  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887

    Project Document Number: T- 4.250.929 Project Rev.: B Page 2 of 9

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): N/A

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    F B 09.10.08 Company Comments Incorporated SK EO AG CCI

    E B 17.09.08 Issued For Review SK EO AG IFR

    D A 24.04.08 Ready for Construction BR UA ZG RFC

    C O 05.12..07 Issued for Company comments BR AU/MC ZG ICC

    B 27.11.07 Issued for Review BR AU/MC ZG IFR

    A 22.11.07 Issued for Internal Review BR AU/MC ZG IIR

    GAMA Rev.

    Project Rev

    Date Description Prepared

    By Checked

    By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    PROCEDURE FOR EQUIPMENT NITROGEN PURGING

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC470

    GAM PRO QAC GTL 036 F

    Org.

    Code

    Doc.

    Type

    Disc. Code

    Geogr. Area

    Seq.

    No

    Rev. No

    Vendor Code

    Project Document Number: T-4.250.929

    Rev No: B

  • Doc. Title : PROCEDURE FOR EQUIPMENT NITROGEN PURGING

    Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08

    T-4.250.929 REV-F

    Page 4 of 9

    QQQ AAA TTT AAA RRR

    TABLE OF CONTENTS

    1. SCOPE ________________________________________________________________________ 5

    2. PURPOSE _____________________________________________________________________ 5

    3. HSSE _________________________________________________________________________ 5

    4. REFERENCE __________________________________________________________________ 5

    5. DEFINITIONS _________________________________________________________________ 6

    6. RESPONSIBILITIES ____________________________________________________________ 6

    7. GENERAL _____________________________________________________________________ 7

    8. SAFETY REQUIREMENTS _______________________________________________________ 7

    9. PROCEDURE __________________________________________________________________ 7

    10. QUALITY ASSURANCE ________________________________________________________ 8

    11. ATTACHMENTS ______________________________________________________________ 8

  • Doc. Title : PROCEDURE FOR EQUIPMENT NITROGEN PURGING

    Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08

    T-4.250.929 REV-F

    Page 5 of 9

    QQQ AAA TTT AAA RRR

    1. SCOPE

    This procedure applies to the Preservation by Nitrogen purging of equipments to be installed in C2 ASU PEARL GTL PROJECT by Gama Qatar

    2. PURPOSE

    The main purpose of this procedure is to describe the minimum requirements applicable to the Preservation of equipments by Nitrogen purging and to determine the preservation activities in compliance with the contract and manufacturer/Vendor requirements.

    3. HSSE

    All works shall be in compliance with the State of Qatar laws and regulations, Ras Laffan Industrial City and International standards, codes, LINDE ENGINEERING AG and QSGTL and/or its PMC requirements and instructions. In addition all employees and GAMA subcontractor employees on site will have through LINDE ENGINEERING AG Site Safety Induction and GAMA Qatar Safety induction for site safety, health, environmental and security prior to work activities. Other training courses will be attended as required by LINDE ENGINEERING AG or QSGTL and/or its PMC as required.

    4. REFERENCE

    DEP 31.29.00.10 Installation of Rotating Equipment

    DEP 70.08.10.11 Equipment & Tools for Maintenance (Mechanical

    Maintenance Equipment, Tools and Bolt Tensioning)

    DEP 70.10.70.11 the preservation of Old and New Equipment and Pipe

    Standing Idle

    T-4.250.927 Material Handling and Storage

    T-4.250.932 Preservation of Equipment

    T-4.234.542 Project Quality Plan

  • Doc. Title : PROCEDURE FOR EQUIPMENT NITROGEN PURGING

    Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08

    T-4.250.929 REV-F

    Page 6 of 9

    QQQ AAA TTT AAA RRR

    5. DEFINITIONS

    Company : QSGTL/or its PMC

    Contractor : LINDE ENGINEERING AG Sub Contractor : GAMA QATAR Contract : QSGTL Pearl Plant - C2 ASU Project QCR : Quality Control Record QCP : Quality Control Procedure QCE : Quality Control Engineer QCI : Quality Control Inspector QA/QC : Quality Assurance / Quality Control TPI : Third Party Inspection

    6. RESPONSIBILITIES

    1. GAMA Construction Manager or his designee shall be responsible to eliminate

    the leaks and to restore the pressure at the value of minimum 0.2 barg in accordance with this procedure and Contractors dispositions

    2. GAMA QA/QC Mechanical Superintendent shall be responsible, to ensure a check of the nitrogen pressure, damages to the valves, gauges and the external surface protection is conducted once a week

    3. HSSE Engineer- shall be responsible for monitoring safety performance & where necessary Initiating corrective action through line management.

  • Doc. Title : PROCEDURE FOR EQUIPMENT NITROGEN PURGING

    Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08

    T-4.250.929 REV-F

    Page 7 of 9

    QQQ AAA TTT AAA RRR

    7. GENERAL

    Source of Nitrogen. 1. Nitrogen which is shipped with equipment. 2. Nitrogen should be pure (99.9 % of purity) NB: Nitrogen purging requirements are in accordance with Manufacturers instructions

    8. SAFETY REQUIREMENTS

    Nitrogen cylinders shall be secured to a wall or post so they will not tip over or fall. Gas regulators and cylinder must be checked for damaged threads, dirt, dust, oil or grease. Dust and dirt must be removed with a clean cloth, while regulators/cylinder with damage thread replaced.

    9. PROCEDURE

    Upon receipt from Contractor the Quality Control Inspector shall check the equipment for nitrogen purging requirement and prepare the Nitrogen purging report (Attachment ). the pressure gauges shall be properly protected The shell side and tube side of the equipment shall be filled with nitrogen at

    high purity grade (99.9) and pressurized at a 0.2 barg or as specified by manufacturer / Vendor.

    The equipment shall be protected to avoid damage to the valves, gauges, etc. as specified by the equipment Manufacturer.

    The nitrogen pressure shall be checked once a month and pressure of shell side shall be recorded on the report.

    In case of pressure loss the nitrogen pressure shall be restored using the nitrogen bottle attached to the equipment.

  • Doc. Title : PROCEDURE FOR EQUIPMENT NITROGEN PURGING

    Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08

    T-4.250.929 REV-F

    Page 8 of 9

    QQQ AAA TTT AAA RRR

    If any leaks are found, the inspector shall inform the supervisor / Contractor to take corrective action and shall investigate cause of leaks. The pressure restored immediately.

    The leaks shall be eliminated in accordance with the disposition of Contractor and the pressure restored with nitrogen at the value of a minimum 0.2 barg and as specified by manufacturer / Vendor.

    If a small drop in nitrogen pressure is noticed, connect the nitrogen hose and the equipment, open nitrogen regulator and pressure up the equipment as per the vendor instruction manual.

    If a complete drop in pressure is noticed, then prior to re-pressurising with nitrogen, all air in the equipment shall be removed by flushing the equipment with nitrogen. This is achieved by introducing nitrogen through the inlet valve while keeping the outlet valve open to allow the escape of air from the equipment. This shall continue until all entrapped air is removed, and verified by measuring the oxygen content of escaping gas. Such incident shall be informed to Contractor prior to depressurising the equipment.

    10. QUALITY ASSURANCE

    A Quality Assurance System shall be operated conforming to related standards. Controls and checks shall be established and documented.

    11. ATTACHMENTS

    GAM-QCR-QAC-GTL-069

  • PROJECT: C2 ASU PEARL GTL PROJECT, RAS LAFFAN INDUSTRIAL CITY

    EQUIP. TAG.NO.: DESCRIPTION: LOCATION:

    MANUFACTURER: DRG.NO.: RFI NO:

    MONTH

    1 2

    3 4 5 6

    7

    8

    9

    10

    11

    12

    ACTIVITY Month

    Date Checked

    Check all internal and accessories storage is acceptable

    Visual Check : Is there any damage

    Check for protective covers on all the openings

    Check all warning labels, like N2 warning plate are existent

    Check Purge Pressure level

    If Re-purge is required, indicate pressure level

    GAMA SIGN WITH DATE

    LINDE SIGN WITH DATE

    QSGTL or its PMC

    GAM-QCR-QAC-GTL-069

    STORAGE, PRESERVATION AND NITROGEN PURGING REPORT