02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production...
Transcript of 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production...
![Page 1: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/1.jpg)
Bjørn SøgårdMay 19th 2008
Introduction to Subsea Production System
02 Drilling and Wellhead System
![Page 2: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/2.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
2
This module will cover:
� Applicable codes and standards
� Reservoir Engineering
� Subsea Wells
� Subsea Well Program
� Wellhead Equipment
� Running Tools
� Deepwater drilling
Subsea Drilling and Wellhead Systems
![Page 3: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/3.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
3
Goals
� Understand the premises and interfaces to the drilling activity
� To understand the main building blocks in a well
� To be able to participate in debates regarding drilling activity and well architecture
![Page 4: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/4.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
4
Applicable codes and standards
Main codes for wellhead and drilling:
� API 6A/ISO 10423 Specification for Wellhead and Christmas Tree Equipment
� API 17D/ISO 13628-4 Subsea wellhead and tree equipment
� API 16A / ISO 13533 Specification for Drill-through Equipment
� + ASME, ISO, BS +++
� NORSOK D-010
� NORSOK U-001
![Page 5: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/5.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
5
Reservoir Engineering
Ormen Lange Reservoir, 350 km2 2000 meter below seabed:
![Page 6: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/6.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
6
Reservoir Engineering
Ormen Lange Reservoir:
![Page 7: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/7.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
7
The main development well types:
� Exploration wells
� Production wells (oil, gas)
� Injection wells (water, gas)
Well design through the reservoir:
� Vertical
� Deviated
� Horizontal
� Multi branch (side-track)
Enhanced Recovery:
� Water injection
� Gas injection
� WAG; water alternating gas injection
� Artificial lift
Subsea Wells
![Page 8: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/8.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
8
Typical Subsea Well Program:
� Drill 36” hole to ~80m
� Run and cement 30” Conductor
� Drill 26” hole to ~800m
� Run and cement 20” casing with 18 3/4” WH
� Run Blow-out-preventer (BOP)
� Drill 17 ½” hole to ~1300m
� Run and cement 13 3/8” Casing
� Drill 12 1/4” hole to ~1700m
� Run and cement 9 5/8” Casing
� Drill 8 ½” hole to ~2000m
� Clean up well
� Abandon well (run plug or close valve)
� Proceed to completion operations
This program can be a 100 days plan
Subsea Well Program
BOP
![Page 9: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/9.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
9
Xmas Tree Systems
Typical Tree Installation Sequence:
� Install Xmas Tree on Wellhead using drill string and Tree Running Tool (TRT)
� Recover TRT
� Run BOP and marine riser
� Remove down hole plugs
� Run completion / production tubing
� Perforate tubing at reservoir depth
� Inhibit well and prepare to abandon
� Install internal tree cap
� Retrieve marine riser and BOP
� Drill rig moves to next well
� Flowlines and flying leads installed by Rig or installation vessel
XTXT
BOP
![Page 10: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/10.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
10
Well Completion
UNSTABLEROGALANDSHALES
RESERVOIR
18-3/4" wellhead
36"/30" conductor at 940 mTVD
13-3/8 x 13-5/8" intermediate casing set in17 1/2" hole at 2100 - 2200m TVD.
7 " lower completion.
20" surface casing at 1600mTVD
36" conductor housing
18 3/4" X 7" X 2" tubing hanger
2 x 7" TRSSSV’s
18 3/4" X 13 3/8" casing hanger
9 5/8" liner in 12 1/4" hole to top reservoir at2705m TVD over sail section, to prevent shale
9-5/8 x 7" production packer.9-5/8 x 13-3/8" liner hanger.
9-5/8" production tubing, with production packer setbelow 9 5/8" liner lap.7" tail pipe available for deep set plugs anddownhole gauge positioning.
9-5/8" x 7" lower completion packer
9-5/8 x 7" full bore isolation valve
7" formation isolation valve
![Page 11: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/11.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
11
Well Completion
![Page 12: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/12.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
12
Wellhead Equipment
18 ¾” Wellhead Housing
30” Conductor Housing
9 5/8” Casing Hanger
18 ¾” Packoff
(Annulus seal assembly)
13 3/8” Casing Hanger
Drilling Guide Base
The wellhead system suspends the casing and serve as a barrier for well fluids against the environment.
There are 5 main suppliers of subsea Wellhead systems:
- Vetco Gray
- FMC
- Aker Kvaerner Subsea
- Drill-Quip
- Cameron
The wellheads are usually designed according to API 17D (ISO13628-4) and API 6A (ISO10423).
The 18 3/4 ” Wellhead Housing often has a H4 Vetco external profile for subsea wells.
The internal seal and locking profiles are supplier specific.
Main Components:
Casing Diagram
![Page 13: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/13.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
13
Wellhead Equipment
![Page 14: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/14.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
14
Deepwater Drilling
An increasing number of the subsea wells worldwide are located in deepwater. Deepwater is usually defined as water depths from 300 – 1500 m, with greater than 1500 m water depth classified as ultra deepwater. These depths impose significant challenges with respect to subsea drilling.
Existing drilling rigs allow for drilling in water depths in the order of 2400 m. New generation drill rigs and drill ships are being designed for water depths beyond 3000 m.
In deep water, drilling requires very heavy equipment, drilling operations and well control procedures are more difficult and well costs can rise dramatically.
http://www.youtube.com/watch?v=9PNMDV2v9oA&feature=related
![Page 15: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/15.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
15
Mono Bore Drilling
![Page 16: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/16.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
16
Buzz group
� What are the main principles in order to get the oil and gas?
� Please give details…
![Page 17: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/17.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
17
![Page 18: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/18.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
18
30” Conductor Housing
BACKBACK
Wellhead Locking Profile
Running Profile
Flow by Port
Guidebase Landing Shoulder
Conductor Extension
![Page 19: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/19.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
19
18 3/4” Wellhead Housing
BACK
Lockdown ring
Vetco H4 Profile
![Page 20: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/20.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
20
13 3/8” Casing Hanger
BACK
13 3/8” Casing Pup Joint
![Page 21: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/21.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
21
9 5/8” Casing Hanger
BACK
Landing Shoulder
Fluted Centraliser
9 5/8” Casing Pup Joint
![Page 22: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/22.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
22
18 3/4” Pack-off
BACKLocking Mandrel
Metal Seal
Wellhead Lock Ring
![Page 23: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/23.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
23
Drilling Guide Base
BACK
![Page 24: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/24.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
24
Casing Diagram
BACK
![Page 25: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/25.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
25
Subsea BOP
BACK
![Page 26: 02 Drilling and Wellhead System - Universitetet i · PDF fileIntroduction to Subsea Production System 02 Drilling and Wellhead System ... Production wells (oil, gas) Injection wells](https://reader034.fdocuments.in/reader034/viewer/2022050722/5aa0e9147f8b9a89178eb4bd/html5/thumbnails/26.jpg)
© Det Norske Veritas AS. All rights reserved.
May 19th 2008
26
Safeguarding life, property and the environment
www.dnv.com