Process

    71 2 5 6 83 4

    New Product Introduction (NPI)

    New Product Introduction Process

    New Product Introduction spans the entire product development cycle from the identification

    of a new business opportunity to the post commercial introduction of the new product.

    Execution teams exist for every defined program. Teams are responsible for achievement of allcommercial and technical product objectives, including:

    Meeting the product development and marketplace introduction schedules

    Product performance, program cost, product cost, and financial objectives

    Validation and verification performed throughout the process to confirm

    product meets requirements

    Management reviews are utilized to continuously assess if the program is

    fulfilling requirements.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    50/57

    16 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    Supplier Approval Process

    Approved to do business with GE

    Quality

    EHS/Labor

    Finance

    Technical Capability

    Supplier Quality

    GE Energy expects the same high quality standards from our external suppliers as we produce internally.

    GE Energys Sourcing function has established rigorous processes around supplier quality and oversight

    to enable and verify this quality level for all sourced components and services.

    Qualification Process

    Released for Production

    Product Compliance

    Process Capability

    Surveillance Process

    Sustaining Quality

    Monitoring

    Auditing

    Mutual Non-Disclosure Agreement Protects proprietary information for both parties

    Integrity Acknowledgement Suppliers commitment to comply with GEs requirements

    EHS (Environmental, Health, Safety) Questionnaire Provides basic EHS data for evaluation of EHS practices

    General Supplier Profile Basic data to support quality, financial viability,

    and overall risk

    Critical hardware requires Characteristic accountability

    Product quality plan, manufacturing process plan

    Process risk (FMEA)

    Team approvals required

    Supplier quality engineer, design engineer,materials engineer

    Periodical Surveillance Required Quality systems assessment (if not ISO certified)

    Product audit - compliance to technical requirements

    Process audit - compliance to special processes Additional audit/inspection requirements defined by:

    Customer requirements, risk, supplier performance, defects

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    51/57

    Our Customer Commitments - 17 GEEQM Rev 2.0 October 2011

    Quality Control MechanismsRecord Control

    GE Energy defines, establishes, and maintains records to provide evidence of conformityto requirements and the effectiveness of their QMS

    Records need to be:

    Legible

    Identifiable

    Retrievable

    Documented procedures define controls for:

    Identification

    Storage

    Protection

    Retrieval

    Retention time

    Disposition of records

    The requirements regarding Record Control have been defined in procedure GEEQMS 4.2.4 Record Control.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    52/57

    18 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    Control of Monitoring and Measuring Devices

    GE Energy utilizes a wide variety of Measuring and Test Equipment (M&TE) to inspect and

    measure product quality in development, production, and service work. This includes

    measuring instruments, software, measurement standards, reference material, and

    auxiliary apparatus or combination thereof.

    The M&TE is calibrated at specified intervals or prior to use against measurement standards

    traceable to NIST or equivalent international or national standards. If no such standards exist,

    the basis used for calibration is recorded. The calibration status is visually identifiable and a

    register is maintained of all M&TE requiring calibration. MT&E is protected from damage and

    deterioration during handling, maintenance, and storage.

    When M&TE is found not to conform to requirements or an out of tolerance condition

    occurs, appropriate actions are taken.

    Control of Nonconforming Product

    A product or service is considered nonconforming when it does not meet specified

    requirements. Once identified, nonconformances are recorded and dispositioned

    through GE Energys quality systems.

    Recorded nonconformances are reviewed regularly for the purpose of understanding

    the defect and providing a basis for continuous improvement.

    The requirements regarding Control of Nonconforming Product have been defined inprocedure GEEQMS 8.3 Control of Nonconforming Product.

    Quality at GE Energy The Vision

    We are driven by a passion for delivering on every

    commitment. We are dedicated to providing our

    customers the highest quality offerings with

    unparalleled customer service and responsiveness.

    We are committed to working through any problem

    in an open and honest manneralways with

    unyielding integrity.

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    53/57

    Section ISO Mandatory Procedure

    1 Scope

    1.1 General GEEQMS 1.0-Scope

    1.2 Application GEEQMS 1.0-Scope

    2 Normative Reference GEEQMS 2.0-Normative Reference

    3 Terms, Definitions and Acronyms GEEQMS 3.0-Terms, Definitions and Acronyms

    4 Quality Management System

    4.1 General Requirements GEEQMS 4.1-General Requirements

    4.2 Documentation Requirements

    4.2.1 General GEEQMS 4.2.1-Documentation Requirements-General

    4.2.2 Quality Manual GEEQMS 4.2.2-Quality Manual

    4.2.3 Control of Documents GEEQMS 4.2.3-Document Control

    4.2.4 Control of Records GEEQMS 4.2.4-Record Control

    5 Management Responsibility

    5.1 Management Commitment

    a.GEEQMS 5.5-Responsibility, Authority and Communication;section 4.1.2.d

    b. GEEQMS 5.3-Quality Policy

    c. GEEQMS 5.4-Planning; section 4.1

    d. GEEQMS 5.6-Quality Management Review

    e.GEEQMS 5.5-Responsibility, Authority and Communicationsection 4.1.2.c

    5.2 Customer FocusGEEQMS 7.2-Customer Related ProcessesGEEQMS 8.2.1-Customer Satisfaction

    5.3 Quality Policy GEEQMS 5.3-Quality Policy

    5.4 Planning

    5.4.1 Quality Objectives GEEQMS 5.4-Planning

    5.4.2 Quality Management System Planning GEEQMS 5.4-Planning

    Our Customer Commitments - 19 GEEQM Rev 2.0 October 2011

    The numbering structure of the procedures in GE Energys Quality Management System follows the ISO

    9001 standard. Refer to table 1 for a cross-reference of ISO 9001:2008 sections to corresponding

    GE Energy QMS procedures.

    ISO Cross-Reference

    Table 1

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    54/57

    20 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    Section ISO Mandatory Procedure

    5.5 Responsibility, Authority and Communication

    5.5.1 Responsibility and Authority GEEQMS 5.5-Responsibility, Authority and Communication

    5.5.2 Management Representative GEEQMS 5.5-Responsibility, Authority and Communication

    5.5.3 Internal Communication GEEQMS 5.5-Responsibility, Authority and Communication

    5.6 Management Review

    5.6.1 General GEEQMS 5.6-Quality Management Review

    5.6.2 Review Input GEEQMS 5.6-Quality Management Review

    5.6.3 Review Output GEEQMS 5.6-Quality Management Review

    6 Resource Management

    6.1 Provision of Resources GEEQMS 4.1-General Requirements; section 4.2.4

    6.2 Human Resources

    6.2.1 General GEEQMS 6.2.2-Competence, Awareness and Training

    6.2.2 Competence, Awareness and Training GEEQMS 6.2.2-Competence, Awareness and Training

    6.3 Infrastructure GEEQMS 6.3-Infrastructure and Work Environment

    6.4 Work Environment GEEQMS 6.3-Infrastructure and Work Environment

    7 Product Realization

    7.1 Planning of Product Realization GEEQMS 7.1-Planning of Product Realization

    7.2 Customer Related Processes

    7.2.1Determination of RequirementsRelated to the Product

    GEEQMS 7.2-Customer Related Processes

    7.2.2Review of Requirements Related tothe Product

    GEEQMS 7.2-Customer Related Processes

    7.2.3 Customer Communication GEEQMS 7.2-Customer Related Processes

    7.3 Design and Development

    7.3.1 Design and Development Planning GEEQMS 7.3-Design and Development

    7.3.2 Design and Development Inputs GEEQMS 7.3-Design and Development

    7.3.3 Design and Development Outputs GEEQMS 7.3-Design and Development

    7.3.4 Design and Development Review GEEQMS 7.3.4-Technical Design and Development Review

    7.3.5 Design and Development Verification GEEQMS 7.3-Design and Development

    7.3.6 Design and Development Validation GEEQMS 7.3.6-Design and Development Validation

    7.3.7Control of Design and DevelopmentChanges

    GEEQMS 7.3-Design and Development

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    55/57

    Our Customer Commitments - 21 GEEQM Rev 2.0 October 2011

    Section ISO Mandatory Procedure

    7.4 Purchasing

    7.4.1 Purchasing Process GEEQMS 7.4-Purchasing

    7.4.2 Purchasing Information GEEQMS 7.4-Purchasing

    7.4.3 Verification of Purchased Product GEEQMS 7.4-Purchasing

    7.5 Production and Service Provision

    7.5.1Control of Production and ServiceProvision

    GEEQMS 7.5.1 - Control of Production and Service Provision

    7.5.2Validation of Processes for Productionand Service Provision

    GEEQMS 7.5.2-Validation of Processes

    7.5.3 Identification and Traceability GEEQMS 7.5.3-Identification and Traceability

    7.5.4 Customer Property GEEQMS 7.5.4-Customer Property

    7.5.5 Preservation of Product GEEQMS 7.5.5-Preservation of Product

    7.6Control of Monitoring andMeasuring Devices

    GEEQMS 7.6-Control of Monitoring and Measuring Devices

    8 Measurement , Analysis and Improvement

    8.1 General

    a. GEEQMS 8.2.4-Monitoring and Measurement of Product

    b. GEEQMS 8.2.2-Internal Audit

    c. GEEQMS 8.5-Continuous Improvement

    Note determination of statisticaltechniques and extent of their use

    GEEQMS 8.4-Analysis of Data

    8.2 Monitoring and Measurement of Processes

    8.2.1 Customer Satisfaction GEEQMS 8.2.1-Customer Satisfaction

    8.2.2 Internal Audit GEEQMS 8.2.2-Internal Audit

    8.2.3Monitoring and Measurement ofProcesses

    GEEQMS 8.2.3-Monitoring and Measurement of Processes

    8.2.4Monitoring and Measurement ofProduct

    GEEQMS 8.2.4-Monitoring and Measurement of Product

    8.3 Control of Nonconforming Product GEEQMS 8.3-Control of Nonconforming Product

    8.4 Analysis of Data GEEQMS 8.4-Analysis of Data

    8.5 Improvement

    8.5.1 Continual Improvement GEEQMS 8.5-Continuous Improvement

    8.5.2 Corrective Action GEEQMS 8.5-Continuous Improvement

    8.5.3 Preventive Action. GEEQMS 8.5-Continuous Improvement

  • 5/27/2018 0.6. Quality Manual - GE Brazil

    56/57

    22 - GE Energy and Quality VisionsGEEQM Rev 2.0 October 2011

    GE Energy QMS procedures beyond ISO 9001GE Energy chooses to utilize the rigor of its Quality Management System to control key aspects of its

    business