04-May-11 / 1
Information You Can Use: Successful Handoffs of Information
Michael Kenig, Holder Construction, COAA COBie Case Study Manager
Sam Westbrook, Senior Manager, information exchange services, Holder Construction
Draft
![Page 2: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/2.jpg)
Today:
1. Review of COBie Case Study and “What is COBie?”
2. COAA COBie Case Study
3. Challenges/ Lessons/ Discussion
![Page 3: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/3.jpg)
04-May-11 / 3
COBie: overview
presented by:
Bill East, PhD, PE, F.ASCEEngineer Research and Development Center, Champaign, IL
Baltimore – May 4, 2011
![Page 4: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/4.jpg)
04-May-11 / 4
![Page 5: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/5.jpg)
04-May-11 / 5
SpacesScheduled
EquipmentWarranties and Spares
Approved Submittals
Layout DrawingsPerformance
Standards
COBieSpecifiers’ Propertiesinformation exchange
(SPie)
Equipment Layoutinformation exchange
(ELie)
![Page 6: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/6.jpg)
04-May-11 / 6
“this all sounds great, now prove it…”
![Page 7: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/7.jpg)
04-May-11 / 7
COBie case study: approach
presented by:
Bill East, PhD, PE, F.ASCEEngineer Research and Development Center, Champaign, IL
![Page 8: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/8.jpg)
04-May-11 / 8
new process
plan
do
check
act
clearly stated, measurable goals
partnering, contract agreements document and
compare actual
lessons learned,recommendations
![Page 9: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/9.jpg)
04-May-11 / 9
implementation plan
public commitmentMay 2011 – IntroductionNov 2011 – Update
public distributionprocesses and metricsupdated contractspoints of contact
“the good, the bad, and the ugly”
![Page 10: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/10.jpg)
YouTube:COBie CollegeHighly recommend
Class 1, Overview- Part 3!
![Page 11: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/11.jpg)
COBieAir Handler Unit COBie standard AHU
What I thought…(COBie is a spreadsheet):
Design/Manufacturer
Data
FM System
![Page 12: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/12.jpg)
What is COBie?A concept or idea?A process? (as in the “COBie process”?)
A spreadsheet? (as in “COBie spreadsheet”?)
A specification? (as in “COBie specification”?)
A data format? (as in “COBie data”?)
A model? (as in “COBie model”?)
A solution? (to the “COBie problem statement”?)
Mike Kenig
![Page 13: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/13.jpg)
Gathering the data:• Job crawl• Manually gather as
it comes in• File Transfer• Automatic Transfer
– IFC (spff or XML)
Transferring the data:• Manually enter it• Import file
– Custom interface– Spreadsheet
• Automatic Transfer– IFC (spff or XML)
![Page 14: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/14.jpg)
The Problem
![Page 15: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/15.jpg)
Information Exchange: Manual
Design
Manufacturing Construction
Operation
Data is gathered through manual input
![Page 16: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/16.jpg)
The Solution
![Page 17: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/17.jpg)
Information Exchange: Example Spreadsheet
Spreadsheet: human readable REQUIRES
human interaction
![Page 18: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/18.jpg)
Information Exchange:
COBie
Design/ PreconstructionManufacturing
Construction
Operation
Speak the same
language throughout
the process
![Page 19: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/19.jpg)
您好 Hola
Hello
(required)
![Page 20: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/20.jpg)
您好 HolaHello Hello
![Page 21: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/21.jpg)
What is COBie?An idea?A format?A standard?A process?
All of these! The Solution!
![Page 22: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/22.jpg)
COBie Case Study Reflection
![Page 23: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/23.jpg)
Project
Green
![Page 24: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/24.jpg)
04-May-11 / 24
Problem• Manual Process
– Constant Recollection of Data• Lack of Uniformity
– Design Team, Subcontractors, Facility Operator
• Inefficiencies from Commissioning to FM OPS
• Inefficient Access to Documents (Warranty, StartUp, etc…)
![Page 25: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/25.jpg)
04-May-11 / 25
Metrics – Anticipated Effects• Reduction in Data Entry Time
• Accessibility of Documentation Improved
• Time Reduction from Commissioning to full FM Operations
• More Efficient Use of FTE’s = $ Savings
• Improved Data Uniformity and Quality
![Page 26: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/26.jpg)
04-May-11 / 26
Process Before
![Page 27: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/27.jpg)
27
“The Hard Work”Process Change & Implementation
• Engaged 3rd Party - Maximo (MEA) Integration
• Determined Data Attributes to be Collected
• Modified Maximo to Accommodate New Attribute Types Collected
• Assessed COBie Spreadsheet and Aligned with Business Needs
• Planned for Data Collection, Exchange and Quality Assurance
![Page 28: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/28.jpg)
28
“The Hard Work”Process Change & Implementation• Commissioned Subs for Data Collection
• Tested: Import / Collection Processes– Assessed and Modified as Needed– Repeated (Multiple Times)
• Launched Live Data Uploads
![Page 29: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/29.jpg)
New Process
![Page 30: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/30.jpg)
30
Metrics/Results/Conclusions1) Time/Financial Savings
2) Data Quality / Uniformity Improvements
3) Repeatable Process - Efficiencies Generating Savings to be Invested in Future Growth.
![Page 31: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/31.jpg)
Recommendations1) Collect SN’s and Barcode at Dock Receiving
2) Partner with Vendor - SN’s in Advance of Shipment
3) Engage 3rd Party Software Support Early
4) Allow Ample Time for Import Testing
![Page 32: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/32.jpg)
Challenges & Lessons
Discussion?
![Page 33: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/33.jpg)
Information Exchange lessons…• How you “gather” AND how you “transfer”
• Spreadsheet vs. IFC? (may vary by stage)
• More effort initially for future benefit
![Page 34: 04-May-11](https://reader036.fdocuments.in/reader036/viewer/2022062316/568168b9550346895ddfa13b/html5/thumbnails/34.jpg)
More Information Exchange lessons…• It’s not about the BIM model (it’s the data!)
• It takes a village… have to have multiple champions (including IT!)
• And, the BIG ONE: Is it all or nothing?!