04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the...

18
07/20/22 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site (as defined by local managers) To rate the chances of success using video- derived information (based on current knowledge) - 4 * rating * Hopeless (NB star rating is specific to Teignmouth) ** Some hope of success *** Good chance of success **** Excellent chance of success • To suggest a frame of reference for selected strategic and operational objectives NB Video does not have to do everything! We

Transcript of 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the...

Page 1: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 1

IntroductionAIMS:• To state the strategic and operational objectives for the

Teignmouth site (as defined by local managers)

• To rate the chances of success using video-derived information (based on current knowledge) - 4 * rating

* Hopeless (NB star rating is specific to Teignmouth)** Some hope of success*** Good chance of success**** Excellent chance of success

• To suggest a frame of reference for selected strategic and operational objectives

NB Video does not have to do everything! We need to focus on a few viable demonstration examples for each site.

Page 2: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 2

Approach Taken

1) Avoid tackling operational objectives rated at *2) Continue research into operational objectives rated at ** or

above3) Focus efforts and prioritise work on those operational

objectives rated *** or ****

Notice that this approach is reality-driven rather than priority-driven!

But…

Research into new and exciting areas in not halted.

Page 3: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 3

Strategic objective

3. Intervention procedure

4. Evaluation procedure

System knowledgeCSIsMonitoringMeasurementModelling

Operational objective

Reference state

Current state

1. Quantitative state concept

2. Benchmark

Frame of reference

Long-term management vision & policy

Describes how part, or all of the strategic objective will be achieved in a four-stage process

Management Context

Page 4: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 4

Issues Addressed (1)

Management context: Navigation

1) Strategic Objective: ‘To maintain a safe, navigable shipping channel’

Operational Objectives:a) ‘To ensure that the navigation buoys accurately mark

the limits of the channel’ ***b) ‘To maintain an optimal and economic dredging

strategy’ **c) ‘To give advanced warning of channel infilling’ **

Page 5: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 5

Issues Addressed (2)

Management context: Navigation

1) Strategic Objective: ‘To maintain optimal and efficient usage of the harbour’

Operational Objective(s):a) ‘To monitor the number of vessels entering / leaving

and within the harbour’ ***b) ‘To monitor the type of vessel using the harbour’ **…

Page 6: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 6

Issues Addressed (3)

Management context: Coastal Protection

1) Strategic Objective: ‘To provide safety against flooding in combination with sustainable preservation of the functions and value of the beach. ’

Operational Objectives:a) ‘To ensure that there is an adequate volume of sand in

the system (to protect the coast and avoid undermining of coastal structures)’ ***

b) ‘To maintain beach width above some reference value’ ***

… beach volumes, MCLs etc..

Page 7: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 7

Issues Addressed (4)

Management context: Recreation

1) Strategic Objective: ‘To preserve the safety of swimmers at all times’

Operational Objectives:a) ‘To make lifeguards and the general public aware of

the existence and location of swimming hazards’ ****b) ‘To avoid swimming when wave heights are excessive’

**‘To avoid swimming when currents are excessive’ **

Page 8: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 8

Results

5 operational objectives rated *** to ****

- ‘To ensure that the navigation buoys accurately mark the limits of the channel’ ***

- ‘To monitor the number of vessels entering / leaving and using the harbour’ ***

- ‘To ensure that there is an adequate volume of sand in the system to protect the coast and avoid undermining of coastal structures’ ***

- ‘To provide advance warning of erosion hot-spots’ ***- ‘To make lifeguards and the general public aware of the

existence and location of swimming hazards’ ****

Page 9: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 9

Strategic objective

3. Intervention procedure

4. Evaluation procedure

SCSI:wave breakinginter-tidal mappingcurrent structurebuoy positionIBCSI:Channel positionChannel-buoy inter-distance

Operational objective

Reference state

Current state

1. Quantitative state concept

2. Benchmark

‘To maintain a safe, navigable shipping channel’

‘To ensure that the navigation buoys accurately mark the limits of the channel’

Current channel-buoy inter-distance

Max. safe channel-buoy inter-distance

Move buoys Review grounding statistics

Navigation

Page 10: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 10

Strategic objective

3. Intervention procedure

4. Evaluation procedure

IBCSI: No. vessels entering No. vessels leaving No. vessels in

harbour

Operational objective

Reference state

Current state

1. Quantitative state concept

2. Benchmark

‘To maintain optimal and efficient usage of the harbour’

‘To monitor the number of vessels entering / leaving the harbour’

Current no. of vessels in harbour

Max & Min values for acceptable use

Different for over and under-use of the harbour

- Economic statistics

Navigation

Page 11: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 11

Strategic objective

3. Intervention procedure

4. Evaluation procedure

SCSI: Video-derived

shorelinesIBCSI: Total inter-tidal sand

volume

Operational objective

Reference state

Current state

1. Quantitative state concept

2. Benchmark

‘To provide safety against flooding in combination with sustainable preservation of the functions and value of

the beach. ’

‘To ensure that there is an adequate volume of sand in the system’

Current vol. inter-tidal sandor extrapolated trend

Threshold-value based on historic & natural variability

Nourishment?Hard defence?Revise dredging?

Flooding statistics

Coastal Protection

Page 12: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 12

Strategic objective

3. Intervention procedure

4. Evaluation procedure

SCSI: Video-derived

shorelinesIBCSI: Inter-tidal beach

width

Operational objective

Reference state

Current state

1. Quantitative state concept

2. Benchmark

‘To provide safety against flooding in combination with sustainable preservation of the functions and value of

the beach. ’

‘To preserve beach width’

Current beach widthor extrapolated trend

Threshold-value based on historic & natural variability

Nourishment?Hard defence?Revise dredging?

Flooding statisticsBeach Use

Coastal Protection

Page 13: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 13

Strategic objective

3. Intervention procedure

4. Evaluation procedure

SCSIs- Sandbar positions- Channel positionsIBCSI: Hazard locations

labelled & marked on map / image

Operational objective

Reference state

Current state

1. Quantitative state concept

2. Benchmark

‘To preserve the safety of swimmers at all times’

‘To make lifeguards and the general public aware of the existence and location of swimming hazards’

Current hazards

Hazards absent

- Move swimming zone- Warn public of the existence & locations of hazards

Review public awareness of

hazards

Recreation

Page 14: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 14

Conclusions

• This approach has allowed us to focus on viable video applications (‘reality-driven approach’)

• Application of the frame of reference is helpful but…- Definitions of operational objectives and CSIs within

the frame of reference are still vague and will have to be tightened up (interaction with local managers)!

- Evaluation and assessment of video-derived CSIs will help to improve the frame of reference definitions and reveal the optimum choice of CSIs.

• The success of the project will be assessed on our ability to demonstrate the utility of video for coastal zone management!

Page 15: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 15

Workshop• How many? Where?

4 workshops centred around the four CoastView field sites

• Methodology:

- We should work together on the content but deliver the workshops independently (avoids language barrier)

• Audience: Range of managers – National scale to local scale, political & technical.

• Content

1. General introduction stating the aims and objectives of the project

2. An outline of what a video is and what it’s capable of, indicating the where appropriate the potential management benefits

3. Give specific examples of the outcomes of the CoastView project showing explicitly how video derived CSIs can assist in the coastal management process.

4. General discussion – centred around the frame of reference.

Page 16: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 16

Action:

We need examples of how video can assist the coastal management process (i.e. make it cheaper, faster, more effective)

We need examples for each site by this time next year!

Page 17: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 17

Journal Special Issue

• Mark Davidson to approach editor with a specific description (relevant for Coastal Eng. ?)

• Submitted: Feb 2005, Pub. July 2005• Contents

•Intro UPl •Methodology Mark et al.•Long-term beach protection / management (Led by UU)•Navigation (UCa, UPl)•Bar migration (UU)•Spit dynamics (UCa)•Influence of protective structures (UBo)•Recreation (UPl, UBo)•Data-driven modelling (WL UPl)•Hydrodynamic CSIs (Wl, UPl)

Page 18: 04/09/2015 Mid-term CoastView Meeting – Santander, Spain 1 Introduction AIMS: To state the strategic and operational objectives for the Teignmouth site.

04/19/23 Mid-term CoastView Meeting – Santander, Spain 18

Proposal that each paper considers:

a) Video-derivation of CSIs currently used by managers’

b) New CSIs identified by the manager where video can help

c) Progress ob Scientific CSIs which may be useful to managers in the future