043-ITP FOR Water Proofing (Buildings).pdf

13

Transcript of 043-ITP FOR Water Proofing (Buildings).pdf

  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887

    Project Document Number: T- 4.318.705 Project Rev.: O Page 2 of 11

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): N/A

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    D O 22.12.08 Company Comments Incorporated SB EO AG CCI

    C O 15.12.08 Issued for Company Comments SB EO AG ICC

    B 08.11.08 Issued for Review SB EO AG IFR

    A 25.10.08 Issued for Internal Review SB EO AG IIR

    GAMA Rev.

    Project Rev

    Date Description Prepared

    By Checked

    By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDEGINEERING AG

    Document Title:

    ITP FOR WATER PROOFING (BUILDINGS)

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC470

    GAM ITP QAC GTL 043 D

    Org.

    Code

    Doc.

    Type

    Disc. Code

    Geogr. Area

    Seq.

    No

    Rev. No

    Vendor Code

    Project Document Number: T-4.318.705

    Rev No: O

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-043

    ITP FOR WATER PROOFING (Buildings) Date: 22.12.2008 Rev. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T-4.318.705 Rev. O Page 4

    1.0 METHOD STATEMENTS/PROCEDURES

    1.1 Method Statements / Procedures Preparation

    Prior to start of activity

    Subcontractor Method Statements / Procedure

    Project Requirements

    QA/QC - I R R

    2.0 MATERIALS CERTIFICATES

    2.1 Verification of water Proofing Materials

    100% T.4.234.582, DEP-

    34.17.10.30 & As per project specification

    Manufacturers Technical data sheet, certificates

    QC Civil Inspector

    GAM-QCR-QAC-GTL- 051

    H R R

    2.2 Storage and handling of Water Proofing Materials.

    100%

    T.4.234.582, DEP-34.17.10.30 & As per manufacturers recommendation

    Temperature between 600F to 800F & air free

    Site Engineer -------- I S S

    3.0 INSPECTIONS

    3.1

    Environmental Conditions

    a) Ambient temp.

    100% T.4.234.582 & As per manufacturers recommendation

    Not less than 600F & Not more

    than 800F

    QC Civil Inspector

    --------- I S S

    3.2

    1) Surface preparation prior to application of water proofing membrane.

    100% T.4.234.582 , DEP-

    34.17.10.30- & Project Specification

    T.4.234.582- Procedure for Building works

    Site Engineer GAM-QCR-QAC-

    GTL-166 I W S

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-043

    ITP FOR PAINTING (Building) Date: 22.12.2008 Rev. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T- 4.318.705 Rev-O Page 5

    2) Application of ,

    a) Slopped Screed

    (AERCEL)

    100% T.4.234.582 , DEP-

    34.17.10.30- & Project Specification

    T.4.234.582- Procedure for Building works

    Site Engineer GAM-QCR-QAC-

    GTL-009 I S S

    3) Application of,

    a) Bonding Adhesive(Sure-Seal 90-8-30A )

    b) Vapour Barriers

    c) Non-reinforced EPDM membrane (RUSS).

    d) Sealant.

    T.4.234.582 , DEP-34.17.10.30- & Project

    Specification & ASTM D 4637

    T.4.234.582- Procedure for

    Building works & Manufacturers

    recommendation

    Site Engineer & QC

    Inspector(Civil)

    GAM-QCR-QAC-GTL-165

    I S S

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-043

    ITP FOR PAINTING (Building) Date: 22.12.2008 Rev. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T- 4.318.705 Rev-O Page 6

    3.3

    In process inspection

    a) Seam Fastening Plates

    b) Splicing Cement application(EP-95)

    c) Lap Sealant application

    a) Visual Inspection

    d) Adhesion check

    T.4.234.582 , DEP-34.17.10.30 & Manufacturers recommendation

    Manufacturers recommendation

    QC Civil Inspector

    GAM-QCR-QAC-GTL-165

    I

    W

    S

    3.4

    In process inspection of final finishing of water proofing membrane.

    a) Visual Inspection

    d) Adhesion check

    Manufacturers recommendation

    Manufacturers recommendation

    Site Engineer & QC Civil Inspector

    GAM-QCR-QAC-GTL-165

    I

    H

    W

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-043

    ITP FOR PAINTING (Building) Date: 22.12.2008 Rev. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T- 4.318.705 Rev-O Page 7

    3.5

    Disposal of high risk wastes such as catalyst drums, chemical drums for first fill, sealant cans

    100%

    T.13.377.450-Construction waste

    Management Procedure

    Check & ensure in Hazard area

    ,flammable area any paint material

    Site Engineer Visual I R R

    3.6 Leakage Test 100% T.4.132.879 & Manufacturers

    Recommendations No Leak

    QC-Inspector (Civil) Visual I W W

  • QSGTL PEARL PROJECT

    C2 ASU Construction Works FORM NO:

    GAM-QCR-QAC-GTL-009 CONCRETE POUR CARD Date :

    Area Location & Type of Structure

    Drawing & Rev No;

    Quantity Reqd(m3); Slump(mm):

    ITP NO:GAM-ITP-QAC-GTL - Rev -

    Class of concrete;

    Slump Flow(mm);

    ITEMS TO BE CHECKED Inspection QC Status

    Check for Ground Condition

    Check for filling and compaction

    Check Minimum blinding thickness as per drawing

    Coating of blind concrete

    Blinding concrete satisfactory and QC released for next activity

    Steel reinforcement fabrication satisfactory as per drawing

    Form work Erecting Satisfactory (Dimension,Cleanliness,oil and Support)

    Anchor Bolts (see Separate survey Report) Embedded Items fixing Satisfactory (Elec/Mech)

    All setting outs verified by the surveyor including Dimensions, Locating and Elevation.

    Blowing with air compressor is Satisfactory

    Pre pour Inspection Satisfactory

    THE APPENDED SIGNATURE GIVES APPROVAL FOR THE PLACEMENT OF CONCRETE DETAILED ABOVE & QC HOLD RELEASED

    ORGANISATION GAMA QATAR LINDE COMPANY

    NAME

    SIGNATURE

    DATE

  • GAM-QCR-QAC-GTL-051

    C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INUSTRIAL CITY

    MAR

    (Material Acceptance Report)

    Project: QSGTL PEARL GTL PROJECT MAR No.: Date:

    Manufacturer:

    PO/Subcontract Number :

    Description of the Proposed Material:

    QTY: Nos:

    Note:

    Involved Discipline:

    Civil Mechanical Welding Instrumental

    Civil / Buildings Mech. / Piping Electrical Others ..

    Location & Usage of the Delivered Material:

    Applicable Specifications & Technical Details:

    Proposed material complies with applicable project specification Yes No

    Attachments: Inspection Report Mill Certificates Others

    Release Note Data Sheets

    Comments:

    Carried out By DATE NAME SIGNATURE

    Accepte

    d B

    y GAMA REP.

    VENDOR REP.

    LINDE REP.

    QSGTL REP.

  • GAM-QCR-QAC-GTL-165

    C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Water Proofing(Buildings) Works

    Check List

    Subcontract Ref.: Report No.:

    Item Description: Date:

    Item Location/ Area: ITP No.: GAM-ITP-QAC-GTL-

    Subsystem: Test Code No.:

    Ref. DWG / Docs:

    Used Measuring and test equipment ref. (if applicable):

    Check the following:

    Item

    No.

    Description QC Inspector

    Initial Date

    1. Cleaning of top surface ( after screed concrete)

    2. Sure-Seal(Balck-060)

    3. 6RUSS membrane fixing

    4. Splicing Cement (EP-95) & Sure Seal application.

    5. EPDM membrane application (1.52mm thick).

    6 Lap Sealant application

    7. Seam Fastening Plates fixing

    8. Cleaning the top surface of the water proofed area.

    9. Leak Test

    10. Final check for hand over

    The above water proofing Installation has been Satisfactorily completed in accordance with the Drawings& Specifications.

    ORGANIZATIONS NAME SIGNATURE DATE

    Accepte

    d B

    y

    THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    QSGTL OR its PMC REP.

  • QSGTL-PEARL GTL PROJECT

    C2-ASU-Construction Project

    Inspection Form for Surface

    Preparation(Buildings)

    GAM-QCR-QAC-GTL-166 GAM-ITP-QAC-GTL- Rev.

    Date :

    Location Bldg/Area:

    Drawing No:

    Item Details of Activity Remarks

    Sign off will Confirm Released to Next activity

    GAMA QATAR LINDE QSGTL or its PMC

    Name

    Signature

    Date

    GAM-QCR-QAC-GTL- 166