Finite Element Analysis Portfolio Professor Magd Abdel Wahab
054-Emad Magd plit Type AC
description
Transcript of 054-Emad Magd plit Type AC
Patterson Pump Company Ltd
Date: 06-04-2015 Ref.: IGEQ/2015/054
To : Eng. Emad MagdSubject: Supply & Install AC-Split Type/Window for Villa Al-AssiriDear Sir,
Greetings.
With reference to the above subject and project we are pleased to submit our offer as per the scope mentioned below.Please see attached BOQOption 1
DescriptionNos.Unit PriceAmountBrand
15 Tr Split Type AC53,500.0017,500.00Gree Thailand
2Tr Split Type AC84,200.0033,600.00Gree Thailand
35Tr Split Type AC24,900.009,800.00Gree Thailand
4Tr Split Type AC25,400.0010,800.00Gree Thailand
55 Tr Window Type72,100.0014,700.00Gree Thailand
TOTAL86,400.00 QR
Option 2DescriptionNos.Unit PriceAmountBrand
15 Tr Split Type AC54,900.0024,500.00Emadi General
2Tr Split Type AC85,200.0041,600.00Emadi General
35Tr Split Type AC26,000.0012,000.00Emadi General
4Tr Split Type AC26,900.0013,800.00Emadi General
55 Tr Window Type72,100.0014,700.00Emadi General
TOTAL106,600.00 QR
VALIDITY Our offer is valid for your acceptance for a period of one week from the date of our offer and subject to written confirmation thereafter.PAYMENT TERMS:
-50% Advanced Payment
-50% after installationExecution:
-Execution period will be as per project scheduled time.
Warranty:
The equipment would carry warranty of 5 years from the date of commissioning against manufacturing defects only in Doha.
TERMS AND CONDITION:1. The prices quoted for equipment/ materials are based on the makes specified against each. Should an instruction be received at a later stage for a different make equipment/ material (than the one offered) the difference in prices between the two makes will be claimed by International Group. 2. Any hold ups/ stoppages in the works for any length of period after mobilization due to non-availability of fronts to International Group will be considered as Idling Time3. Proper lighting and working conditions shall be provided by the client/ Main contractor.
4. Water, electricity, store, site office shall be provided free of cost.
5. Any safety clearances shall be achieved by Client/ Contractor before commencing of jobs.6. Any excavation, backfilling & civil works are not included.
We trust our proposal will meet your requirement and would be glad to provide any further information on request.
Your acceptance/approval on this subject matter will be highly appreciated.Best Regards.For INTERNATIONAL GROUP
Eng. Amr Fatouh
Executive Manager