02.09.2009 S. 1
Pilot study 2: Assessment of sediment traps
02.09.2009 S. 2
Sediment trap Wedel
Bearing: March 2008HPA 223
02.09.2009 S. 3
Sediment trap Wedel
Trap built 5.5.08-23.06.08
Depth ~ 2m
Width~300 m
Leng
th ~
2 k
m
New sedimentation rate~ 10000 to 12000 m³ per day
Sieblinien Strom-Km 641-643 Feb.2008 Sande
0
20
40
60
80
100
10 100 1000 10000
Körnungsdurchmesser (µm)
(Gew
icht
s-%
)
W08-001_95-200
W08-002_140-200
W08-004_80-180
W08-005
W08-006
W08-007
W08-015
W08-016
63 200 63020
Grain-size of bottom material in µm
Vo
lum
e in
%
02.09.2009 S. 4
Monitoring programme
• Echo sounding• Water (temperature, salinity,
oxygen, current, pollution)• Suspended sediment and bed load
(concentration, grain size, pollution)• Fish (survey of fish eggs and larvae)
Cross-section:
water sample
Aanderaa turbiditydevice
Calibration of the long-term turbidity measurements
bottom
Aanderaa RCM 9 or Aanderaa seagurad
Long-term measurement with Aanderaa measuring devices
Near bottom measuring device within the sediment trap