Transcript of 05 ERP Scope of Work

Page 1: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 1/14

 

uthorised Partner 

ERP Solutions Provider for Egypt and Middle-East

Page 2: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 2/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

ii | P a g e  

Masrur Group LTD Copyright © All Rights ReservedRegistration Number 4138904 IKONSOFT

IKONSOFT

ERP.05 ERP SCOPE OF WORK

<ProVision> 

<Details of Works & Services> 

Author: <Project Manager> 

Creation Date: 22nd December 2014

Last Updated: 5th January 2015

Document Ref: <Provison 150115> 

Version: Version 1.3

 Approvals: 

<Project Director>  Dr. Syed Masrur

< Project Manager>  Mr. Mohamed Bakry

<Solution Partner> Mr. Mohamed Shafiq / Mohamed Magdy

Copy Number __3___

Page 3: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 3/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

iii | P a g e  

Masrur Group LTD Copyright © All Rights ReservedRegistration Number 4138904 IKONSOFT

Document Control

Change Record

Date Author Version Change Reference

8-Jun-99 <Author>  Version

3.5

No Previous Document

Reviewers

Name Position

Distribution

Copy No. Name Location

Library Master Project Library

Project Manager

Note To Holders:

If you receive an electronic copy of this document and print it out, please write your

name on the equivalent of the cover page, for document control purposes.

If you receive a hard copy of this document, please write your name on the front cover,for document control purposes.

Page 4: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 4/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

iv | P a g e  

Masrur Group LTD Copyright © All Rights ReservedRegistration Number 4138904 IKONSOFT

Contents (Technical Proposal) 5 of 7Document Control .................................................................................................................. iii 

Detail of Software Development Life Cycle (SDLC) Implementation: ............................ 5 Details of Work and Services .............................................. ........................................... ....... 6 

SCOPE OF WORK ...................................................................... .......................................... 10 

Pricing Structure ................................................................................................................... 12 

Partner Contact Details ......................................... ........................................... .................... 13 

Page 5: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 5/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

5 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

Detail of Software Development Life Cycle (SDLC) Implementation:

IKONSOFT SDLC for ERP project are as follows:

  Requirement Analysis - by Project Manger

o  Define Scope -> take client Approval

o  Functional Diagram

o  DFD

  Team building containing Project Manager, Coder, Designer, Tester & client

representative as per project plan in Exhibit A; Project Scopes and Specifications.

  Timeline and Milestone setting

  Module Distribution among the team members

  Define Test cases

  Designing

o  IKONSOFT e Design

  ERD

  UML

  SQL

o  GUI

  Theme Design, Possible screens & layout of Forms & pages and

take client Approval

  HTML/CSS conversion

 

Client Side Scripting

  Client Approval

  Coding

o  Framework ,CMS & Tools selection

o  Project Integration with Framework

o  Define Classes required for the project with functions By senior Team

member

o  Coding as per assigned task

o  Testing each module

  Testing as per test cases

  Deployment

  Documentation

Some supporting tools we use to make the team dynamic:

  SVN (Version control)

  Testing Tools (customized open-source tools)

  Project Management Tools

For each phase, we keep the document both soft and hard copies in the project file box.

Page 6: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 6/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

6 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

Details of Work and Services 

  Objectives

  Validate the perimeter and the objectives of the Customer,

  Build the detailed planning of the project,

  Finalize the structure of the project team, and in particular to identify the super

users and champions trades,

  Define the structure of communication (frequency of the meetings of the joint

team and the steering committee)

  Launch the project (kick-off)

  Define the strategies of interface and recovery,

  Define the procedure of management of the problems, risks and requests for change,

  Develop the target process models which will be used as support with the phase of rapid

prototyping

  Prepare the environment and the prototyping sessions

  Deliverables

 

Project Team  Communication Structure

  Issues, Risks and Change Requests Management Procedure

  Project Plan

  Charter Document

  Kick-off Presentation

  MOM Template

  BR010 Detailed Business requirement document

  TA040 Application Architecture

Page 7: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 7/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

7 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

  Design Phase

  Objectives

The phase of design begins with the realization from a prototype so as to train super users and to define

the target solution quickly. It aims at:

  To define the needs detailed for the Customer starting from the models

process identified in phase of Definition,

  To train super the users at the time of the phase of rapid prototyping,

  To carry out the mapping detailed needs with the functionalities for ERP

Application,

 

To carry out the meetings of convergence (CRP: Conference Room Pilot) tovalidate the mapping. 40% must be covered after CRP1 and 80% after CRP2.

The 20% remainder will be refined during the phase of Realization.

  To write the functional specifications for the interfaces, and possible

resumptions of data and extensions

  To identify the future users and functional and technical administrators

  To develop target architecture

 

Deliverables  BR010 Detailed Business Requirement Mapping

  Data Migration Strategy.

o  UML Activity

  High Level Diagram

  ERD

  Use cases

  Activity Diagram

  Class Diagram

  Sequences Diagram

o  Prototyping and Screen Mocks Up

Page 8: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 8/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

8 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

  Build Phase

  Objectives

  The phase of Build aims at:

  Carrying out the target parameter setting on the basis of receipt

  To define the roles and responsibilities,

  To carry out the unit tests, integration tests and benchmarks to make sure that

the solution meets the target needs well,

  To write the training manuals and handbooks of procedures

  To write the checklists in forecast of starting in production

  To implement target architecture

  To begin the resumption of the data

  Deliverables

  Setup Document BR100

  Security Profiles BR110

  Training manual

  Test (Scenario , Scripts and Cases)

  UAT (User Acceptance Test)

  Transition Phase

  Objectives

  The phase of transition aims at:

  To carry out the receipt on the copy of the base of production,

  To continue the resumption of the data,

  To train super users,

  To transfer the instruction manuals, the training manuals, the Meta-link access

  To start the system in production

 

Deliverables

  Setup updates for PROD instance

  Training

  Go-live plan

Page 9: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 9/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

9 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

  Go-Live Phase

  Objectives

The aim of this phase of assistance is:

  To assist the Customer in the use of the solution in production and in

particular at the time of the fences of period,

  To take part in the resumption of the data in production,

  To take part with the execution of the interfaces in production,

  To assist the Customer in the installation of an organization responsible for the

functional and technical administration of the solution.

 

Deliverables

  Project Completion procedures

  System taken in hand by the administrators and users

  Training

  The purpose of the training services is to enable First party end users to use the

application. Training activities are customized to serve this purpose and do not

cover general product skills or official product courses.

  Representatives from IT and each Line of Business must attend these training

sessions to be able to train the trainer after the training services completion.

  The following lists the scope training services.

Role Description - (Duration in days):

  End-user Instructs attendees on how to use the application screens. (2 days)

  Operations Administrators Instructs attendees on how to perform regular

operations on the production environment, Covering (2 days):

Starting and stopping servers/serviceso  Backup and restore

o  Basic troubleshooting Activities

  Code Handover (2 days)

  Explaining the High level architecture

  Explaining the IKONSOFT e structure

  Explaining the source code structure & packages

Page 10: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 10/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

10 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

SCOPE OF WORK

ERP Software Platform Development

The product include (ERP applications, Web portal and mobile interface) to cover the scope of

work mentioned in the below, and the interface will be in English Language and any Bi-lingual

requirements for additional Languages, including in Arabic is to be made through change order

request and subject to additional charges per work day.

Product Work Requirements:

No. Tasks Check-List

1. The operating system and version  / 

1. 

Windows1.1.1. XP

1.1.2. Windows7

1.1.3. Windows 8

1.2.  Linux

1.2.1. Centos/Fedora/Ubuntu

1.3.  Mac

2.  Browsers Version of all Operating System  / 

2.1.  HTML5 compliant browsers

2.1.1. 

IE8/IE9/IE102.1.2. FF

2.1.3. Opera12

2.1.4. Safari 6

2.1.5. Chrome

Page 11: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 11/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

11 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

No. Tasks Check-List

The application development and business intelligence tools and version in addition to the

required license if needed.(More Explanations) Business intelligent tools is required to be

mentioned (After analysis of the most suitable Business Intelligence tools subject to the Clients

preference of open source or licensed tools) 3.  Design  / 

3.1 software

3.1.1 Adobe Package

3.1.2 MS Visio – UML

3.2 Web portal

3.2.1 Adobe Package

3.2.2 Pencil Editor for Mock-ups

3.2.3 Endavour

3.3 Apps

3.3.1 Adobe Package

3.3.2 Pencil Editor for Mock-ups

4.  Development    / 

4.1Software 

4.1.1 C#

4.1.2 Oracle

4.1.3 .Net

4.1.4 Open Source

4.2 Web portal

4.2.1 PHP/HTML5/CSS3/JS/JQUERY

4.2.2 IDE: DW/NetBeans/Eclipse

4.2.3 Twitter Bootstrap4.2.4 Oracle/MSSQL

4.2.5 Open Source

4.3 Apps – development based on Hybrid environment  

4.3.1 JQM/EXT JS/PhoneGap/Sencha/Angular JS/Backbone JS

4.3.2 IndexedDB/Web Storage/NodeJS

4.3.3 PhoneGap / Marmalade/ Titinum

5.  Deployment    / 

5.1 software

5.1.1 Linux / windows server

5.1.2 Apache / IIS

5.1 .3Tom Cat / Java5.1 .4 VMW / Veem/ e-oracle server

5.2 Web portal (Hosting Environment)

5.2.1 ASP.NET

5.2.2 PHP

2.1.2. Liferay/ .Net Custom CMS

2.1.1 IKONSOFT e oracle server & J2EE

5.3 Apps

2.1.3.1 Phone OEM Platform and Native Devices Deployment Kits

Page 12: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 12/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

12 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

Pricing Structure

Bi SL CORE Modules Price $

Analyticsand

Reporting

1 Finance

2 Human Resources

3 Supply Chain

4 Procurement & Logistics

5 Administration

6 CRM

7 Operations

SL Mandatory Modules

ForecastingEngine 8 Distribution Management

9 Warehouse Management

10 Marketing module

11 MRP I

12 Maintenance & support

13 Assets Tracking

14 Machines Management

SL Optional Modules

BudgetingEngine 11 MRP II

9 Barcode & RFID

6 Sales Force Management

3Workforce and FleetManagement

14 Integration with sensors7 Consumption cycle

  User License

  Services cost

  Maintenance and Support

Page 13: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 13/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

13 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT

Partner Contact Details

EGYPT: Yasmine Building, 8th District, New Maadi, Maadi

Mohammed Magdy +20 10688 41354

GCC & Qatar : Commercial Bank Plaza 14th floor, Westbay , Doha

Mohammed Shafiq +97 46663 5529

Email: [email protected] 

Page 14: 05 ERP Scope of Work

7/23/2019 05 ERP Scope of Work

http://slidepdf.com/reader/full/05-erp-scope-of-work 14/14

ERP.02 REQUEST for Proposal Document ISO 9001: 2008 Certified Company  

14 | P a g e  

Masrur Group LTD Copyright © All Rights Reserved

Registration Number 4138904 IKONSOFT